Permit Information
Permit NumberBLD17-02377
StatusFinaled
Name PACIFIC WEST BUILDERS INC
Site Address 2200 W FAIRVIEW AVE
Project NameNew Path Community Housing
Customer Number 
ePlanReviewYes
Description
(NEW PATH COMMUNITY HOUSING) """PLAN MODIFICATION TO REMOVE THE SMOKE CURTAINS AT THE ELEVATORS NOT REQUIRED BY THE CODE""" To demolish existing 6,061 sq. ft. restaurant building and to construct a new 34,249 sf, 4-story, 41-unit multi-family apartment building and site improvements. This building is fully fire sprinklered for R occupancy and a story increase and is equiped with and alarm system. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  1/9/2019 DONE
DetailsChristina Prado
BLD-Final12/27/201812/28/201812/28/2018APASS
DetailsDave Hannah
Laura Phone #: ###-####
BLD-Final12/20/201812/21/201812/21/2018ANR
DetailsDave Hannah
Laura Phone #: ###-####
Zoning Approval12/21/201812/21/201812/21/2018 PASS
DetailsJosh Wilson
Bonded improvements are complete. Ok for permanent occ.
BLD-Final11/16/201811/16/201811/16/2018PPART
DetailsDave Hannah
For OK to remove restirction to TCO and allow residential occupancy, (not ready for pernanent certificate of occupancy). Call Laura with questions at ###-####. ok for tco
FIRE-Final Inspection11/15/201811/16/201811/16/2018APASS
DetailsJim Page
Previously noted items for life fire safety have been corrected, life fire safety inspection is complete.

Laura Phone #: ###-####
Temporary Occupancy11/16/20182/14/201911/16/2018 DONE
DetailsBrittany Hill
Temporary Occupancy11/5/20181/30/201911/5/2018 DONE
DetailsChristina Prado
Per attached completed Occupancy sign off card
PubWorks Occupancy Approval11/5/201811/5/201811/5/2018 DONE
DetailsTiffany Lowery
BLD-Final10/31/201811/1/201811/2/2018PPART
DetailsDave Hannah
Todd Phone #: ###-#### ok for tco ok for staff and ok to load furniture
Zoning Approval Temp11/2/201811/2/201811/2/2018 PASS
DetailsJosh Wilson
Bond in place for site amenities.
Telephone call  11/2/2018 DONE
DetailsChristina Prado
Called contact to request copy of inspection card as needed to issue TCO, will send via email
FIRE-Final Inspection10/31/201811/1/201811/1/2018APART
DetailsJim Page
Partial life fire safety inspection complete, fire alarm inspection complete, fire sprinkler inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety sign off pending easement issues with building code official as well as acceptance of security gate operation in computer lab area.

Todd Phone #: ###-####
BLD-Final10/29/201810/31/201811/1/2018ANR
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Final10/31/201810/31/201811/1/2018PNR
DetailsDave Hannah
Todd Phone #: ###-####
FIRE-Final Inspection10/29/201810/30/201810/30/2018PNR
DetailsJim Page
Project not ready for life fire safety inspection. Associated FIR permits need to be finaled before life fire safety inspection can be completed.

Todd Phone #: ###-####
FIRE-Final Inspection10/25/201810/26/201810/26/2018AFAIL
DetailsJim Page
Project not ready for life fire safety inspection. Associated FIR permits need to be finaled before life fire safety inspection can be completed.

Todd Phone #: ###-####
BLD-Conference10/16/201810/17/201810/17/2018ADONE
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Conference10/15/201810/16/201810/16/2018ACANC
DetailsMike Jordan
Todd Phone #: ###-####
CHANGE STATUS TO (ISS)  10/16/2018 DONE
paid plan mod
OVERRIDE  9/28/2018  
Plan assigned to (CDM)9/17/20189/17/20189/28/2018 PASS
DetailsCarl D Madsen
plan mod for parking
Routing - PLAN CHECK9/17/2018 9/28/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/28/2018 DONE
Permit Ready to Issue  9/28/2018 DONE
Plan Mod Approved
DO NOT REISSUE (plan mod fees due)
BLD-Conference9/25/20189/26/20189/26/2018ADONE
DetailsDave Hannah
Todd Phone #: ###-####
Routing PW Drainage9/18/2018 9/24/2018 PASS
DetailsBrian Murphy
Routing - FIRE9/17/20189/17/20189/21/2018 PASS
DetailsErika Akin
Plan Mod- no changes to previous review
Routing - Design Review9/17/2018 9/19/2018 PASS
DetailsJosh Wilson
Modifications to parking area ok per approved parking reduction.
