Final | 11/26/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Jim Johnson
|
|
|
no sign-off card on site
|
Other | 11/26/2008 | 11/26/2008 | 11/26/2008 | A | DONE |
Eric Strole
|
|
|
conferance
|
Final | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PART |
Eric Strole
|
|
|
Field contact is JT Waters Phone #: ###-#### Internet Inspection Request from: Julie Klocke-discharge from dishwasher needs to go indirect & provide drainage for rpba.
|
Final | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | PART |
Eric Strole
|
|
|
need to install dbca on diswasher & rpba on coffee machine & have all backflow devices tested & certified,
|
Final | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PART |
Eric Strole
|
|
|
Contact is JT Waters Phone #: ###-#### Internet Inspection Request from: Julie Klocke-dbca for premis needs tested & certified, will meet with bill thompson in pm to see if dishwasher & coffee maker need backflow devce's.
|
Plumbing Rough-in | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
Eric Strole
|
|
|
Contact is: Steve Wortman Phone #: ###-#### Internet Inspection Request from: Julie Klocke-rough-in pass. by final dbca for premis protection needs to be tested & certified & expantion tank needs to be installed on cold side.
|