Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberPLM16-00536
StatusFinaled
Name BUSS MECHANICAL SERVICES INC
Site Address 500 S CAPITOL BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
New: PLUMBING UNDERGROUND WORK ONLY
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PLM-Aging Inspection11/21/201611/21/201611/21/2016 PASS
DetailsDaryl Spivey
Final11/21/201611/21/201611/21/2016APASS
DetailsDaryl Spivey
Ground work complete..........some above ground inspections done on this permit but should have been called in on permit PLM16-02771.........ds
Plumbing Rough-in8/22/20168/23/20168/23/2016PPART
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
2nd floor Myrtle wing water tested ok..........ds
Plumbing Rough-in7/14/20167/15/20167/15/2016APART
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
partial 2nd floor Myrtle wing waste and vent only..........ds
Plumbing Rough-in7/7/20167/7/20167/7/2016PPART
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
1st fl. west end restroom roughed in and piping up and thru 2nd floor tested ok to floor level..............ds
Other6/1/20166/2/20166/2/2016PDONE
DetailsChad Schwendiman
3:30 ish call Keith first ###-#### talk about gas piping options - I meet with ESI, the architect, and engineer to discuss the routing of the gas piping for decritive appliances on the front patio. They are going to penetrate the exterior of the building above grade on the capital street side of the building and then run underground to the location of the appliances.
Other6/1/20166/1/20166/1/2016PCANC
DetailsBill VanDegrift
Groundwork5/31/20166/1/20166/1/2016PPART
DetailsDaryl Spivey
IN THE EARLY AFTERNOON PLEASE. KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
G/I piping and interceptor filled and tested ok.........ds
Plumbing Rough-in5/24/20165/25/20165/25/2016PPART
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.....tested ok......ds
Drains and sanitary on east side under floor
Storm Drains5/23/20165/24/20165/24/2016APART
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
roof drains west side........marked on plan..........ds
Groundwork5/17/20165/18/20165/18/2016APASS
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
Final4/28/20164/29/20164/29/2016ACANC
DetailsBill VanDegrift
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER wrong job
Groundwork4/22/20164/25/20164/25/2016APART
DetailsDaryl Spivey
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
water service lines to meter tested ok.........ds
Water and/or Sewer3/11/20163/14/20163/14/2016ANR
DetailsJim Little
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
>no inspection needed per Keith
Groundwork2/22/20162/23/20162/23/2016PPART
DetailsBill VanDegrift
KIETH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER east side interceptor and venting, upstream piping to interceptor and sewer and water services to 15 fett out side of the riser room, no waste piping inside of the riser room yet.