Routing - PUBLIC WORKS9/17/2018 9/18/2018 PASS
DetailsRachael Beierle
Plan Modification Accepted  9/17/2018 DONE
Plan modification (3) application accepted to revise automobile and bicycle parking at lot west of New Path building, per approved CUP18-00058 and related on-site parking adjustments.
Routing - PLANNING9/17/2018 9/17/2018 PASS
DetailsCeline Acord
Approved per CUP18-00058. The existing parking easement agreement (Instrument No. 2###-####07) shall be updated, reviewed, recorded and submitted to the City prior to issuance of an Occupancy Permit.
BLD-Framing/Rough-in9/10/20189/10/20189/10/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in8/28/20188/29/20188/30/2018PPASS
DetailsDave Hannah
Todd-partial-ast floor community foom Phone #: ###-####
BLD-Framing/Rough-in8/28/20188/28/20188/28/2018PFAIL
DetailsDave Hannah
Todd Phone #: ###-####
OVERRIDE  8/24/2018  
BLD-Framing/Rough-in8/23/20188/24/20188/24/2018APART
DetailsDave Hannah
partial 1st fl - Todd Phone #: ###-####
CHANGE STATUS TO (ISS)  8/24/2018 DONE
Print Occupancy Form  8/24/2018 DONE
Permit Ready to Issue  8/24/2018 DONE
DO NOT REISSUE - plan mod, fees due
Plan assigned to (CDM)8/23/20188/23/20188/23/2018 DONE
DetailsCarl D Madsen
Plan assigned to (CDM)7/18/20187/18/20188/23/2018 PASS
DetailsCarl D Madsen
New Path Housing Plan Mod
Routing - PLAN CHECK8/23/2018 8/23/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  8/23/2018 DONE
BLD-Framing/Rough-in8/21/20188/21/20188/21/2018PNR
DetailsDave Hannah
partial framing // Todd Phone #: ###-####
BLD-Framing/Rough-in8/15/20188/15/20188/16/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance8/13/20188/14/20188/14/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in8/13/20188/13/20188/13/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-#### 3rd fl drops ok
BLD-Other8/10/20188/10/20188/10/2018PPASS
DetailsDave Hannah
Todd-fire caulking Phone #: ###-####
BLD-Energy code compliance8/9/20188/9/20188/9/2018PDONE
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in8/8/20188/8/20188/8/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance8/2/20188/3/20188/3/2018APASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in8/1/20188/1/20188/2/2018PPART
DetailsDave Hannah
1st floor //Todd Phone #: ###-####
BLD-Framing/Rough-in7/30/20187/30/20187/31/2018PPART
DetailsDave Hannah
2nd floor // Todd Phone #: ###-####
BLD-Energy code compliance7/27/20187/27/20187/27/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance7/25/20187/25/20187/26/2018PPASS
DetailsDave Hannah
stated not part of plan mod // Todd Phone #: ###-####
BLD-Framing/Rough-in7/24/20187/24/20187/24/2018PPASS
DetailsDave Hannah
todd Phone #: ###-####
BLD-Framing/Rough-in7/20/20187/23/20187/24/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance7/19/20187/19/20187/19/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in7/17/20187/18/20187/18/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
Plan Modification Accepted  7/18/2018 DONE
Plan modification started to eliminate automatic roll-down smoke curtains at elevator openings.
BLD-Framing/Rough-in7/16/20187/17/20187/17/2018APASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance7/13/20187/16/20187/16/2018PPASS
DetailsDave Hannah
partial insulation - Todd Phone #: ###-####
BLD-Energy code compliance7/11/20187/12/20187/16/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance7/12/20187/13/20187/16/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance7/10/20187/11/20187/12/2018PNR
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in7/6/20187/9/20187/10/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-#### 4th floor
BLD-Energy code compliance7/9/20187/10/20187/10/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in7/9/20187/10/20187/10/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-#### third floor
BLD-Energy code compliance7/5/20187/6/20187/6/2018PPASS
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Energy code compliance7/5/20187/5/20187/5/2018PPART
DetailsDave Hannah
Todd Phone #: ###-####
BLD-Framing/Rough-in7/2/20187/3/20187/3/2018PPART
DetailsDave Hannah
Todd--- also insulation Phone #: ###-#### ground floor room west of entryway ok to insulate ceiling
BLD-Framing/Rough-in6/29/20187/2/20187/2/2018APART
DetailsDave Hannah
Todd Phone #: ###-#### 4th floor south end ok to insulate 3rd floor south end ok to insulate ceilings
BLD-Framing/Rough-in6/27/20186/27/20186/28/2018PCANC
DetailsDave Hannah
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-####
BLD-Framing/Rough-in6/28/20186/28/20186/28/2018APART
DetailsDave Hannah
Todd-partial-please call when on way so Todd can meet for inspection Phone #: ###-#### ceilings gruond floor hall ways ok to rock
BLD-Framing/Rough-in6/20/20186/21/20186/21/2018APART
DetailsDave Hannah
Please call ahead for access - Todd Phone #: ###-#### k to cover lids on forth floor
BLD-Framing/Rough-in6/18/20186/18/20186/18/2018PPART
DetailsDave Hannah
Todd Phone #: ###-#### trash shoot ok to cover int walls
BLD-Framing/Rough-in5/25/20185/29/20185/29/2018ANR
DetailsDave Hannah
Todd--partial framing Phone #: ###-####
BLD-Wall Bracing5/14/20185/14/20185/14/2018APART
DetailsDave Hannah
Todd Phone #: ###-#### shear on floors 2,3,and 4 ok
BLD-Wall Bracing5/10/20185/11/20185/14/2018ACANC
DetailsDave Hannah
Todd Phone #: ###-####
FIRE-Conference5/10/20185/11/20185/11/2018PDONE
DetailsJim Page
Fire conference about required signage complete.

