Final | 7/1/2020 | 7/1/2020 | 7/1/2020 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-Builbing B final ok.
|
Final | 6/24/2020 | 7/1/2020 | 7/1/2020 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-Need to test backflows.
|
Final | 6/24/2020 | 6/25/2020 | 6/24/2020 | A | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Jason Brashears Inspection cancelled from web by: Jason Brashears
|
Pressure Test | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Eric Strole
|
|
|
Gas piping pressure test for rooftop piping Phone #: ###-#### Inspection requested via web by Jason Brashears-20 lb gas test pass.
|
Pressure Test | 5/30/2020 | 6/1/2020 | 6/1/2020 | A | FAIL |
Eric Strole
|
|
|
Gas piping pressure test for roof top piping. Phone #: ###-#### Inspection requested via web by Jason Brashears-20 lb gas test fail.
|
Pressure Test | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-20 lb gas test from meter to w/h & stub up to roof pass.
|
Plumbing Rough-in | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears-Roof drains & rough-in pass.
|
Groundwork | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears
|