Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-00772
StatusIssued
Name ALLEN ERIC
Site Address 1203 N 18TH ST
Project NameAllen remodel
Customer NumberDRH17-00515
ePlanReviewYes
Description
MODIFICATION - UPDATED ENGINEERING 7/14/20 **jab** Permit for a full gut-to-the-studs remodel & additions that add 440sq' of garage and 318sq' of living space. Final floor plan is 5bd/4bth. All work per plans, notes, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  7/28/2020 DONE
OVERRIDE  7/24/2020  
Plan assigned to (JAB) Josh6/18/20206/18/20207/24/2020 PASS
DetailsJosh Bogle
06/24 Plan Mod - 1st done
Plan Reviewer's activity  7/24/2020 DONE
DetailsJosh Bogle
accepted and routed resubmittal
Routing - Design Review7/24/2020 7/24/2020 PASS
DetailsMichaella Owens
siding shall be wood, windows shall meet material requirements. ken reed said wood siding to match existing in comment.
Permit Ready to Issue  7/24/2020 DONE
PLAN MOD
Routing - PLAN CHECK6/18/2020 7/14/2020 PASS
DetailsJosh Bogle
see Plan Mod Fee sheet for review time
Plan Reviewer's activity  7/10/2020 DONE
DetailsJosh Bogle
conversation with Ken
Routing - PLANNING6/30/2020 7/1/2020 FAIL
DetailsMichaella Owens
Plan Reviewer's activity  6/30/2020 DONE
DetailsJosh Bogle
added missing routings
Plan Modification Accepted  6/18/2020 DONE
Plan Mod - The existing footprint (with the exception of the garage addition) will now have no addition to the house portion (no new square footage), but will have a new interior layout while reinforcing the existing structure.

Paper to ePlan Plan mod, route to JAB
BLD-Aging Inspection11/1/201911/1/201911/4/2019 PEND
DetailsTony Young
BLD-Aging Inspection10/31/201910/31/201911/4/2019 PEND
DetailsTony Young
BLD-Footing7/2/20197/2/20197/2/2019PDEFR
DetailsBrandon Shaw
Refer to BLD18-01815 for New constrution permit...
BLD-Foundation6/18/20196/19/20196/19/2019APART
DetailsTony Young
Sergio Phone #: ###-####,, basement walls , work in progress, ok,,
BLD-Footing6/7/20196/7/20196/7/2019PPASS
DetailsTony Young
Gibir Phone #: ###-####,, basement footings ok
BLD-Aging Inspection2/6/20192/6/20192/8/2019 PEND
DetailsTony Young
BLD-Framing/Rough-in9/24/20189/24/20189/24/2018PPART
DetailsDave Hannah
part- Eric Phone #: ###-#### ok to cover garage door wall and one side wall between house and garage.
BLD-Wall Bracing7/30/20187/30/20187/30/2018PPASS
DetailsTony Young
Allen Phone #: ###-####,, see crayon marks
BLD-Footing4/26/20184/26/20184/26/2018PPASS
DetailsTony Young
Allen Phone #: ###-####,, front post footings
BLD-Foundation4/6/20184/6/20184/9/2018PPASS
DetailsDave Hannah
Eric Phone #: ###-####
BLD-Footing3/19/20183/19/20183/19/2018PPASS
DetailsDave Hannah
Eric Phone #: ###-####
Issue PAID IN FULL permit  3/12/2018 DONE
Meeting  3/12/2018 DONE
per the customer this was a 4 plex that he is now converting to a SFD-once he's done with this they were split the parcel-I prewarned him that if he builds new SFD's on the parcels that are split he will probably ahve to pay impact fees for them (sewer, polic, fire, park & ACHD) i told him what an estimate would be the new SFD
OVERRIDE  3/9/2018  
Routing Walk-In (BLD)3/9/20183/9/20183/9/2018PDONE
DetailsJosh Bogle
Plan assigned to (JAB) Josh3/6/20183/6/20183/9/2018 PASS
DetailsJosh Bogle
1st done - need more structural and energy info
PLANS/APPL TAKEN TO FRONT DESK  3/9/2018 DONE
DetailsJosh Bogle
Permit Ready to Issue  3/9/2018 DONE
DetailsChristina Prado
All requirements met
Routing - PLAN CHECK3/9/2018 3/9/2018 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  3/9/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  3/9/2018 DONE
DetailsJosh Bogle
Routing - PLAN CHECK3/6/2018 3/7/2018 FAIL
DetailsJosh Bogle
1st review completed  3/7/2018 FAIL
DetailsJosh Bogle
Routing Walk-In (Zoning)3/6/20183/6/20183/6/2018PPASS
DetailsSue Cummings
Routing Walk-In (BLD)3/6/20183/6/20183/6/2018PPASS
DetailsJosh Bogle
took in as a level 2 for deeper review
Application received 3/6/2018