Letter of compliance/Occupancy | | | 7/17/2019 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 7/17/2019 | | DONE |
|
|
|
Per passing Building Final inspection on 7/2/19 by David H
|
BLD-Final | 6/29/2019 | 7/2/2019 | 7/5/2019 | A | PASS |
Dave Hannah
|
|
|
Please call me prior to inspection. I''ll meet you onsite and hand over the missing SI report needed for final inspection and permit closure. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
|
Zoning Approval | 7/3/2019 | 7/3/2019 | 7/3/2019 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | FAIL |
Jim Storey
|
|
|
As requested, I''ll bring the SI final acceptance letter with me to hand over during inspection. Phone #: ###-#### Inspection requested via web by Brandon McCurdy Brandon McCurdy mail box full// not on site// singage not in place// zoning not signed off
|
BLD-Final | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | NR |
Jim Storey
|
|
|
SI report emailed on 1/24/19. Request permit to be finaled. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
|
BLD-Final | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | NR |
Jim Storey
|
|
|
Request building final and permit to be closed out. Phone #: ###-#### Inspection requested via web by Brandon McCurdy need si report.
|
FIRE-Final Inspection | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, no fire alarm modifications. Final life fire safety inspection for scope of work complete.Dale Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|
Expiration Notice | 9/12/2018 | 10/3/2018 | 9/12/2018 | | DONE |
Brittany Hill
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/12/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/25/2018 | 4/25/2018 | 6/18/2018 | | PASS |
Carl Westfall
|
|
|
* (3rd done) (May 15 - 15 days) (14 sheets) Fidelity Building Awinings L-3
|
Routing - PLAN CHECK | 6/14/2018 | | 6/18/2018 | | PASS |
Carl Westfall
|
|
|
Structural approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/18/2018 | | DONE |
Christina Prado
|
|
|
Need
GC Form - met
Revised Cert of Value - met
Email permits to brandon@ekcconstruction.com
|
Routing Off Site - STRUCTURAL | 6/14/2018 | | 6/14/2018 | | PASS |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing Off Site - STRUCTURAL | 6/6/2018 | | 6/14/2018 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Plan resubmittals requested | | | 6/14/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/14/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/5/2018 | | 6/6/2018 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Plan resubmittals received | | | 6/5/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 6/4/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/31/2018 | | 6/4/2018 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley) Since new drawings and structural calculations need to be uploaded, the workflow went back to the applicant. The Structural review was suspended until additional drawings and documents are uploaded.
|
Routing - Design Review | 5/31/2018 | | 6/1/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING | 5/31/2018 | | 6/1/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - PLAN CHECK | 5/30/2018 | | 5/31/2018 | | PEND |
Carl Westfall
|
|
|
Pass pending structural
|
Plan resubmittals received | | | 5/30/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 5/19/2018 | 5/22/2018 | 5/21/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 5/19/2018 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 5/19/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/25/2018 | | 5/19/2018 | | FAIL |
Carl Westfall
|
|
|
More information required
|
Routing - FIRE | 4/25/2018 | 4/25/2018 | 5/15/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing Off Site - STRUCTURAL | 4/25/2018 | | 5/7/2018 | | FAIL |
Carl Westfall
|
|
|
Jan Welch (Stapley)
|
Routing - PUBLIC WORKS | 4/25/2018 | | 4/25/2018 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Drainage | 4/25/2018 | | 4/25/2018 | | PASS |
Brian Murphy
|
|
|
ACHD/CCDC AREA
|
Routing - PLANNING | 4/25/2018 | | 4/25/2018 | | FAIL |
Nicolette Womack
|
|
|
See DR comments.
|
Intake Approval | | | 4/25/2018 | | PASS |
|
|
|
|
Routing - Design Review | 4/25/2018 | | 4/25/2018 | | FAIL |
Andrea Tuning
|
|
|
Obtain written approval from CCDC allowing the sidewalk café and the awnings to extend into the CCDC owned parcel known as 8th Street.
|
Plan Reviewer's activity | | | 4/21/2018 | | PASS |
Carl Westfall
|
|
|
Plan intake review approved
|
Intake Approval | | | 4/11/2018 | | FAIL |
|
|
|
(4-11-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
|
Application received | | | 4/10/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 10 2018 11:59AM
|
BLD-Final | 12/13/2018 | 12/14/2018 | | P | |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|