Final | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PASS |
Bill VanDegrift
|
|
|
aaron Phone #: ###-#### final ok
|
Groundwork | 4/28/2008 | 4/29/2008 | 4/29/2008 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 4/28/2008 at 9:58:35 PM. Contact: ###-####.-lift station pass
|
PLM-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/21/2008 | | PASS |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 1/18/2008 | 1/18/2008 | 1/18/2008 | P | PASS |
Eric Strole
|
|
|
Aaron ###-####
|
Plumbing Rough-in | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | NR |
Eric Strole
|
|
|
aaron Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Eric Strole
|
|
|
aaron Phone #: ###-####
|
Plumbing Rough-in | 12/3/2007 | 12/3/2007 | 12/3/2007 | P | PART |
Eric Strole
|
|
|
AARON Phone #: ###-####-need to finish nailplates, support dwv every 4', fix reverse grade on overhead vents & 1 1/2" overhead drain, move water lines from exteriour wall, raise avb's in both buildings to be 6" above fixture, fix fitting on vent thats in backwards, ok to pull test.(need access to avb's)
|