Permit Information
Permit NumberBLD17-01452
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7607 W GRATZ DR
Project NameLyle Pearson - Service Canopy
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON – FREESTANDING SERVICE CANOPY ADDITION) (DRH16-00388) (10-24-17 DRAWINGS REVISED TO ADD MORE PARKING LOT POLE LIGHTING). The existing building and the new canopy will not have a fire sprinkler system. To construct a freestanding 2,516 square foot canopy (2,167 square feet with 349 square feet of eaves) that has a total height of about 18 feet (ceiling height of about 16 feet). Site demolition work includes removing curbs, gutters, sidewalks, asphalt, light poles, etc. at the vacated portion of the former Auto Drive public way. Work is to include reinforced concrete footings, steel columns with steel base plates, a concrete slab on grade, steel girders, steel beams, steel roof deck, steel stud perimeter roof parapets, TPO single ply roof membrane installed on top of tapered foam plastic insulation, gutter, downspouts, and overflow drains. Special Inspection is required for concrete and welding. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/20/20197/10/2019 DONE
mailed 7-11
Permanent Occupancy  6/10/2019 DONE
BLD-Final4/30/20195/1/20195/1/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton. ok for perm occ.
BLD-Final4/22/20194/23/20194/23/2019APEND
DetailsMike Jordan
Please give me a call when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton. Pending final letter from special inspection agency.
Zoning Approval4/19/20194/19/20194/19/2019 PASS
DetailsJosh Wilson
FIRE-Final Inspection9/25/20189/25/20189/25/2018PPASS
DetailsTroy Cobbley
Life safety passed. Bob is going to install a fire exitinguisher which I will verify on next inspection.

Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Foundation10/31/201710/31/201710/31/2017PPASS
DetailsMike Jordan
Footing Piers. Permit Plans will be in showroom. Phone #: ###-#### Inspection requested via web by Leonard Butler
BLD-Footing10/25/201710/26/201710/26/2017APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Leonard Butler. Column pad footings for new canopy. No approved plans on site. Will have special inspection. Contractor to have all required documents on site for next inspection.
OVERRIDE  10/25/2017  
Issue PAID IN FULL permit  10/25/2017 DONE
Print Occupancy Form  10/25/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/25/2017 DONE
Permit Ready to Issue  10/25/2017 DONE
All Met
Routing - Design Review10/24/2017 10/25/2017 PASS
DetailsSarah Schafer
Plan assigned to (CJW)10/24/201710/24/201710/24/2017 DONE
DetailsCarl Westfall
Routing - PLAN CHECK10/24/2017 10/24/2017 PASS
DetailsCarl Westfall
Additional parking lot pole lighting added.
Plan resubmittals requested  10/24/2017 DONE
Turned in a Plan Mod App, but permit has never been issued
Routing PW Street Lights10/24/2017 10/24/2017 PASS
DetailsTom Marshall
Plan resubmittals received  10/24/2017 DONE
Drawings revised to add more parking lot pole lighting.
Routing - PUBLIC WORKS10/24/2017 10/24/2017 PASS
DetailsRachael Beierle
Expiration Notice10/11/201711/1/201710/11/2017 DONE
DetailsBrittany Hill
OVERRIDE  8/8/2017  
Plan assigned to (CJW)5/12/20175/12/20178/8/2017 PASS
DetailsCarl Westfall
(2nd done) (June 15 - 25 days) (19 sheets) Lyle Pearson Service Canopy
PLANS/APPL TAKEN TO FRONT DESK  8/8/2017 DONE
Permit Ready to Issue  8/8/2017 DONE
DetailsChristina Prado
Need :**MUST pick up and pay for attached GRD as well
ACHD-MET,
RP, -MET
GC-MET
Revised Certificate of Value for issuance
Plan resubmittals received  8/7/2017 DONE
Routing - PLAN CHECK8/2/2017 8/7/2017 PASS
DetailsCarl Westfall
Routing for 2nd review was delayed because the assigned Plans
Examiner was gone on vacation and because ePlanReview was not available because of an upgrade when he came back. He was gone on Aug 2, 3, and 4 (Wed, Thurs, Fri) but was back on Aug. 5 (Saturday). He could have routed it on Saturday had ePlanReview been available.
Routing - Design Review8/7/2017 8/7/2017 PASS
DetailsSarah Schafer
Approved per DRH16-00388
Route to Impact Fee Review7/22/20177/25/20177/26/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK5/12/2017 7/22/2017 FAIL
DetailsCarl Westfall
Revised drawings required
1st review completed  7/22/2017 DONE
Plan resubmittals requested  7/22/2017 DONE
Routing - Design Review6/5/2017 6/5/2017 FAIL
DetailsSarah Schafer
Brian Murphy brought to my attention the fact that the parking along the canal is within the 30-foot canal easement. Brian Murphy is working with the engineer to obtain a license agreement for the parking or move the parking. Until agreement is reached the building permit can not be approved unless document received from the irrigation company.
Routing Off Site - STRUCTURAL5/12/2017 5/25/2017 PASS
DetailsCarl Westfall
Dave Haugland (AHJ)
Routing - PLANNING Land Div5/12/2017 5/18/2017 PASS
DetailsTodd Tucker
Routing - Design Review5/12/2017 5/16/2017 PASS
DetailsSarah Schafer
Routing - FIRE5/12/20175/12/20175/15/2017 PASS
DetailsKatie Marron
Site modifications improved FD Access. Canopy has sufficient height clearance but access through canopy is not required for building.
Routing PW Drainage5/15/2017 5/15/2017 PASS
DetailsBrian Murphy
PART OF APPROVED MASTER PLAN.
Routing PW Street Lights5/15/2017 5/15/2017 PASS
DetailsTom Marshall
Routing - Addressing5/12/2017 5/15/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS5/12/2017 5/15/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment5/12/2017 5/15/2017 PASS
DetailsMelissa Jannusch
ESC plan ok
Intake Approval  5/12/2017 PASS
DetailsAdele J Schaffeld-Griffin
Carl M completed pre screen, verified plan review fee paid
Application received  5/11/2017 DONE
Application submitted via PDS Online on May 11 2017 11:47AM