Information based on query as of Saturday, July 20, 2024.
Permit Information
Permit NumberPLM03-01090
StatusFinaled
Name BUSS MECHANICAL SERVICES INC
Site Address 2288 N GARDEN ST
Project Name 
Customer Number 
ePlanReview 
Description
Plumbing waste vents water and fixtures per initial cert of value $29,000
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/24/20037/25/20037/25/2003PPASS
DetailsBill VanDegrift
final ok 7/25/2003 3:32:41 PM
Final7/22/20037/22/20037/22/2003PPART
DetailsBill VanDegrift
just needs to test the rp on the steamer and now they've got to get culligan to get a permit for a water softener, dlb fee 7/22/2003 4:26:43 PM
Final7/18/20037/18/20037/18/2003PPART
DetailsBill VanDegrift
install rp on temper water to steamer, provide a water supply to the chemical feeder at the mop sink. temp occ ok
Final7/16/20037/17/20037/17/2003ANR
DetailsBill VanDegrift
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to meet the garden city 7/17/2003 9:55:00 AM cross connection control guy Tom Niel at 300pm 7/17/2003 9:55:24 AM
Final7/17/20037/17/20037/17/2003PPART
DetailsBill VanDegrift
3:00pm call tom first ###-#### 7/17/2003 3:53:15 PM temp occ ok, remove chem feed at mop sink, need device to keep sprayer out of the kettels, may need additional rp on the steamer, will meet with equipment supplier when he shows up. 7/17/2003 3:55:25 PM
Final7/8/20037/9/20037/9/2003AFAIL
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 7/8/2003 at 5:28:21 PM. Contact: ###-####. f.s.'s need dome strainer, ice bin drain in the bar needs its own drain, set all equipment, 7/9/2003 10:39:43 AM
Plumbing Rough-in5/23/20035/23/20035/23/2003APASS
DetailsRon Ginner
Scheduled by a contractor via Hello! on 5/23/2003 at 6:40:30 AM. Contact: ###-####. water in outside, wall needs to be f 5/23/2003 11:51:52 AM irred out 5/23/2003 11:52:06 AM
Groundwork4/29/20034/29/20034/29/2003PPASS
DetailsBill VanDegrift
gw ok
Plumbing Rough-in4/29/20034/29/20034/29/2003PNR
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 4/29/2003 at 8:01:04 AM. Contact: ###-####.
Plumbing Rough-in4/28/20034/28/20034/28/2003PPART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 4/28/2003 at 9:54:45 AM. Contact: ###-####. everything except the grease line by the kitchen ok,,, that line has a leak in the existing piping 4/28/2003 3:03:32 PM
Plumbing Rough-in4/22/20034/23/20034/23/2003APART
DetailsBill VanDegrift
Scheduled by a contractor via Hello! on 4/22/2003 at 5:00:32 PM. Contact: ###-####. ok to move durt and cover misc. piping prior to test. 4/23/2003 10:28:06 AM
Plumbing Rough-in4/22/20034/22/20034/22/2003PPART
DetailsJim Johnson
###-#### lenny CRABSHACK CRABSHACK CRABSHACK need to provide some bedding material to shade in ground-work instead of river rock need to finish installation of six or more floor sink,s or floor drains also need to test untested portion of ground-work in middle of building on west side of kitchen area 4/22/2003 4:21:54 PM