Final | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | PASS |
Jim Johnson
|
|
|
|
Final | 4/6/2015 | 4/6/2015 | 4/6/2015 | A | PART |
Jim Johnson
|
|
|
General contractor and store manager should be there. If they are not please contact me at above number. Thanks. Phone #: ###-#### >> Inspection requested via web by Josh Johnson need to have sprinkler backflow and tie-in permitted prior to building plumbing final oked temp
|
Final | 4/2/2015 | 4/3/2015 | 4/3/2015 | A | PART |
Jim Johnson
|
|
|
General Contractor or store manager should be on site all day. Please call me with any issues. Thanks. Phone #: ###-#### >> Inspection requested via web by Josh Johnson need 120 degree hot water limitation to public laves called contractor will recall when ready
|
Plumbing Rough-in | 2/19/2015 | 2/19/2015 | 2/19/2015 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by Josh Johnson
|