Telephone call | | | 12/13/2019 | | DONE |
|
|
|
Spoke with Jessica regarding final fees due. She took the information and said she would relay it to Jack in accounts payable.
|
Print Statement | | | 12/13/2019 | | DONE |
|
|
|
|
Third Notice | | 4/16/2019 | 4/12/2019 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Third Notice | | 3/12/2019 | 4/11/2019 | | DONE |
|
|
|
mailed 4-12-19 with third and final follow up letter
|
Third Follow up | | | 4/11/2019 | | DONE |
|
|
|
final follow up letter
|
Third Notice | | 2/11/2019 | 3/7/2019 | | DONE |
|
|
|
mailed 3-11 with second follow up letter
|
Second Follow up | | | 3/7/2019 | | DONE |
|
|
|
|
Third Notice | | 1/13/2019 | 2/6/2019 | | DONE |
|
|
|
mailed 2/11/19 with first follow up letter
|
First Follow up | | | 2/6/2019 | | DONE |
|
|
|
|
Third Notice | | 12/18/2018 | 1/8/2019 | | DONE |
|
|
|
mailed 1-11-19
|
Third Notice | | 11/18/2018 | 12/13/2018 | | DONE |
|
|
|
mailed 12-14
|
Second Notice | | 10/22/2018 | 11/13/2018 | | DONE |
|
|
|
mailed 11-14
|
First Notice | | 9/29/2018 | 10/12/2018 | | DONE |
|
|
|
mailed 10-15-18
|
Print Occupancy Form | | | 9/19/2018 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/19/2018 | | DONE |
|
|
|
|
BLD-Final | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Mike Jordan
|
|
|
Bruce Phone #: ###-####
|
Zoning Approval | 9/18/2018 | 9/18/2018 | 9/18/2018 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Fire dept verified gate function
Bruce Phone #: ###-####
|
PubWorks Occupancy Approval | 7/5/2018 | 7/5/2018 | 7/5/2018 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/28/2018 | 6/28/2018 | 7/2/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need verification from the fire dept that the knox key for activation of the gate is functional.
Please call ahead for access - Bruce Phone #: ###-####
|
BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Mike Jordan
|
|
|
BRUCE Phone #: ###-####. Ok for Temp. occ. Will be ok for perm occ. once zoning and fire sign perm.
|
FIRE-Final Inspection | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given with scott and rons permission until the fire hydrant and opticon has been installed and tested.
BRUCE Phone #: ###-####
|
Zoning Approval Temp | 2/2/2018 | 2/2/2018 | 2/2/2018 | | DONE |
Katelyn Menuge
|
|
|
Temp Zoning Approval- BND18-00027 Asphalt and landscape
|
Recd Pcfee & Taken To Pln CK | | | 2/2/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/2/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/2/2018 | | DONE |
|
|
|
|
FIRE-Conference | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | DONE |
Troy Cobbley
|
|
|
We discussed life safety issues. There were no fire review notes on site. I noted that an Opticon may be required at the electric gate and the contractor neeeded to verify the correct size of fire extinguishers needed. Also the fire hydrant has not been installed yet.
Bruce Phone #: ###-####
|
BLD-Conference | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | DONE |
Mike Jordan
|
|
|
Bruce Phone #: ###-####
|
BLD-Foundation | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Brandon Shaw
|
|
|
wall 11 pour time // shawn Phone #: ###-####
|
BLD-Footing | 11/14/2017 | 11/14/2017 | 11/14/2017 | P | PASS |
Mike Jordan
|
|
|
pour time 1:15pm- Sean Phone #: ###-####. Additional column pad footings on north side of building for added overhead door.
|
CHANGE STATUS TO (ISS) | | | 11/14/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/13/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 11/9/2017 | 11/9/2017 | 11/13/2017 | | PASS |
Carl Westfall
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 11/9/2017 | | 11/13/2017 | | PASS |
Carl Westfall
|
|
|
To modify the footings and foundation along Grid 6 to be similar to the footings and foundation along Grid 1 to allow for an overhead door in the wall at Grid 6. The overhead door was shown on the architectural drawings from the beginning but not on the metal building drawings. Since the proposed foundation along Grid 6 appears to be the same along Grid 1 which has already been reviewed and approved and the conditions appear to be the same, it did not seem necessary to send it back to the Consultant Structural Engineer for review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/13/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
DO NOT RE-ISSUE - Change status to ISS once all review fees are paid in full
|
Plan Modification Accepted | | | 11/9/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod requested to revise the footing details
|
BLD-Foundation | 11/3/2017 | 11/6/2017 | 11/6/2017 | P | CANC |
Brandon Shaw
|
|
|
Bruce Phone #: ###-####
|
BLD-Footing | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Other | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | NR |
Mike Jordan
|
|
|
rebar // Bruce Phone #: ###-####. Moved to pm inspection.
|
Issue PAID IN FULL permit | | | 11/1/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/12/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 7/7/2017 | 7/7/2017 | 10/12/2017 | | PASS |
Carl Westfall
|
|
|
(4th done) (Aug 10 - 25 days) (19 sheets) Baird Oil
|
Plan resubmittals received | | | 10/12/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2017 | | 10/12/2017 | | PASS |
Carl Westfall
|
|
|
|
Routing - Design Review | 10/12/2017 | | 10/12/2017 | | PASS |
Andrea Tuning
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/12/2017 | | DONE |
|
|
|
ALL MET
Need
GC FORM
Revised Cert of Value
|
Plan resubmittals requested | | | 10/9/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/6/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/6/2017 | | 10/6/2017 | | PASS |
Carl Westfall
|
|
|
Started routing
|
Routing - Design Review | 10/6/2017 | | 10/6/2017 | | FAIL |
Andrea Tuning
|
|
|
The ESC, civil site plan, archteictural site plan and landscape plans do not match one another.
