Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberPLM11-00267
StatusFinaled
Name RM MECHANICAL
Site Address 601 N PHILLIPPI ST
Project Name 
Customer Number10-102
ePlanReviewNo
Description
Plumbing Permit - New: underground sewer waste vent, domestic water, above ground sewer waste and vent. roof drain,condensate drain rough-in plumbing piping and finished fixtures.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/18/201110/18/201110/18/2011PPASS
DetailsJim Johnson
Contact Cory Wessleman For Detailed Instructions.
Repack Room - Put Vacuum Breaker On Faucet Phone #: ###-#### >> Inspection requested via web by Allison Briggs note sign off card not on site
Water and/or Sewer10/13/201110/14/201110/14/2011PPART
DetailsJim Johnson
STEIN DIST. FINAL PLUMBING CONTACT CORY ###-####. Phone #: ###-#### >> Inspection requested via web by Allison Briggs need air gap on compartment sink,s in storeage area or provide backflow assemblies or backflow prevention methods on the two sink,s for final called contractor will recall when ready
Final10/10/201110/11/201110/11/2011ACANC
DetailsBill VanDegrift
final at stein per mike wilson of mcalvain email. ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs not ready
Final10/7/201110/10/201110/7/2011ACANC
DetailsJim Johnson
Contact Cory Wessleman For Details
###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs Inspection cancelled from web by: Allison Briggs
Final9/7/20119/8/20119/8/2011APART
DetailsJim Johnson
final plumbing at steins call dave to schedule ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs main office area final ok need to finish trim in warehouse area contractor to call when ready
Plumbing Rough-in8/31/20118/31/20118/31/2011PPART
DetailsJim Johnson
CONTACT DAVE PORTER - ###-####
ALSO NEED ROOF DRAIN INSPECTION
AND A PORTION THAT IS FINAL Phone #: ###-#### >> Inspection requested via web by Allison Briggs roof drains and vent,s test ok made walk through on final portion with Dave need to complete trim
Plumbing Rough-in8/25/20118/26/20118/26/2011APART
DetailsJim Johnson
Plumbing rough in - call dave ###-####. Phone #: ###-#### >> Inspection requested via web by Allison Briggs warehouse repack area rough-in test ok
Plumbing Rough-in8/25/20118/26/20118/25/2011ACANC
DetailsJim Johnson
rough in at Stein call Dave ###-####. Phone #: ###-#### >> Inspection requested via web by Allison Briggs Inspection cancelled from web by: Allison Briggs
Groundwork7/12/20117/13/20117/13/2011APASS
DetailsJim Johnson
stein dist. groundwork call Cory to schedule ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs
Groundwork7/6/20117/7/20117/7/2011APART
DetailsJim Johnson
underground inspection at stein, call cory to schedule ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs ground work for trench drains test ok ok to cover
Water and/or Sewer6/30/20116/30/20116/30/2011PPART
DetailsJim Johnson
Contact Cory Wessleman ###-####. Inspection for The Remainder Of The Underground Waste. Phone #: ###-#### >> Inspection requested via web by Allison Briggs dwv drain piping from building to interceptor on south-east side of building test ok ok to cover
Plumbing Rough-in6/17/20116/20/20116/20/2011APART
DetailsJim Johnson
underground waste rough call cory ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs ground-work in middle section of building south side test ok ok to cover
Plumbing Rough-in6/7/20116/8/20116/8/2011PPART
DetailsJim Johnson
plumbing rough in at Stein - schedule with Cory on site ###-#### Phone #: ###-#### >> Inspection requested via web by Allison Briggs rough-in on office area test ok
PLM-Aging Inspection4/26/20114/26/20114/27/2011 PASS
DetailsJim Johnson
Groundwork2/24/20112/24/20112/24/2011PPART
DetailsJim Johnson
Contact Brian Means For Specific Questions. Underground Waste & Vent Phone #: ###-#### >> Inspection requested via web by Allison Briggs ground work on east side of building test ok