Todd Phone #: ###-####
BLD-Wall cover5/9/20185/10/20185/10/2018APART
DetailsDave Hannah
Todd Phone #: ###-#### ok lids in corradors
BLD-Framing/Rough-in5/4/20185/8/20185/8/2018APART
DetailsDave Hannah
Todd Phone #: ###-#### ok to cover lids on corradors and down 2ft
BLD-Energy code compliance5/2/20185/4/20185/4/2018AFAIL
DetailsJim Storey
Todd Phone #: ###-#### no framing insp.
BLD-Other4/27/20184/30/20184/30/2018APART
DetailsBrandon Shaw
Stair #2
BLD-Wall Bracing4/18/20184/19/20184/19/2018APART
DetailsDave Hannah
Shear // Todd Phone #: ###-#### ok to cover ext 1st thru 4th wall shear and straping ok also roof sheeting strapes ok ok to cover roof.
Inspection Record Card- Bld  2/21/2018 DONE
BLD-Wall Bracing2/15/20182/16/20182/16/2018ANR
DetailsDave Hannah
Todd-shear and hold down- Phone #: ###-####
CHANGE STATUS TO (ISS)  2/12/2018 DONE
(F) Reprint permit  2/12/2018 DONE
OVERRIDE  2/9/2018  
Permit Ready to Issue  2/9/2018 DONE
Plan Mod Approved
DO NOT REISSUE
(per cert of value submitted with plan mod app, no change in value)
Plan assigned to (CDM)1/12/20181/12/20182/8/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  2/8/2018 DONE
Routing - MECHANICAL1/20/2018 1/24/2018 PASS
DetailsTroy James
Routing - Design Review1/20/2018 1/24/2018 PASS
DetailsSarah Schafer
Approved per DRH17-00575
Routing - PLUMBING1/20/2018 1/22/2018 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - PLAN CHECK1/20/2018 1/20/2018 PASS
DetailsCarl D Madsen
BLD-Other1/16/20181/17/20181/17/2018ADONE
DetailsDave Hannah
Todd-as per Todd this inspection has nbothing to do with the plan mod that''s in for review Phone #: ###-####
Plan resubmittals received  1/12/2018 DONE
CHANGE STATUS TO (ISS)  12/20/2017 DONE
(F) Reprint permit  12/20/2017 DONE
Print Occupancy Form  12/20/2017 DONE
OVERRIDE  12/15/2017  
Plan assigned to (CDM)11/9/201711/9/201712/15/2017 PASS
DetailsCarl D Madsen
Plan Mod New Path
Routing - PLAN CHECK12/15/2017 12/15/2017 PASS
DetailsCarl D Madsen
Permit Ready to Issue  12/15/2017 DONE
DetailsChristina Prado
All requirements met for Plan Mod

DO NOT RE-ISSUE - change status to ISS after fees paid in full
BLD-Foundation11/22/201711/27/201711/27/2017APASS
DetailsDave Hannah
Pouring at 9:30 - Todd Phone #: ###-####
BLD-Footing11/13/201711/14/201711/14/2017APEND
DetailsDave Hannah
Todd Phone #: ###-#### ok after spec inspection sign off
Issue PAID IN FULL permit  11/9/2017 DONE
Print Occupancy Form  11/9/2017 DONE
Plan Modification Accepted  11/9/2017 DONE
OVERRIDE  11/8/2017  
Plan assigned to (CDM)7/17/20177/17/201711/8/2017 PASS
DetailsCarl D Madsen
New Path
PLANS/APPL TAKEN TO FRONT DESK  11/8/2017 DONE
Permit Ready to Issue  11/8/2017 DONE
In there since 8/25
need
GC
Rev Cert of Val
Routing - Design Review11/7/2017 11/7/2017 PASS
DetailsAndrea Tuning
Angie Brocisous has stated the easement for 21 parking spaces required, perpetual access easement for access across the site has been provided. She has also stated the Idaho Power approval has also been provided.
