Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberPLM17-02090
StatusFinaled
Name BAKERS PLUMBING SOLUTIONS LLC
Site Address 4883 W MALAD ST Unit: A
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Demo existing sinks and cap waste, vent and water lines. Provide rough-in and trim for fixtures listed on the set of plans next to the front door of the tenant space that is being improved.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/31/20178/1/20178/1/2017PPASS
DetailsEric Strole
Phone #: ###-#### Inspection requested via web by Travis Baker
Final7/31/20177/31/20177/31/2017PPART
DetailsDan Ediger
Phone #: ###-#### Inspection requested via web by Travis Baker.
Add a thermostatic valve to the existing bath so both lavatory sinks are protected
Final7/14/20177/14/20177/14/2017PPART
DetailsDan Ediger
Mop sink plumbing ok to cover. Temp occ approved for plumbing
Final7/13/20177/14/20177/14/2017ANR
DetailsDan Ediger
Requesting a temporary occupancy for the plumbing Phone #: ###-#### Inspection requested via web by Travis Baker
Final7/12/20177/13/20177/13/2017AFAIL
DetailsDan Ediger
Tenant is requesting to get a temp cert of occupancy until the counter tops come in. I have a break room sink that needs to be set. Phone #: ###-#### Inspection requested via web by.
Travis Baker.
1. Add a double check valve to the water service.
2. Install an expansion tank at the water heater.
3. Pipe the t&p with approved material.
4. Install a tempering valve to the restroom sinks or one at the water heater.
Plumbing Rough-in6/8/20176/9/20176/9/2017APASS
DetailsBill VanDegrift
If door is locked Please call Travis at ###-#### for the code to the lock box on the front door. Phone #: ###-#### Inspection requested via web by Travis Baker ri ok