Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberPLM16-03169
StatusFinaled
Name COOPER PLUMBING
Site Address 1505 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Pizza Hut TI. Kitchen equipment by others.
Outside piping by others,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/21/201610/21/201610/21/2016APASS
DetailsEric Strole
Final10/20/201610/20/201610/20/2016APART
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Todd Walter -Will pass final upon inspection on interceptor. Temp final ok.
Final10/14/201610/14/201610/14/2016PPART
DetailsEric Strole
Plumbing and gas piping. Phone #: ###-#### Inspection requested via web by Todd Walter-expose tempering valve for wash basin. Install rpba on dishwasher and install tether on all gas fired equip on wheels and install all equiptment.
Plumbing Rough-in10/2/201610/3/201610/3/2016ACANC
DetailsDaryl Spivey
gas piping inspection. Phone #: ###-#### Inspection requested via web by Todd Walter
Other10/3/201610/3/201610/3/2016APART
DetailsDaryl Spivey
gas piping inspection. Phone #: ###-#### Inspection requested via web by Todd Walter
partial on main gas line to roof top, water heaters and cook line...needs additional hanger on main over cooler..........ds
Plumbing Rough-in9/12/20169/13/20169/13/2016PPASS
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Todd Walter
Groundwork9/1/20169/1/20169/1/2016PPASS
DetailsEric Strole
Could I get a late PM inspection Today as much as possible. Thanks Phone #: ###-#### Inspection requested via web by Todd Walter