Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberPLM17-02907
StatusFinaled
Name TROJAN PLUMBING
Site Address 3605 N COVERED WAGON WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration or Repair: Disconnect building drain from septic sewer pipe and connect to new city sewer stub in.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/7/20178/7/20178/7/2017APASS
DetailsDan Ediger
Other8/5/20178/7/20178/7/2017APASS
DetailsDan Ediger
Install transition coupling on sewer connection. Picture sent on Saturday. Thanks! Phone #: ###-#### Inspection requested via web by Troy Woolston
Other8/3/20178/4/20178/4/2017PFAIL
DetailsDan Ediger
Homeowner will be home. Knock on the door. The crawl access is in the closet to the left of the front door. We capped off the septic sewer pipe and ran the building drain over to the stubben on .the south side of the crawl space. Inspection requested via web by Troy Woolston.
The abs to pvc transition must be done with an approved transition band.
ABS or transition glue are not approved