The applicant is also required to pave all areas where trucks and vehicles will drive, park or manuever.
|
Plan resubmittals requested | | | 10/3/2017 | | DONE |
|
|
|
|
Routing PW Drainage | 10/2/2017 | | 10/3/2017 | | PASS |
Brian Murphy
|
|
|
|
Meeting | | | 10/2/2017 | | DONE |
|
|
|
Appendix J taken to Brian Mu
|
Plan resubmittals received | | | 10/2/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/2/2017 | | 10/2/2017 | | PASS |
Carl Westfall
|
|
|
Drawings approved
|
Routing - Design Review | 10/2/2017 | | 10/2/2017 | | FAIL |
Andrea Tuning
|
|
|
The ESC, civil site plan, archteictural site plan and landscape plans do not match one another.
The applicant is also required to pave all areas where trucks and vehicles will drive, park or manuever.
|
Additional plans submitted | | | 9/29/2017 | | DONE |
|
|
|
received original O & M agreement; taken to Brian Murphy
|
Plan resubmittals requested | | | 9/21/2017 | | DONE |
|
|
|
|
Routing - FIRE | 9/12/2017 | | 9/20/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Drainage | 9/12/2017 | | 9/15/2017 | | FAIL |
Brian Murphy
|
|
|
need drainage reportand o and m hydrocarbon filter
|
Routing Off Site - STRUCTURAL | 9/12/2017 | | 9/14/2017 | | PASS |
Carl Westfall
|
|
|
Chris Holladay (AHJ)
|
Routing - Design Review | 9/12/2017 | | 9/12/2017 | | FAIL |
Andrea Tuning
|
|
|
The site plan shall be accurate and complete. It shall include property lines, structures, surfacing, fencing, etc.
The site plana nd landscape plan do not match.
Paint the existing building to match the colors and materials proposed with the new building or construct the new building using green standing metal seam walls, white standing metal seam roof and brown trim to match the existing building.
Install weather protection that is a minimum of 3-feet in depth over the main entrance of the new building.
Pave all drive aisles where trucks and vehicles will travel.
|
Routing - PLAN CHECK | 9/11/2017 | | 9/12/2017 | | PASS |
Carl Westfall
|
|
|
Pending approval by structural
|
Plan resubmittals received | | | 9/11/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 8/19/2017 | 8/22/2017 | 8/25/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 8/22/2017 | | DONE |
|
|
|
Street lights signed off so that the workflow could be sent back to the Architect.
|
1st review completed | | | 8/22/2017 | | DONE |
|
|
|
|
Routing PW Street Lights | 7/10/2017 | | 8/21/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PLAN CHECK | 7/7/2017 | | 8/19/2017 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Plan resubmittals requested | | | 8/19/2017 | | DONE |
|
|
|
Plan review report Emailed to the Architect. Street lights has not signed off so the workflow could not be sent back to the Architect.
|
Routing PW Solid Waste | 7/10/2017 | | 8/1/2017 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/7/2017 | | 7/27/2017 | | FAIL |
Carl Westfall
|
|
|
Chris Holladay (AHJ)
|
Plan Reviewer's activity | | | 7/26/2017 | | DONE |
|
|
|
Received and uploaded structural calculations for the metal building
|
Routing PW Drainage | 7/10/2017 | | 7/21/2017 | | FAIL |
Brian Murphy
|
|
|
need hydro carbon insert and enginer letter
|
Routing PW Sewer Design | 7/10/2017 | | 7/13/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Parcel is on septic.
|
Routing - Erosion and Sediment | 7/7/2017 | | 7/12/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan and site map approved. Valid PD, need to designate RP.
|
Routing - Addressing | 7/7/2017 | | 7/11/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - FIRE | 7/7/2017 | 7/7/2017 | 7/10/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing PW Environmental | 7/10/2017 | | 7/10/2017 | | PASS |
Terry Alber
|
|
|
No interior drains noted.
|
Routing - PUBLIC WORKS | 7/7/2017 | | 7/10/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 7/7/2017 | | 7/10/2017 | | PASS |
Cody Riddle
|
|
|
Approved by DR.
|
Routing - PLANNING Land Div | 7/7/2017 | | 7/10/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Design Review | 7/7/2017 | | 7/7/2017 | | FAIL |
Andrea Tuning
|
|
|
The site plan shall be accurate and complete. It shall include property lines, structures, surfacing, fencing, etc.
Paint the existing building to match the colors and materials proposed with the new building or construct the new building using green standing metal seam walls, white standing metal seam roof and brown trim to match the existing building.
Install weather protection that is a minimum of 3-feet in depth over the main entrance of the new building.
Pave all drive aisles where trucks and vehicles will travel.
|
Intake Approval | | | 7/7/2017 | | PASS |
|
|
|
|
Intake Approval | | | 7/1/2017 | | FAIL |
Julie Romig
|
|
|
Need:
1. Erosion control narrative and plans
2. Verification of Legal Lot or Parcel Form - contact Todd Tucker
3. Upload metal building drawings as individual sheets.
4. Structural details and calculations for foundation and attachment of metal building to foundation.
5. Structural calculations for metal building.
6. Door and door hardware schedule.
7. Location of required plumbing fixtures.
|
Application received | | | 6/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 29 2017 12:11PM
|