Print Statement | | | 4/3/2020 | | DONE |
|
|
|
Second notice
|
Print Statement | | | 3/13/2020 | | DONE |
|
|
|
FIRST NOTICE
|
Print Statement | | | 1/29/2020 | | DONE |
|
|
|
|
Meeting | | | 1/23/2020 | | DONE |
|
|
|
asked gc to fill out showing the OVERALL project value. form turned in had 40,000+ for project value and trades add up to 80,000+
|
Third Notice | | 12/2/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20 with third and final follow up
|
Third Follow up | | | 12/30/2019 | | DONE |
|
|
|
|
Third Notice | | 11/3/2019 | 11/27/2019 | | DONE |
|
|
|
mailed 12-2-19 with second follow up
|
Second Follow up | | | 11/27/2019 | | DONE |
|
|
|
|
Third Notice | | 9/24/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1 with first follow up letter
|
First Follow up | | | 10/29/2019 | | DONE |
|
|
|
|
Third Notice | | 8/18/2019 | 9/19/2019 | | DONE |
|
|
|
mailed 9-20-19
|
Third Notice | | 7/15/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13
|
Second Notice | | 6/20/2019 | 7/10/2019 | | DONE |
|
|
|
mailed 7-11
|
First Notice | | 5/24/2019 | 6/10/2019 | | DONE |
|
|
|
mailed 6-11
|
Permanent Occupancy | | | 5/14/2019 | | DONE |
|
|
|
|
BLD-Final | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Sly
|
|
|
Jake- please give call 20 min prior, he is not available between 11-12. Phone #: ###-#### OK for Temp. Occ. OK for Perm. Occ. when........Plumbing signs off Perm, and Locksets on office and storage room doors are changed out. (3). 5-14-19-as per Jim Sly ok to change PART to Final
|
BLD-Final | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | NH |
Jim Sly
|
|
|
Jake-call 20 minutes prior to meet Phone #: ###-#### Called twice.....Busy signal.......left Note on door. No access........
|
FIRE-Final Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide single action hardware on the Office door, door that isolates Storage area and the exterior exit door from the Storage area prior to a building inspection as per discussion.
after 130....please call 20 mins before // jake Phone #: ###-####
|
FIRE-Final Inspection | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide review comments, provide exit discharge lights at the two exits, the pizza oven must fit under the hood by 6" as per mechanical code, provide single action (lever type) hardware for doors 103A and 102A, remove both dead bolts at the main exit doors, provide panic hardware and exit light, exit sign, exit discharge light at door 106A or provide plan review approval of alternate (plans show area as a "M" but is currently being used as an "S").
Jake-please call 20 minutes prior to meet for access Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/10/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Sly
|
|
|
Jake-pleae call 20 minutes prior to meet Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | NR |
Dave Hannah
|
|
|
Jake-please call 30 mintues prior to meet Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2018 | 4/25/2018 | 4/26/2018 | P | PART |
Jim Sly
|
|
|
Jake Phone #: ###-#### Select walls
|
Issue PAID IN FULL permit | | | 4/2/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/2/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 2/16/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 12/6/2017 | 12/6/2017 | 2/16/2018 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Dec 26 - 15 days) (20 sheets) Food Land Market
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/16/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/16/2018 | | DONE |
|
|
|
Need:
ACHD -Met
RP - Met
GC form - Met
Revised Value - Met
|
Routing Off Site - C.D.H | 2/8/2018 | | 2/15/2018 | | PASS |
Carl Westfall
|
|
|
Will Reynolds
|
Routing - PLUMBING | 2/8/2018 | | 2/12/2018 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - MECHANICAL | 2/8/2018 | | 2/8/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Rating | 2/8/2018 | | 2/8/2018 | | PASS |
Morgan Webb
|
|
|
New sink added...RATED FOOD SERVICE. NO NEW FEES.
|
Routing - PLAN CHECK | 2/7/2018 | | 2/8/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 2/7/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/25/2018 | 1/28/2018 | 1/26/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 12/6/2017 | | 1/25/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
1st review completed | | | 1/25/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 1/25/2018 | | DONE |
|
|
|
|
Routing - Design Review | 12/6/2017 | | 12/19/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing Off Site - C.D.H | 12/6/2017 | | 12/18/2017 | | FAIL |
Carl Westfall
|
|
|
Will Reynolds
|
Routing PW Environmental | 12/7/2017 | | 12/18/2017 | | PASS |
Rick Christenson
|
|
|
See plumbing note.
|
Routing - FIRE | 12/6/2017 | 12/6/2017 | 12/12/2017 | | PASS |
Erika Akin
|
|
|
Attached review comments to case
|
Routing - MECHANICAL | 12/6/2017 | | 12/12/2017 | | FAIL |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 12/6/2017 | | 12/11/2017 | | PASS |
Michael Zawacki
|
|
|
Waiver approved TI
|
Routing - PLUMBING | 12/6/2017 | | 12/8/2017 | | FAIL |
Bill VanDegrift
|
|
|
indirect waste all kitchen fixtures
see redlines
|
Routing - PUBLIC WORKS | 12/6/2017 | | 12/7/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 12/6/2017 | | 12/6/2017 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 12/6/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl M approved pre screen. Routed to CDH
|
Intake Approval | | | 11/17/2017 | | FAIL |
|
|
|
Please provide the following items.
1. Fire flow letter
2. Sheet A1.1 is indicated but not provided.
3. A new 1,437 pound Unit is being installed. provide structural engineering for the existing roof. Provide any details for any required structural modifications.
4. Provide structural engineering and structural details for the installation of the new type 1 hoods.
|
Application received | | | 11/13/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2017 2:43PM
|