BLD-Wall Bracing | 11/8/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Conference | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | CANC |
Tell Riley
|
|
|
ready for framing inspection so I can cover and begin roof, windows, doors, and siding installation. I will be onsite from one until 4:30 pm, thanks Paul Phone #: ###-#### Inspection requested via web by J Goll//needs shear inspection//
|
BLD-Other | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | DONE |
Tell Riley
|
|
|
I would like to cover part of roof sheathing that is ready for roofing, The rough in framing is not quite complete, but will be complete this weekend, trusses are being installed next week, I would appreciate a review of rough in framing. I live within a mile, if I am not onsite, please call me and I can be there in 5 minutes. anytime between 11 and 4 works for me. Thanks Paul Phone #: ###-#### Inspection requested via web by J Goll
|
BLD-Other | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PART |
Tell Riley
|
|
|
Ready to pour concrete slab floor, 5 continuous loops for radiant floor heating are installed, they will be filled with water before pouring concrete which is scheduled to pour tuesday 10:30 am. Not sure which permit this inspection should be done, But want to make sure all is good, thanks Paul Phone #: ###-#### Inspection requested via web by J Goll//correction notice issued to have radiant pipe tested and inspected prior to pouring slab//vapor barrier installed//
|
BLD-Foundation | 4/17/2019 | 4/19/2019 | 4/19/2019 | P | PASS |
Jim Sly
|
|
|
Paul Phone #: ###-#### Inspection requested via web by J Goll
|
BLD-Footing | 7/18/2018 | 7/18/2018 | 7/19/2018 | P | PASS |
Jim Sly
|
|
|
Jesse Phone #: ###-####
|
BLD-Footing | 7/16/2018 | 7/17/2018 | 7/17/2018 | A | NR |
Mike Jordan
|
|
|
Jesse Phone #: ###-####. No one on site. no plans. looks like excavation not deep enough ? will need to reschedule.
|
OVERRIDE | | | 6/4/2018 | | |
|
|
|
|
Plan assigned to (RDP) | 4/18/2018 | 4/18/2018 | 6/4/2018 | | DONE |
Rob Patrick
|
|
|
4/27 sfd L1 Paper...4-27 Failed: Corrections req'd.
|
Inspection Record Card- Bld | | | 6/4/2018 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2018 | | DONE |
|
|
|
Left message for Paul to inform him the permit is ready and what fees are due.
|
Issue PAID IN FULL permit | | | 6/4/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/4/2018 | | 6/4/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 6/4/2018 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/4/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 5/23/2018 | | 5/23/2018 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 5/21/2018 | | DONE |
|
|
|
received one copy of calcs (8 pgs) and two copies of plan sheets C-1, A-1, A-2, A-3, S-1, S-2; taken to Rob
|
Plan resubmittals received | | | 5/16/2018 | | |
|
|
|
received Manual J; taken to Rob
|
Routing - MECHANICAL | 5/16/2018 | | 5/16/2018 | | FAIL |
Troy James
|
|
|
sent corrections to osprey
|
Routing - PLAN CHECK | 5/15/2018 | | 5/15/2018 | | FAIL |
Rob Patrick
|
|
|
All corrections were not completed.
|
Plan resubmittals received | | | 5/14/2018 | | DONE |
|
|
|
Resubmittals received 2 sets of sheets C-1, A-1, A-2, A-3, S-1 & S-2-took to Rob P
|
1st review completed | | | 4/27/2018 | | FAIL |
Rob Patrick
|
|
|
4/27...Failed: Multiple Corrections/Clarifications Req'd
|
Routing - PLAN CHECK | 4/19/2018 | | 4/27/2018 | | FAIL |
Rob Patrick
|
|
|
Failed
|
Route to Impact Fee Review | 4/18/2018 | 4/21/2018 | 4/19/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 4/19/2018 | | 4/19/2018 | | FAIL |
Troy James
|
|
|
Sent a response to applicant in regards to his letter. Need manual j report.
|
Routing - PLANNING | 4/18/2018 | | 4/19/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 4/18/2018 | | 4/18/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/18/2018 | | 4/18/2018 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/18/2018 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/18/2018 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/18/2018 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 4/16/2018 | | FAIL |
|
|
|
Need:
Reduced Site Plan
Full ResCheck (only had one page)
Calcs for cooling system per Troy James (ACCA)
|
Intake Approval | | | 4/3/2018 | | FAIL |
Christina Prado
|
|
|
Need:
18X24 plans
Reduced Site Plan
Full ResCheck
Wall Bracing
Footing/Foundation size called out
ACCA report
|
Application received | | | 3/9/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 9 2018 11:42AM
|