Final | 6/1/2005 | 6/1/2005 | 6/1/2005 | P | PASS |
Daryl Spivey
|
|
|
###-#### - joan
|
Final | 5/26/2005 | 5/27/2005 | 5/27/2005 | A | PART |
Daryl Spivey
|
|
|
walk thru with plumber for backflow protection on owner supplied equip
|
Final | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | PART |
Daryl Spivey
|
|
|
Still needs backflow protection on owner equip installs
|
Final | 5/26/2005 | 5/26/2005 | 5/26/2005 | P | PART |
Daryl Spivey
|
|
|
walk thru with Bill T from United Water. Still needs to have some equipment supplied with backflow protection. Plumber notified and will do walk thru tomorrow at 10 am
|
Final | 5/25/2005 | 5/26/2005 | 5/26/2005 | A | PASS |
Dixie Fellows
|
|
|
per your request
|
Final | 5/25/2005 | 5/25/2005 | 5/25/2005 | P | FAIL |
Dixie Fellows
|
|
|
per your request..need 3/4" HARD PIPE INTO POOL EQUIPMENT PER MANUFACTURER
|
Final | 5/25/2005 | 5/25/2005 | 5/25/2005 | A | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 7:28:19 AM. Contact: ###-####.
|
Final | 5/11/2005 | 5/11/2005 | 5/11/2005 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 5/11/2005 at 8:52:33 AM. Contact: ###-####. need installation of appliances and waher info.
|
Final | 5/10/2005 | 5/10/2005 | 5/10/2005 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 5/10/2005 at 8:46:03 AM. Contact: ###-####. Need baskets for floor sinks, installation paperwork for washers to see if rp is needed, coffee maker paperwork for rp installment, and pool area and equipment not
|
Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 4/22/2005 at 8:29:40 AM. Contact: ###-####. All rooms except ADA rooms are passed.
|
Water and/or Sewer | 3/15/2005 | 3/15/2005 | 3/15/2005 | A | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/15/2005 at 7:28:56 AM. Contact: ###-####. 4" water lines ran out to pump house and back to main building. 3/15/2005 11:54:36 AM
|
Plumbing Rough-in | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 7:46:18 AM. Contact: ###-####. inspected mechanical room and went thru project with contractor. 3/10/2005 3:28:15 PM
|
Groundwork | 2/18/2005 | 2/18/2005 | 2/18/2005 | P | PASS |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 2/18/2005 at 8:03:24 AM. Contact: ###-####.
|
Plumbing Rough-in | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 8:03:53 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 1/21/2005 at 8:40:15 AM. Contact: ###-####.
|
Plumbing Rough-in | 1/11/2005 | 1/12/2005 | 1/12/2005 | A | PART |
Ron Ginner
|
|
|
raul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Plumbing Rough-in | 12/30/2004 | 12/30/2004 | 12/30/2004 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 12/30/2004 at 8:39:56 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/28/2004 | 12/29/2004 | 12/29/2004 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 11:57:24 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/23/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 12/23/2004 at 8:19:13 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/22/2004 | 12/22/2004 | 12/22/2004 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 12/22/2004 at 8:56:31 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 12/21/2004 at 8:23:47 AM. Contact: ###-####.
|
Plumbing Rough-in | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PART |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 8:09:02 AM. Contact: ###-####. eight units 2 -3- floor south end R.I. only this date. 12/20/2004 3:11:17 PM
|
Groundwork | 11/30/2004 | 11/30/2004 | 11/30/2004 | P | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 7:52:06 AM. Contact: ###-####.
|
Plumbing Rough-in | 11/16/2004 | 11/16/2004 | 11/16/2004 | P | PART |
Ron Ginner
|
|
|
Shawn; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner reviewed suds relief 11/16/2004 2:06:01 PM
|
Water and/or Sewer | 10/13/2004 | 10/13/2004 | 10/13/2004 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 7:42:40 AM. Contact: ###-####. copper stub for water line from inside building to 5 foot outside ok 10/13/2004 3:19:22 PM 10/13/2004 3:20:08 PM
|
Groundwork | 9/15/2004 | 9/15/2004 | 9/15/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 9/15/2004 at 7:28:18 AM. Contact: ###-####.
|
Groundwork | 9/14/2004 | 9/14/2004 | 9/14/2004 | P | NR |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 9/14/2004 at 7:50:10 AM. Contact: ###-####. need several cleanouts on end of lines 9/14/2004 2:16:11 PM
|
Groundwork | 9/13/2004 | 9/13/2004 | 9/13/2004 | P | NR |
Gerry Varner
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 7:47:14 AM. Contact: ###-####.
|
Groundwork | 9/3/2004 | 9/3/2004 | 9/3/2004 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 9/3/2004 at 9:28:59 AM. Contact: ###-####. to grid line 12 okay 9/3/2004 2:03:21 PM
|
Groundwork | 9/1/2004 | 9/1/2004 | 9/1/2004 | P | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 9/1/2004 at 11:17:32 AM. Contact: ###-####. ground work from south to grid line 10 tested. 9/1/2004 3:42:29 PM
|
Groundwork | 8/27/2004 | 8/27/2004 | 8/27/2004 | A | PART |
Ron Ginner
|
|
|
main trunk line only with stubs up to grade.
|
Plumbing Rough-in | 8/26/2004 | 8/27/2004 | 8/27/2004 | A | CANC |
Ron Ginner
|
|
|
joe ###-#### this is a ground work 8/27/2004 10:04:19 AM
|