Permanent Occupancy | | | 1/9/2019 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Dave Hannah
|
|
|
Laura Phone #: ###-####
|
BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | NR |
Dave Hannah
|
|
|
Laura Phone #: ###-####
|
Zoning Approval | 12/21/2018 | 12/21/2018 | 12/21/2018 | | PASS |
Josh Wilson
|
|
|
Bonded improvements are complete. Ok for permanent occ.
|
BLD-Final | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Dave Hannah
|
|
|
For OK to remove restirction to TCO and allow residential occupancy, (not ready for pernanent certificate of occupancy). Call Laura with questions at ###-####. ok for tco
|
FIRE-Final Inspection | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Jim Page
|
|
|
Previously noted items for life fire safety have been corrected, life fire safety inspection is complete.
Laura Phone #: ###-####
|
Temporary Occupancy | 11/16/2018 | 2/14/2019 | 11/16/2018 | | DONE |
Brittany Hill
|
|
|
|
Temporary Occupancy | 11/5/2018 | 1/30/2019 | 11/5/2018 | | DONE |
Christina Prado
|
|
|
Per attached completed Occupancy sign off card
|
PubWorks Occupancy Approval | 11/5/2018 | 11/5/2018 | 11/5/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 10/31/2018 | 11/1/2018 | 11/2/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok for tco ok for staff and ok to load furniture
|
Zoning Approval Temp | 11/2/2018 | 11/2/2018 | 11/2/2018 | | PASS |
Josh Wilson
|
|
|
Bond in place for site amenities.
|
Telephone call | | | 11/2/2018 | | DONE |
Christina Prado
|
|
|
Called contact to request copy of inspection card as needed to issue TCO, will send via email
|
FIRE-Final Inspection | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PART |
Jim Page
|
|
|
Partial life fire safety inspection complete, fire alarm inspection complete, fire sprinkler inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety sign off pending easement issues with building code official as well as acceptance of security gate operation in computer lab area.
Todd Phone #: ###-####
|
BLD-Final | 10/29/2018 | 10/31/2018 | 11/1/2018 | A | NR |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Final | 10/31/2018 | 10/31/2018 | 11/1/2018 | P | NR |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
FIRE-Final Inspection | 10/29/2018 | 10/30/2018 | 10/30/2018 | P | NR |
Jim Page
|
|
|
Project not ready for life fire safety inspection. Associated FIR permits need to be finaled before life fire safety inspection can be completed.
Todd Phone #: ###-####
|
FIRE-Final Inspection | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | FAIL |
Jim Page
|
|
|
Project not ready for life fire safety inspection. Associated FIR permits need to be finaled before life fire safety inspection can be completed.
Todd Phone #: ###-####
|
BLD-Conference | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Conference | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | CANC |
Mike Jordan
|
|
|
Todd Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/16/2018 | | DONE |
|
|
|
paid plan mod
|
OVERRIDE | | | 9/28/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 9/17/2018 | 9/17/2018 | 9/28/2018 | | PASS |
Carl D Madsen
|
|
|
plan mod for parking
|
Routing - PLAN CHECK | 9/17/2018 | | 9/28/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE (plan mod fees due)
|
BLD-Conference | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
Routing PW Drainage | 9/18/2018 | | 9/24/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 9/17/2018 | 9/17/2018 | 9/21/2018 | | PASS |
Erika Akin
|
|
|
Plan Mod- no changes to previous review
|
Routing - Design Review | 9/17/2018 | | 9/19/2018 | | PASS |
Josh Wilson
|
|
|
Modifications to parking area ok per approved parking reduction.
|
Routing - PUBLIC WORKS | 9/17/2018 | | 9/18/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 9/17/2018 | | DONE |
|
|
|
Plan modification (3) application accepted to revise automobile and bicycle parking at lot west of New Path building, per approved CUP18-00058 and related on-site parking adjustments.
|
Routing - PLANNING | 9/17/2018 | | 9/17/2018 | | PASS |
Celine Acord
|
|
|
Approved per CUP18-00058. The existing parking easement agreement (Instrument No. 2###-####07) shall be updated, reviewed, recorded and submitted to the City prior to issuance of an Occupancy Permit.
