Permit Information
Permit NumberPLM18-03982
StatusFinaled
Name WARNER CONSTRUCTION
Site Address 1330 E EXCHANGE ST
Project Name 
Customer Number421
ePlanReviewNo
Description
New: Installation of sewer pump station, grease/oil interceptor, sewer discharge line and potable water supply line.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/8/20194/8/20194/8/2019PPASS
DetailsEric Strole
Water and/or Sewer11/7/201811/8/201811/8/2018APASS
DetailsEric Strole
Wiley-sewer only Phone #: ###-####-Test on pressure sewer pass.
Water and/or Sewer9/28/20189/28/20189/28/2018PPART
DetailsEric Strole
Waterline-Ok to cover, still need connection at building and meter and needs tested.
Water and/or Sewer9/27/20189/28/20189/28/2018APART
DetailsEric Strole
Waterline-Middle connection ok to cover.
Water and/or Sewer9/27/20189/27/20189/27/2018PPART
DetailsEric Strole
Waterline-OK to cover except connections.
Water and/or Sewer9/26/20189/27/20189/27/2018APART
DetailsEric Strole
installation of pressure sewer discharge pipe. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Ok to cover pressure sewer. Still need lift station and tie-in at sewer.
Water and/or Sewer9/21/20189/24/20189/24/2018APASS
DetailsEric Strole
Inspection of Sand and Oil separator installation and water test. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Test on interceptor pass.
Water and/or Sewer9/20/20189/21/20189/21/2018PPART
DetailsEric Strole
Inspection of Sand and Oil separator installation and water test. Riley Caldwell primary contact on site. Phone #: ###-#### Inspection requested via web by Craig Fischer-Start of 24 hr test on interceptor