BLD-Final | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Mike Jordan
|
|
|
Garage code 0813. Momentum sticker is on electrical panel Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Blower Door Test Results | 5/8/2018 | 5/8/2018 | 5/8/2018 | A | DONE |
Mike Jordan
|
|
|
Garage code 0813. Momentum sticker is on electrical panel Phone #: ###-#### Inspection requested via web by Scott Zierler. 4.6
|
DOC - Permit Finaled | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Mike Jordan
|
|
|
Thanks. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 1/5/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Mike Jordan
|
|
|
Thanks. Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 12/28/2017 | 12/29/2017 | 1/2/2018 | P | NR |
Jim Sly
|
|
|
Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler Recall for Conference....inspection.
|
BLD-Framing/Rough-in | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | PART |
Mike Jordan
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by Scott Zierler. Ok to insulate. All framing issues not resolved. Contractor to schedule conferance.
|
BLD-Framing/Rough-in | 12/22/2017 | 12/27/2017 | 12/27/2017 | A | NR |
Mike Jordan
|
|
|
Reinspection. I will be out of town, but can receive text messages. Thank you. Scott. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 12/24/2017 | 12/26/2017 | 12/26/2017 | A | CANC |
Brandon Shaw
|
|
|
Thanks Mike. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | FAIL |
Mike Jordan
|
|
|
Plans and truss engineering above the fireplace. Thanks. Phone #: ###-#### Inspection requested via web by Scott Zierler. Provide strng back on A6 gable end truss. Insufficient bearing on A5 trusses at east interior bearing wall. Remove all roof penetrations from laydown parapet. Nail off all hangers. Bottom chords on 2ply B3 truss not in contact. 2 hr. wall not continous and not to bottom of roof deck. Correction notice posted.
|
BLD-Other | 12/5/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Brandon Shaw
|
|
|
Soffits
|
BLD-Wall Bracing | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Mike Jordan
|
|
|
scott Phone #: ###-####
|
BLD-Wall cover | 11/1/2017 | 11/2/2017 | 11/2/2017 | P | CANC |
Mike Jordan
|
|
|
Common wall - Scott Phone #: ###-####. INspection completed yesterday.
|
Routing PW Flood Plain | 9/27/2017 | | 9/27/2017 | | PASS |
Jason C. Taylor
|
|
|
Two Elevation Certificates will be required; one prior to receiving a framing inspection, and one based upon finished construction. These certificates will need to be reviewed and approved by Public Works staff prior to occupancy approval. Jason Taylor ###-####
|
Elevation Cert Rec'd-Midconst | | | 9/27/2017 | | DONE |
|
|
|
|
BLD-Foundation | 8/28/2017 | 8/29/2017 | 8/29/2017 | P | PASS |
Brandon Shaw
|
|
|
Ricardo Phone #: ###-####
|
BLD-Footing | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Ron Phone #: ###-####
|
Override - Condition Holds | 8/28/2017 | 1/1/1900 | 8/28/2017 | | |
|
|
|
not framing
|
Override - Condition Holds | | | 4/25/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/25/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/13/2017 | | |
|
|
|
|
Telephone call | | | 4/13/2017 | | DONE |
|
|
|
notified customer that permit is ready
|
Case Summary (BLD) | | | 4/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/13/2017 | | 4/13/2017 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/13/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/13/2017 | | DONE |
Christina Prado
|
|
|
|
Override - Condition Holds | | | 4/13/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 4/13/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (LEG) Tisha | 3/9/2017 | | 4/13/2017 | | DONE |
Tisha Gallop
|
|
|
1st review 3/29; plan check
|
Plan resubmittals received | | | 4/11/2017 | | DONE |
|
|
|
Two copies of Rescheck, Lateral Design packet and sheets A-2, A-3 and A-3a. Taken to Tisha
|
Routing - PLAN CHECK | 3/14/2017 | | 3/29/2017 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 3/29/2017 | | FAIL |
|
|
|
|
Routing PW Flood Plain | 3/10/2017 | | 3/15/2017 | | PASS |
Jim Wyllie
|
|
|
|
Elevation Cert Rec'd-Prelim | | | 3/15/2017 | | |
|
|
|
|
Routing - MECHANICAL | | | 3/14/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 3/9/2017 | 3/12/2017 | 3/13/2017 | | PASS |
Tonya Wallace
|
|
|
Initial residential review of all new news permit requested for now.
|
Routing - PLANNING | 3/10/2017 | | 3/10/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 3/9/2017 | | 3/9/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/9/2017 | | 3/9/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 3/9/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/9/2017 | | DONE |
|
|
|
|
Application received | | 3/9/2017 | | | |
|
|
|
|