Final | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Dan Ediger
|
|
|
#51238 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 4/12/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
Dan Ediger
|
|
|
JOB # 51238 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 4/11/2018 | 4/12/2018 | 4/12/2018 | P | FAIL |
Dan Ediger
|
|
|
JOB # 51347 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. 1. The waste and overflow is leaking on the tub/shower combo. 2 The 3" cleanout in the crawl must have 24" clearance. Install a wye and cleanout adapter or take above the floor.
|