PubWorks Occupancy Approval | 7/2/2019 | 7/2/2019 | 7/2/2019 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 7/2/2019 | | DONE |
|
|
|
|
Temporary Occupancy | 6/26/2019 | 9/24/2019 | 6/26/2019 | | DONE |
Gemma Flores
|
|
|
|
Zoning Approval | 6/26/2019 | 6/26/2019 | 6/26/2019 | | PASS |
Katelyn Menuge
|
|
|
|
BLD-Final | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Tell Riley
|
|
|
window safety devices installed approved plans// final is complete//
|
BLD-Final | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | FAIL |
Tell Riley
|
|
|
Rocco- Phone #: ###-####//add window opening control device per plans// call for re-inspection//
|
PubWorks Temp Occupancy Appr | 6/21/2019 | 6/21/2019 | 6/21/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
Matt Phone #: ###-####
|
BLD-Conference | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | DONE |
Tell Riley
|
|
|
Rocco Phone #: ###-####//discuss review notes for final inspect//
|
FIRE-Conference | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | DONE |
Troy Cobbley
|
|
|
We went over life safety requirements, need plans, need to relocate fire extinguisher, need to verify the smoke alarms ring back.
Charles Phone #: ###-####
|
BLD-Other | 5/9/2019 | 5/9/2019 | 5/9/2019 | P | PASS |
Jim Sly
|
|
|
Chuck- inspection for sauna tubes Phone #: ###-####
|
BLD-Energy code compliance | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Jim Storey
|
|
|
Charles Phone #: ###-####
|
BLD-Framing/Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PASS |
Jim Sly
|
|
|
Chuck Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | PASS |
Jim Sly
|
|
|
Steve-(GC) Phone #: ###-####
|
BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/21/2019 | P | NR |
Dave Hannah
|
|
|
Steve-Charles hired GC-he''s calling in the inspections Phone #: ###-#### needs to fire caulk install draft stops in attic fix i joist cut by plumber
|
BLD-Conference | 1/31/2019 | 1/31/2019 | 1/31/2019 | P | DONE |
Brandon Shaw
|
|
|
First story appartments to be as per plans- 1 hour rated bath fans...
|
BLD-Conference | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Dave Hannah
|
|
|
fire rating issues with duct work // Steve Phone #: ###-#### ok to use metal duct for ext duct
|
BLD-Framing/Rough-in | 1/2/2019 | 1/2/2019 | 1/2/2019 | P | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### Truss repairs.....OK above deck....OK to cover when trades approved in that area.
|
BLD-Framing/Rough-in | 12/12/2018 | 12/13/2018 | 12/13/2018 | A | DONE |
Jim Sly
|
|
|
Charles Phone #: ###-#### Consultation.........
|
BLD-Wall Bracing | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | DONE |
Jim Sly
|
|
|
Charles Phone #: ###-#### Walk thru ......appears OK.......pending special insp. approval.
|
OVERRIDE | | | 10/30/2018 | | |
|
|
|
|
BLD-Conference | 10/29/2018 | 10/29/2018 | 10/30/2018 | P | DONE |
Jim Sly
|
|
|
Charles Phone #: ###-####
|
Plan assigned to (CJW) | 10/23/2018 | 10/23/2018 | 10/30/2018 | | PASS |
Carl Westfall
|
|
|
Plan mod - Olive Grove - routed
|
Plan Reviewer's activity | | | 10/30/2018 | | PASS |
|
|
|
Reviewed and approved the plan modification
|
Permit Ready to Issue | | | 10/30/2018 | | DONE |
|
|
|
PLAN MOD
|
CHANGE STATUS TO (ISS) | | | 10/30/2018 | | DONE |
|
|
|
plan mod
|
Routing - MECHANICAL | 10/25/2018 | | 10/29/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/25/2018 | | 10/25/2018 | | PASS |
Carl Westfall
|
|
|
|
Plan Modification Accepted | | | 10/23/2018 | | DONE |
|
|
|
Removal of heat reovery exhaust system add continual exhaust system
|
BLD-Conference | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | DONE |
Jim Sly
|
|
|
Charles Phone #: ###-#### Inspection of.....Footings for columns, foam insulation at wall, vapor barrier, thickened slab.....all OK.