|
BLD-Framing/Rough-in | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2018 | 8/29/2018 | 8/30/2018 | P | PASS |
Dave Hannah
|
|
|
Todd-partial-ast floor community foom Phone #: ###-####
|
BLD-Framing/Rough-in | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | FAIL |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
OVERRIDE | | | 8/24/2018 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PART |
Dave Hannah
|
|
|
partial 1st fl - Todd Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 8/24/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/24/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2018 | | DONE |
|
|
|
DO NOT REISSUE - plan mod, fees due
|
Plan assigned to (CDM) | 8/23/2018 | 8/23/2018 | 8/23/2018 | | DONE |
Carl D Madsen
|
|
|
|
Plan assigned to (CDM) | 7/18/2018 | 7/18/2018 | 8/23/2018 | | PASS |
Carl D Madsen
|
|
|
New Path Housing Plan Mod
|
Routing - PLAN CHECK | 8/23/2018 | | 8/23/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | NR |
Dave Hannah
|
|
|
partial framing // Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2018 | 8/15/2018 | 8/16/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 8/13/2018 | 8/14/2018 | 8/14/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### 3rd fl drops ok
|
BLD-Other | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd-fire caulking Phone #: ###-####
|
BLD-Energy code compliance | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | DONE |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 8/1/2018 | 8/1/2018 | 8/2/2018 | P | PART |
Dave Hannah
|
|
|
1st floor //Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2018 | 7/30/2018 | 7/31/2018 | P | PART |
Dave Hannah
|
|
|
2nd floor // Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/27/2018 | 7/27/2018 | 7/27/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/25/2018 | 7/25/2018 | 7/26/2018 | P | PASS |
Dave Hannah
|
|
|
stated not part of plan mod // Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/20/2018 | 7/23/2018 | 7/24/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
Plan Modification Accepted | | | 7/18/2018 | | DONE |
|
|
|
Plan modification started to eliminate automatic roll-down smoke curtains at elevator openings.
|
BLD-Framing/Rough-in | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/13/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Dave Hannah
|
|
|
partial insulation - Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/11/2018 | 7/12/2018 | 7/16/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/12/2018 | 7/13/2018 | 7/16/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/10/2018 | 7/11/2018 | 7/12/2018 | P | NR |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/6/2018 | 7/9/2018 | 7/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### 4th floor
|
BLD-Energy code compliance | 7/9/2018 | 7/10/2018 | 7/10/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-#### third floor
|
BLD-Energy code compliance | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Energy code compliance | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 | P | PART |
Dave Hannah
|
|
|
Todd--- also insulation Phone #: ###-#### ground floor room west of entryway ok to insulate ceiling
|
BLD-Framing/Rough-in | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### 4th floor south end ok to insulate 3rd floor south end ok to insulate ceilings
|
BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/28/2018 | P | CANC |
Dave Hannah
|
|
|
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 6/28/2018 | 6/28/2018 | 6/28/2018 | A | PART |
Dave Hannah
|
|
|
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-#### ceilings gruond floor hall ways ok to rock
|
BLD-Framing/Rough-in | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PART |
Dave Hannah
|
|
|
Please call ahead for access - Todd Phone #: ###-#### k to cover lids on forth floor
|
BLD-Framing/Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### trash shoot ok to cover int walls
|
BLD-Framing/Rough-in | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | NR |
Dave Hannah
|
|
|
Todd--partial framing Phone #: ###-####
|
BLD-Wall Bracing | 5/14/2018 | 5/14/2018 | 5/14/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### shear on floors 2,3,and 4 ok
|
BLD-Wall Bracing | 5/10/2018 | 5/11/2018 | 5/14/2018 | A | CANC |
Dave Hannah
|
|
|
Todd Phone #: ###-####
|
FIRE-Conference | 5/10/2018 | 5/11/2018 | 5/11/2018 | P | DONE |
Jim Page
|
|
|
Fire conference about required signage complete.
Todd Phone #: ###-####
|
BLD-Wall cover | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok lids in corradors
|
BLD-Framing/Rough-in | 5/4/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok to cover lids on corradors and down 2ft
|
BLD-Energy code compliance | 5/2/2018 | 5/4/2018 | 5/4/2018 | A | FAIL |
Jim Storey
|
|
|
Todd Phone #: ###-#### no framing insp.
|
BLD-Other | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PART |
Brandon Shaw
|
|
|
Stair #2
|
BLD-Wall Bracing | 4/18/2018 | 4/19/2018 | 4/19/2018 | A | PART |
Dave Hannah
|
|
|
Shear // Todd Phone #: ###-#### ok to cover ext 1st thru 4th wall shear and straping ok also roof sheeting strapes ok ok to cover roof.
