PLM-Aging Inspection | 12/18/2002 | 12/18/2002 | 12/18/2002 | | PASS |
Bill VanDegrift
|
|
|
this is for the underground only and it is complete final ok 12/18/2002 8:21:05 AM
|
Groundwork | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PART |
Bill VanDegrift
|
|
|
DONNY ###-#### GRID # G 5,6,7 trench drains 6/7/2002 10:59:45 AM
|
Groundwork | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | PART |
Bill VanDegrift
|
|
|
grid work for a, b, & 6 --###-####- heidi waste only, needs to increase trap to a 4" 5/24/2002 1:52:11 PM
|
Groundwork | 5/16/2002 | 5/17/2002 | 5/17/2002 | A | PART |
Bill VanDegrift
|
|
|
###-#### trench drain main s.w. test ok 5/17/2002 10:09:40 AM
|
Other | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 4/29/2002 3:29:01 PM met with debest and engineer, lathon, etc. on tee pulling
|
Groundwork | 3/18/2002 | 3/19/2002 | 3/19/2002 | A | PART |
Bill VanDegrift
|
|
|
###-#### teri basement broiler room vent test ok , grease and ss extentions into basement east end ok 3/19/2002 11:48:55 AM
|
Groundwork | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/15/2002 at 08:32:56. Contact: ###-####. partial gw and domestic water test 3/15/2002 2:59:46 PM
|
Groundwork | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 16:46:26. Contact: ###-####. trench drains in bagage area, another 30' icw in basement, ventsby equipment pads in basement. 3/13/2002 12:10:19 PM
|
Plumbing Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 | A | NR |
Bill VanDegrift
|
|
|
###-#### grids waste and vent and domestic water grids D, 2B, 82 & 3
|
Plumbing Rough-in | 3/6/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 14:58:54. Contact: ###-####. restroom ri basement, partial grease waste test ok 3/7/2002 2:48:23 PM
|
Plumbing Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 12:04:52. Contact: ###-####. partialri ok waste in basement ceiling for public restrooms 3/4/2002 4:03:49 PM
|
Groundwork | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PART |
Bill VanDegrift
|
|
|
for grids 9 & e-donny ###-#### partial gw ok 3/1/2002 2:51:22 PM
|
Groundwork | 3/1/2002 | 3/1/2002 | 3/1/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 09:22:18. Contact: ###-####. doubled up on inspection requests 3/1/2002 2:51:52 PM
|
Groundwork | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 10:23:39. Contact: ###-####. part g/w ok, 4" from basement stubbed twards eastern grease interceptor 2/19/2002 12:05:25 PM
|
Groundwork | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 09:42:26. Contact: ###-####. 1st floor section a grids e and f point and 3 partial gw ok s.s. and osw main, need a vent from oil trap 1/30/2002 3:53:51 PM
|
PLM-Aging Inspection | 1/21/2002 | 1/21/2002 | 1/21/2002 | | NR |
Bill VanDegrift
|
|
|
|
Groundwork | 11/20/2001 | 11/20/2001 | 11/20/2001 | P | PART |
Bill VanDegrift
|
|
|
Added by Inspector: 330 On 11/20/2001 2:48:32 PM col C grid 6-7 restrooms ok
|
Plumbing Rough-in | 11/19/2001 | 11/20/2001 | 11/20/2001 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/19/2001 at 16:10:22. Contact: ###-####. SECTION C BETWEEN GRIDS 6 & 7
|
Groundwork | 11/2/2001 | 11/5/2001 | 11/5/2001 | A | PART |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 11/02/2001 at 15:15:56. Contact: ###-####.FIRE PUMP ROOM ; ok 11/5/2001 2:03:44 PM
|
Groundwork | 11/1/2001 | 11/2/2001 | 11/2/2001 | A | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 11/01/2001 at 10:47:28. Contact: ###-####.
|
Groundwork | 10/30/2001 | 10/31/2001 | 10/31/2001 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/30/2001 at 15:41:13. Contact: ###-####. Grids 1 through 4 and B through C.8 around 2:30 2 floor sinks and a trench drain 10/31/2001 2:06:08 PM
|
Groundwork | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/29/2001 at 13:21:42. Contact: ###-####. between grids 1& 3 B.5 through D.5 one section passed , the larger section had a pin hole in it and I'll reinspect it in the morning 10/29/2001 4:38:32 PM
|
Groundwork | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by Inspector: 330 On 10/29/2001 4:42:47 PM boiler room south west 10/30/2001 9:44:22 AM
|
Groundwork | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/25/2001 at 15:58:07. Contact: ###-####. mech.pit underground drainage 10/26/2001 10:18:07 AM
|
Groundwork | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 14:22:51. Contact: ###-####. deep waste in basement grids D.25 / 2.75 thru 6.5 test ok 9/25/2001 9:28:50 AM
|
Groundwork | 9/20/2001 | 9/21/2001 | 9/21/2001 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 14:24:43. Contact: ###-####. main trunk line from sump area on west end of building to halfway across basement test ok. 9/21/2001 4:34:42 PM
|
Groundwork | 9/20/2001 | 9/21/2001 | 9/20/2001 | A | CANC |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 09/20/2001 at 13:30:35. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/20/2001 at 14:22:32.
|