|
BLD-Foundation | 8/24/2018 | 8/27/2018 | 8/27/2018 | A | PASS |
Dave Hannah
|
|
|
Charles Phone #: ###-####
|
BLD-Footing | 8/23/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Jim Sly
|
|
|
|
BLD-Foundation | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | CANC |
Jim Sly
|
|
|
Chuck Phone #: ###-####
|
BLD-Conference | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | DONE |
Jim Sly
|
|
|
Charles Phone #: ###-####
|
BLD-Conference | 8/15/2018 | 8/15/2018 | 8/16/2018 | P | DONE |
Jim Sly
|
|
|
Chuck Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/7/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/7/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 7/18/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 4/13/2018 | 4/13/2018 | 7/18/2018 | | PASS |
Carl Westfall
|
|
|
(3rd done) 05/17/18 (new - 25 days) (ePlan - 39 sheets) Olive Grove II Apartments
|
Routing - PLAN CHECK | 7/17/2018 | | 7/18/2018 | | PASS |
Carl Westfall
|
|
|
Routing completed
|
Routing - Design Review | 7/17/2018 | | 7/18/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00590
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2018 | | DONE |
|
|
|
need
RP - met
GC - met
Rev Cert of Val - met
MET
ACHD
|
Routing PW Drainage | 7/17/2018 | | 7/17/2018 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 7/17/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/2/2018 | | DONE |
|
|
|
PW drainage and Design Review failed
|
Routing Off Site - STRUCTURAL | 6/21/2018 | | 6/28/2018 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - PLAN CHECK | 6/20/2018 | | 6/21/2018 | | PASS |
Carl Westfall
|
|
|
Pending approval by structural (upload the plan review report)
|
Routing - Design Review | 6/21/2018 | | 6/21/2018 | | FAIL |
Katelyn Menuge
|
|
|
Changes required to site and landscape plan.
|
Routing PW Drainage | 6/21/2018 | | 6/21/2018 | | FAIL |
Brian Murphy
|
|
|
NEED REVISED APPROVED PLAN
|
Plan resubmittals received | | | 6/20/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/23/2018 | 5/26/2018 | 5/29/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/23/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/23/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/13/2018 | | 5/23/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - PLANNING | 5/17/2018 | | 5/17/2018 | | PASS |
Susan Riggs
|
|
|
|
Routing - FIRE | 4/13/2018 | 4/13/2018 | 5/16/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Drainage | 5/15/2018 | | 5/15/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 4/13/2018 | | 4/27/2018 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - Erosion and Sediment | 4/13/2018 | | 4/25/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified Responsible Person for project must be identified prior to issuance. Site preparation inspection is required.
|
Routing - MECHANICAL | 4/13/2018 | | 4/24/2018 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 4/13/2018 | | 4/19/2018 | | FAIL |
Brian Murphy
|
|
|
ROOF DRAINGE APDENDX J
|
Routing PW Solid Waste | 4/13/2018 | | 4/19/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Street Lights | 4/13/2018 | | 4/16/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - Addressing | 4/13/2018 | | 4/16/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/13/2018 | | 4/13/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 4/13/2018 | | 4/13/2018 | | PASS |
Daryl Spivey
|
|
|
Install DCVA on water service lines and per plan and ISPC.
|
Routing - Design Review | 4/13/2018 | | 4/13/2018 | | FAIL |
Katelyn Menuge
|
|
|
drh17-00590 See site and landscape plans.
|
Routing PW Sewer Design | 4/13/2018 | | 4/13/2018 | | PASS |
DeAnn Brown
|
|
|
|
Intake Approval | | | 4/13/2018 | | PASS |
|
|
|
|
Intake Approval | | | 3/30/2018 | | FAIL |
Julie Romig
|
|
|
1. Soils and geotech report - indicated on checklist but not provided.
2. Verification of Legal Lot or Parcel form signed by PDS Subdivision staff. Contact Todd Tucker at TTucker@cityofboise.org.
3. Form 310 Statement of Special Inspections completed and signed by engineer for special inspections (indicated on S-000).
4. Site Drainage report - indicated on checklist but not provided.
5. Drainage System Operation and Maintenance plan - indicated on checklist but not provided.
6. Erosion & Sediment Control narrative - indicated on checklist but not provided.
7. ESC Plan - indicated on checklist but not provided.
8. Upload each drawing sheet as an individual sheet file named per the City of Boise naming convention with sheet number and brief description (ex. A1.1_Site Plan). All drawings have been deleted so they can be uploaded again with proper names and as individual sheets.
9. Envelope ComCheck is for a different project. For buildings up to 3 stories, use REScheck - Multifamily with 2015 IECC using Boise, Idaho as the location.
|
Application received | | | 3/28/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2018 3:02PM
|
First Notice | | 7/12/2019 | | | |
|
|
|
|