Final | 5/22/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Final | 5/15/2017 | 5/16/2017 | 5/16/2017 | A | CANC |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen
|
Final | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | FAIL |
Dan Ediger
|
|
|
Inspection requested via web by Brian Johansen. Provide an air gap at all T&p drains and grade to wh pan drains.
|
Plumbing Rough-in | 2/20/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Eric Strole
|
|
|
|
Groundwork | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|