Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberPLM15-01723
StatusFinaled
Name PARK CENTER PLUMBING
Site Address 7996 W OVERLAND RD
Project NameDiscount Tire
Customer Number 
ePlanReviewNo
Description
New: Tol, lavs, urinal, df, trensh drain water heater
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/18/201511/18/201511/18/2015APASS
DetailsJim Little
lowered service sink as per GC Phone #: ###-#### Inspection requested via web by Raul Castanon
>final ok, could not find sign off card
Final11/6/201511/6/201511/6/2015AFAIL
DetailsJim Little
3/4 rp in compressor room for all 3 hose bibs Phone #: ###-#### Inspection requested via web by Raul Castanon
>rp ok
>service sink is s-trapped and bushed down from a 2" trap to a 1.5" trap arm and abs is glued to pvc. repipe sink correctly
Final10/30/201510/30/201510/30/2015PPART
DetailsBill VanDegrift
set all equipment and call for a final inspection
Other10/29/201510/30/201510/30/2015ADONE
DetailsJim Little
meet Stacy from united water on hose bibbs 9:00.
>Stacey is requiring rpba on hose bibbs in shop, vertical rpba's ok if approved.
Final10/22/201510/22/201510/22/2015AFAIL
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Raul Castanon
>All hosebibbs in the shop area must be protected by a RP backflow assembly per the water purveyor. (united water)
>leak at solder joint on s. hb.
Final10/12/201510/12/201510/13/2015PPASS
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Raul Castanon
>Need RPBA on shop hose bibbsshop
>cut out vinyl roof to full size of pipe north end roof drain and overflow, install baskets.
Roof Drains9/22/20159/22/20159/22/2015AFAIL
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Raul Castanon
>add c/o per 1101.12.2
>support pvc every 4' per tbl 3-2 all sizes
Water and/or Sewer9/15/20159/15/20159/15/2015APART
DetailsJim Little
Talk to Bill Vandergriff regarding sample ports. they are not needed Phone #: ###-#### Inspection requested via web by Raul Castanon
>incp venting ok
>incp inlet and outlet ok
>incp 24 test ok
Water and/or Sewer9/11/20159/11/20159/11/2015PFAIL
DetailsJim Little
Sand and grease vault, drain and vent Phone #: ###-#### Inspection requested via web by Raul Castanon
>not under test
>tank needs to be vented seperate, not on the pipe inlet.
>outlet need two way C/O and sampling port, wye combo does not work for sampling port.
Plumbing Rough-in8/26/20158/26/20158/26/2015PPART
DetailsJim Little
tee''s are in for hammer aresters, will install at trim.
Framer will frame a 12x12 accsses Phone #: ###-#### Inspection requested via web by Raul Castanon
>bathroom area ri ok
Plumbing Rough-in8/21/20158/21/20158/21/2015PFAIL
DetailsJim Little
public restrooms only Phone #: ###-#### Inspection requested via web by Raul Castanon
1>dwv test fail-leaks
2>backgraded vents
3>venting not per approved plans, change vent size at tee not bushing in a 90.
4>strap 3" drain at strut
5>add hammer arrestor for urnals.
Plumbing Rough-in8/20/20158/21/20158/21/2015AFAIL
DetailsJim Little
Public restrooms only Phone #: ###-#### Inspection requested via web by Raul Castanon
>leaks in DWV system
Groundwork6/1/20156/1/20156/1/2015PPART
DetailsBill VanDegrift
gw ok with vent at tire changing tank floor drain. vents for interceptor are not installed yet will call when ready.
Groundwork6/1/20156/1/20156/1/2015PFAIL
DetailsJim Little
Phone #: ###-#### Inspection requested via web by Raul Castanon. No approved plans available, tire changer FD needs a vent.
Water and/or Sewer5/28/20155/28/20155/28/2015APART
DetailsBill VanDegrift
Phone #: ###-#### Inspection requested via web by Raul Castanon partial gw ok restroom area