Final | 4/20/2020 | 4/21/2020 | 4/21/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: 8019150400 >> Inspection requested via mobile web by Brad Hughes
|
Pressure Test | 2/6/2020 | 2/6/2020 | 2/6/2020 | P | PASS |
Eric Strole
|
|
|
Brad Phone #: ###-####-20 lb gas test pass.
|
Plumbing Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Eric Strole
|
|
|
Brad Phone #: 801-915-040-Plumbing rough-in pass.
|
Groundwork | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Eric Strole
|
|
|
Brad Phone #: ###-####
|
Groundwork | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | NR |
Eric Strole
|
|
|
Brad- partial underground inspection Phone #: ###-####
|
Plumbing Rough-in | 10/29/2019 | 10/30/2019 | 10/30/2019 | P | CANC |
Eric Strole
|
|
|
Brad- partial underground inspection Phone #: ###-####
|
Groundwork | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PART |
Eric Strole
|
|
|
Trunkline ok to cover. Test pass.
|