Final | 5/19/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Jim Little
|
|
|
Juan Phone #: ###-####
|
Final | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | NR |
Jim Little
|
|
|
Juan Phone #: ###-####
|
Final | 5/17/2016 | 5/17/2016 | 5/17/2016 | P | FAIL |
Jim Little
|
|
|
Juan Phone #: ###-#### >Install ASSE 1070 tempering device on lavs in bathrooms. >T&P on water heater needs a 1" airgap >open floor @ ejector pump to be able to see tank lid for inspection.
|
Plumbing Rough-in | 3/18/2016 | 3/18/2016 | 3/18/2016 | P | PASS |
Jim Little
|
|
|
Juan Phone #: ###-####
|
Plumbing Rough-in | 3/17/2016 | 3/17/2016 | 3/17/2016 | P | PART |
Jim Little
|
|
|
Juan Phone #: ###-#### >need to test ejector line >need to add nailplates
|
Groundwork | 3/1/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Jim Little
|
|
|
>G/I test ok
|
Groundwork | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | PASS |
Jim Little
|
|
|
Juan Phone #: ###-#### >gw inside ok >start 24hr test on G/I
|
Groundwork | 2/26/2016 | 2/26/2016 | 2/26/2016 | P | FAIL |
Jim Little
|
|
|
Juan Phone #: ###-#### >section backgraded after new 4x3 wye installed >neeed approved band @ 4" abs to cast iron
|
Groundwork | 2/25/2016 | 2/25/2016 | 2/25/2016 | P | FAIL |
Jim Little
|
|
|
Juan Phone #: ###-#### >ejector pumps needs to tie into 4" >fix backgraded section >need 4" c/o on G/I >move 3" vent to outlet of G/I >need C/O on outlet of G/I >restest
|