Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberPLM15-00697
StatusFinaled
Name MAGIC PLUMBING
Site Address 11960 W NETHERLAND DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Plumbing Permit - New: Plumbing rough and trim
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled9/2/20159/2/20159/2/2015PPASS
DetailsJim Little
PLM-Aging Inspection9/2/20159/2/20159/2/2015 PASS
DetailsJim Little
finaled by BV but never doc finaled.
Water and/or Sewer6/3/20156/4/20156/4/2015APASS
DetailsBill VanDegrift
Phone #: ###-#### Inspection requested via web by Erin Whiting
Plumbing Rough-in4/20/20154/21/20154/21/2015ACANC
DetailsJim Johnson
Phone #: ###-#### >> Inspection requested via web by Erin Whiting
Plumbing Rough-in4/13/20154/14/20154/13/2015PCANC
DetailsJim Johnson
Phone #: ###-#### >> Inspection requested via web by Erin Whiting Inspection cancelled from web by: Erin Whiting
Plumbing Rough-in4/10/20154/13/20154/13/2015PPASS
DetailsJim Johnson
Phone #: ###-#### >> Inspection requested via web by Erin Whiting
Plumbing Rough-in4/10/20154/10/20154/10/2015PFAIL
DetailsJim Johnson
Phone #: ###-#### >> Inspection requested via web by Erin Whiting need to replace fernco coupling with an approved shielded band as noted in correction notice issued on 4/7/2015 at building drain and sewer connection in crawl other correction have been made test on DWV test ok correction notice on site contractor to recall when ready
Plumbing Rough-in4/7/20154/8/20154/8/2015PFAIL
DetailsJim Johnson
Phone #: ###-#### >> Inspection requested via web by Erin Whiting need to make correction,s noted on correction notice posted on site
Plumbing Rough-in4/6/20154/7/20154/7/2015PFAIL
DetailsJim Johnson
Phone #: ###-#### >> Inspection requested via web by Erin Whiting 1. test failed on DWV 2. need to repipe water closet on horizontal wet vent entering horizontal branch drain in vertical. each individual fixture drain or trap arm SHALL connect horizontally to the wet-vented horizontal branch drain. as per908.2 2009 upc. 3. need to repipe abs to pvc with approved glue or an approved shielded band not abs glue at building drain to building sewer connection in crawl correction notice on site contractor to recall rough-in when ready