Final | 7/22/2005 | 7/22/2005 | 7/22/2005 | P | PASS |
Bill VanDegrift
|
|
|
final ok again
|
Plumbing Rough-in | 7/5/2005 | 7/5/2005 | 7/5/2005 | P | NR |
Bill VanDegrift
|
|
|
per your request , this permit got finaled in error. the cabinet that was installed at the time of the inspection was the wrong one, per Jim Story, it will require a final inspection when the perminant cabinet is installed.
|
Final | 6/29/2005 | 6/30/2005 | 6/30/2005 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/29/2005 at 6:07:23 PM. Contact: ###-####. final ok
|
Plumbing Rough-in | 6/8/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Bill VanDegrift
|
|
|
bob ###-#### job super says no core drilling slab for structural reasons, pump ok. ri ok
|