|
Inspection Record Card- Bld | | | 2/21/2018 | | DONE |
|
|
|
|
BLD-Wall Bracing | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | NR |
Dave Hannah
|
|
|
Todd-shear and hold down- Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/12/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/12/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/9/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 2/9/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
(per cert of value submitted with plan mod app, no change in value)
|
Plan assigned to (CDM) | 1/12/2018 | 1/12/2018 | 2/8/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 1/20/2018 | | 1/24/2018 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 1/20/2018 | | 1/24/2018 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH17-00575
|
Routing - PLUMBING | 1/20/2018 | | 1/22/2018 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PLAN CHECK | 1/20/2018 | | 1/20/2018 | | PASS |
Carl D Madsen
|
|
|
|
BLD-Other | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | DONE |
Dave Hannah
|
|
|
Todd-as per Todd this inspection has nbothing to do with the plan mod that''s in for review Phone #: ###-####
|
Plan resubmittals received | | | 1/12/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/20/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/20/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/20/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 12/15/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 11/9/2017 | 11/9/2017 | 12/15/2017 | | PASS |
Carl D Madsen
|
|
|
Plan Mod New Path
|
Routing - PLAN CHECK | 12/15/2017 | | 12/15/2017 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 12/15/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for Plan Mod
DO NOT RE-ISSUE - change status to ISS after fees paid in full
|
BLD-Foundation | 11/22/2017 | 11/27/2017 | 11/27/2017 | A | PASS |
Dave Hannah
|
|
|
Pouring at 9:30 - Todd Phone #: ###-####
|
BLD-Footing | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PEND |
Dave Hannah
|
|
|
Todd Phone #: ###-#### ok after spec inspection sign off
|
Issue PAID IN FULL permit | | | 11/9/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/9/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/9/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/8/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 7/17/2017 | 7/17/2017 | 11/8/2017 | | PASS |
Carl D Madsen
|
|
|
New Path
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/8/2017 | | DONE |
|
|
|
In there since 8/25
need
GC
Rev Cert of Val
|
Routing - Design Review | 11/7/2017 | | 11/7/2017 | | PASS |
Andrea Tuning
|
|
|
Angie Brocisous has stated the easement for 21 parking spaces required, perpetual access easement for access across the site has been provided. She has also stated the Idaho Power approval has also been provided.
|
Routing - PLAN CHECK | 11/7/2017 | | 11/7/2017 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 8/19/2017 | 8/22/2017 | 9/29/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 9/12/2017 | | 9/20/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending planning approval.
|
Routing Off Site - STRUCTURAL | 9/12/2017 | | 9/20/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 9/12/2017 | | 9/19/2017 | | FAIL |
Sarah Schafer
|
|
|
The applicant is required to submit a parking easement to be reviewed by the City Attorney's Office and recorded by the Ada County Assesor's Office prior to sign off of the building permit.
|
Routing PW Drainage | 9/12/2017 | | 9/15/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 9/12/2017 | | 9/12/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing Off Site - STRUCTURAL | 8/31/2017 | | 9/9/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/31/2017 | | 9/9/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Street Lights | 9/8/2017 | | 9/8/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - FIRE | 8/31/2017 | 8/31/2017 | 9/6/2017 | | PASS |
Scott Arellano
|
|
|
Attached updated plan review report to plans. Final approval will be subject to satisfactory field inspection by the PDS/Fire life safety field inspector.
|
Routing - Design Review | 8/31/2017 | | 9/6/2017 | | FAIL |
Sarah Schafer
|
|
|
Easement for 21 parking spaces required, perpetual access easement for access across the site required, Idaho Power approval required.
|
Routing PW Sewer Design | 9/6/2017 | | 9/6/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Drainage | 9/6/2017 | | 9/6/2017 | | PASS |
Jason C. Taylor
|
|
|
swale cannot cross property line, see changemark in ePlan. JCT
|
1st review completed | | | 8/19/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/17/2017 | | 8/19/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 7/17/2017 | | 8/19/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Drainage | 7/18/2017 | | 7/28/2017 | | FAIL |
Brian Murphy
|
|
|
NEED NEW SEEPAGE BED AND APDX J
|
Routing - MECHANICAL | 7/17/2017 | | 7/21/2017 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2017 | | 7/20/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - FIRE | 7/17/2017 | 7/17/2017 | 7/19/2017 | | FAIL |
Scott Arellano
|
|
|
Emailed architect plan review comments and attached report to case.
|
Routing PW Sewer Design | 7/18/2017 | | 7/19/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Abandon existing type "C" service in approximatley the same location (70' from upstream manhole). Abandon existing service at the main. Contractor shall contact Boise Public Works 48 hours prior to working on sewer main to obtain plug permit and schedule inspection. Tap permit required for new type "D" service from Boise Public Works.
|
Routing PW Street Lights | 7/18/2017 | | 7/19/2017 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Design Review | 7/17/2017 | | 7/19/2017 | | FAIL |
Sarah Schafer
|
|
|
The applicant will need to submit documentation from Idaho Power regarding distance from powerlines. The applicant will also be required to submit a recorder parking easement. A record of survey also needs to be completed.
|
Routing - PLANNING Land Div | 7/17/2017 | | 7/19/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 7/17/2017 | | 7/18/2017 | | PASS |
Doug Chausow
|
|
|
Should consolidate parcels
|
Routing - Erosion and Sediment | 7/17/2017 | | 7/18/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved. RP TBD.
|
Routing PW Solid Waste | 7/18/2017 | | 7/18/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - PLUMBING | 7/17/2017 | | 7/18/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 7/17/2017 | | 7/18/2017 | | PASS |
Cody Riddle
|
|
|
The property was rezoned, and the project is an allowed use. It was approved by DR.
|
Plan Reviewer's activity | | | 7/17/2017 | | PASS |
Carl Westfall
|
|
|
Plan intake review aproved
|
Intake Approval | | | 7/17/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl W approved pre screen,
alternate sent to Jason for review
|
Application received | | | 7/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2017 11:31AM
|
First Notice | | 1/19/2019 | | | |
|
|
|
|