Final | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Dan Ediger
|
|
|
Sewer dump to be finaled, is on the south side of building ( in the back ) outside. The RP devise for hose bib, is on the inside of building, just behind the hose bib. Phone #: ###-#### Inspection requested via web by Rob Bristol
|
Groundwork | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol gw ok trap will be protected from freezing by the anti freeze in the bus waste tank in the winter.
|