Routing - PLAN CHECK11/7/2017 11/7/2017 PASS
DetailsCarl D Madsen
Route to Impact Fee Review8/19/20178/22/20179/29/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK9/12/2017 9/20/2017 FAIL
DetailsCarl D Madsen
Failed pending planning approval.
Routing Off Site - STRUCTURAL9/12/2017 9/20/2017 PASS
DetailsCarl D Madsen
Routing - Design Review9/12/2017 9/19/2017 FAIL
DetailsSarah Schafer
The applicant is required to submit a parking easement to be reviewed by the City Attorney's Office and recorded by the Ada County Assesor's Office prior to sign off of the building permit.
Routing PW Drainage9/12/2017 9/15/2017 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS9/12/2017 9/12/2017 PASS
DetailsMorgan Webb
Routing Off Site - STRUCTURAL8/31/2017 9/9/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK8/31/2017 9/9/2017 FAIL
DetailsCarl D Madsen
Routing PW Street Lights9/8/2017 9/8/2017 PASS
DetailsTom Marshall
Routing - FIRE8/31/20178/31/20179/6/2017 PASS
DetailsScott Arellano
Attached updated plan review report to plans. Final approval will be subject to satisfactory field inspection by the PDS/Fire life safety field inspector.
Routing - Design Review8/31/2017 9/6/2017 FAIL
DetailsSarah Schafer
Easement for 21 parking spaces required, perpetual access easement for access across the site required, Idaho Power approval required.
Routing PW Sewer Design9/6/2017 9/6/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Drainage9/6/2017 9/6/2017 PASS
DetailsJason C. Taylor
swale cannot cross property line, see changemark in ePlan. JCT
1st review completed  8/19/2017 FAIL
Routing - PLAN CHECK7/17/2017 8/19/2017 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL7/17/2017 8/19/2017 FAIL
DetailsCarl D Madsen
Routing PW Drainage7/18/2017 7/28/2017 FAIL
DetailsBrian Murphy
NEED NEW SEEPAGE BED AND APDX J
Routing - MECHANICAL7/17/2017 7/21/2017 PASS
DetailsTroy James
Routing - PUBLIC WORKS7/17/2017 7/20/2017 PASS
DetailsRachael Beierle
Routing - FIRE7/17/20177/17/20177/19/2017 FAIL
DetailsScott Arellano
Emailed architect plan review comments and attached report to case.
Routing PW Sewer Design7/18/2017 7/19/2017 FAIL
DetailsKyle S. Rosenmeyer
Abandon existing type "C" service in approximatley the same location (70' from upstream manhole). Abandon existing service at the main. Contractor shall contact Boise Public Works 48 hours prior to working on sewer main to obtain plug permit and schedule inspection. Tap permit required for new type "D" service from Boise Public Works.
Routing PW Street Lights7/18/2017 7/19/2017 FAIL
DetailsTom Marshall
Routing - Design Review7/17/2017 7/19/2017 FAIL
DetailsSarah Schafer
The applicant will need to submit documentation from Idaho Power regarding distance from powerlines. The applicant will also be required to submit a recorder parking easement. A record of survey also needs to be completed.
Routing - PLANNING Land Div7/17/2017 7/19/2017 PASS
DetailsTodd Tucker
Routing - Addressing7/17/2017 7/18/2017 PASS
DetailsDoug Chausow
Should consolidate parcels
Routing - Erosion and Sediment7/17/2017 7/18/2017 PASS
DetailsMelissa Jannusch
Plan approved. RP TBD.
Routing PW Solid Waste7/18/2017 7/18/2017 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing - PLUMBING7/17/2017 7/18/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING7/17/2017 7/18/2017 PASS
DetailsCody Riddle
The property was rezoned, and the project is an allowed use. It was approved by DR.
Plan Reviewer's activity  7/17/2017 PASS
DetailsCarl Westfall
Plan intake review aproved
Intake Approval  7/17/2017 PASS
DetailsAdele J Schaffeld-Griffin
Carl W approved pre screen,
alternate sent to Jason for review
Application received  7/13/2017 DONE
Application submitted via PDS Online on Jul 13 2017 11:31AM
First Notice 1/19/2019