Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberPLM17-03043
StatusFinaled
Name PEAK PLUMBING & SEPTIC
Site Address 1763 N FIVE MILE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Replacing Urinal, faucets, water heater, urinal floor drain, installing new toilet.

Only fixture supplied by Peak is the Urinal
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/1/201711/1/201711/1/2017PPASS
DetailsDan Ediger
Final11/1/201711/1/201711/1/2017PFAIL
DetailsDan Ediger
Phone #: ###-#### Inspection requested via web by Jason Adams.
Pipe the RP air gap drain 1", full size to the outdoors. It is reduced to 1/2"
Final10/30/201710/31/201710/31/2017PFAIL
DetailsDan Ediger
Will not be available till afternoon Phone #: ###-#### Inspection requested via web by Jason Adams.
The access needs to be large enough to remove the backflow assembly without cutting the sheetrock.
Add a shut-off valve and union upstream of the backflow.
Final10/26/201710/27/201710/27/2017PFAIL
DetailsDan Ediger
Phone #: ###-#### Inspection requested via web by Jason Adams.
1. Install a tempering valve on the water heater or all public sinks.
2. The t&p on the water heater is backgrading.
3. The backflow needs to be cerified.
4. The access to the backflow must be big enough to get to the unions for removal and service.
Plumbing Rough-in8/28/20178/29/20178/29/2017APASS
DetailsDan Ediger
Brett Phone #: ###-####
Plumbing Rough-in8/25/20178/28/20178/28/2017PFAIL
DetailsDan Ediger
Fred Phone #: ###-####.
Run a 3/4" water line direct off a 1" line.
Other8/21/20178/22/20178/22/2017APASS
DetailsDan Ediger
Please call ahead to meet, questions on how to test line - Conference - Fred Phone #: ###-####.
Remove enough concrete to get a full size end of line cleanout installed and roll vent off the center line of the drain