PLM-Aging Inspection | 11/15/2016 | 11/15/2016 | 11/17/2016 | | PASS |
Dan Ediger
|
|
|
RP Certified
|
Sprinkler (Final) | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Dan Ediger
|
|
|
RP certified
|
Sprinkler (Final) | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | FAIL |
Jim Little
|
|
|
re -inspect >Otiker clamps not approved on water service, use two hose clamps. >re-inspection fee added, the next inspection will be the fourth trip. pat fee before next inspection.
|
Sprinkler (Final) | 6/9/2016 | 6/10/2016 | 6/10/2016 | A | FAIL |
Jim Little
|
|
|
Charles Phone #: ###-#### >corrections not made >barbed ftg not inserted into water service completly >RP not certified >grade line from rp to meter tie in.
|
Sprinkler (Final) | 5/24/2016 | 5/25/2016 | 5/25/2016 | A | FAIL |
Jim Little
|
|
|
Chuck Phone #: ###-#### >uncover complete tee at tie in >insert fitting is not pushed in all the way and leaking at tie in >line from backflow to drain must be graded to drain down >certify RPBA >each barbed ftg needs two clamps
|