Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD17-00230
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 12060 W EXECUTIVE DR
Project NameErnest Packaging Solutions T.I
Customer Number 
ePlanReviewYes
Description
(EMEST PACKAGING SOLUTIONS) Permit for tenant improvements to an existing 25,120 sq. ft. tenant space with work to include the construction of new interior nonbearing partition walls to create new offices and accessible restrooms along with new RtUs and ducting for the mechanical systems. This is a fully fire sprinklered building. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/29/20177/28/2017 DONE
This permit finaled on the web by Brian McCoy
BLD-Final7/18/20177/19/20177/19/2017APASS
DetailsMike Jordan
Please call Kelly 20 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Brian McCoy. Ok for perm occ.
Permanent Occupancy  7/19/2017 DONE
FIRE-Final Inspection7/17/20177/17/20177/17/2017PPASS
DetailsJim Page
Fire sprinkler inspection is complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags, final racking permit inspection for life safety complete. Final life fire safety inspection passed/complete.
BLD-Final6/6/20176/7/20176/7/2017APART
DetailsMike Jordan
construction phase. please call 1/2 hour prior. Phone #: ###-#### Inspection requested via web by Todd Landvatter. Phase 1 ok to occupy (new office). Old office to be demolished and will also be an associated racking permit.
FIRE-Final Inspection6/6/20176/7/20176/7/2017APART
DetailsTroy Cobbley
Phase 1 construction life safety passed. Waiting for remaining construction and racking permit for final.
FIRE-Final Inspection6/5/20176/6/20176/5/2017ACANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Todd Landvatter Inspection cancelled from web by: Todd Landvatter
BLD-Final6/5/20176/6/20176/5/2017ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Todd Landvatter Inspection cancelled from web by: Todd Landvatter
BLD-Ceiling Grid Inspection5/10/20175/10/20175/10/2017APASS
DetailsJim Storey
BLD-Ceiling Grid Inspection5/9/20175/10/20175/10/2017ANH
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Todd Landvatter no access
BLD-Framing/Rough-in3/31/20174/3/20174/3/2017APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Todd Landvatter. Interior steel stud framed walls and hardlis ok.
BLD-Conference3/16/20173/16/20173/16/2017PDONE
DetailsMike Jordan
call when enroute please Phone #: ###-#### Inspection requested via web by Todd Landvatter. Contractor would like to one side demissing wall to seperate construction from existing work space. Noted to contractor would be ok if electrical and plumbing inspectors approved.
Plan assigned to (CDM)2/14/20172/14/20173/15/2017 PASS
DetailsCarl D Madsen
1st comp. Emest Packaging
Routing - PLAN CHECK3/15/2017 3/15/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  3/15/2017 DONE
Permit Ready to Issue  3/15/2017 DONE
Needs; GC Form & Revised Cert of Value
Issue PAID IN FULL permit  3/15/2017 DONE
Print Occupancy Form  3/15/2017 DONE
Route to Impact Fee Review3/6/20173/9/20173/6/2017 PASS
DetailsTonya Wallace
Review requested for Commercial Permit
Routing - PLAN CHECK2/14/2017 3/6/2017 FAIL
DetailsCarl D Madsen
1st review completed  3/6/2017 FAIL
Routing PW Environmental2/14/2017 2/21/2017 PASS
DetailsRick Christenson
Routing - FIRE2/14/20172/14/20172/17/2017 PASS
DetailsScott Arellano
Comments attached to case.
Routing - PLANNING Land Div2/14/2017 2/17/2017 PASS
DetailsTodd Tucker
Routing - MECHANICAL2/14/2017 2/17/2017 PASS
DetailsTroy James
Routing - PLUMBING2/14/2017 2/15/2017 PASS
DetailsBill VanDegrift
1) ASSE 1070 mixing valve at lavs
2) trap primer at floor drains
Routing - PLANNING2/14/2017 2/14/2017 PASS
DetailsCody Riddle
Routing - Design Review2/14/2017 2/14/2017 PASS
DetailsAndrea Tuning
Routing - Addressing2/14/2017 2/14/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS2/14/2017 2/14/2017 PASS
DetailsRachael Beierle
Intake Approval  2/14/2017 PASS
Application received  2/9/2017 DONE
Application submitted via PDS Online on Feb 9 2017 10:39AM
Intake Approval  2/9/2017 FAIL
DetailsCarl D Madsen
1.It appears there may be new rooftop units being added to the roof. An the checklist indicates engineering is provided, however there is no engineering packet provided. Please provide the engineering calculations and structural roof details if any truss modifications are required.
2. Several of the plan sheets have been uploaded in the wrong orientation. Please upload the sheets in horizontal orientation.