Print Statement | | | 8/19/2019 | | DONE |
|
|
|
|
Second Notice | | 6/17/2019 | 8/13/2019 | | DONE |
|
|
|
mailed 8-13
|
First Notice | | 5/11/2019 | 6/7/2019 | | DONE |
|
|
|
mailed 6-10
|
Print Occupancy Form | | | 5/1/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/1/2019 | | DONE |
|
|
|
|
BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Dave Hannah
|
|
|
Call before you head to project. I am working in Nampa and will take at least 20 minutes to get downtown. Call me after lunch Phone #: ###-#### Inspection requested via web by Tom Hayes
|
FIRE-Final Inspection | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Jim Page
|
|
|
Associated inspections for FIR permits attached to this project have been completed to include approval of as-builts. Final life fire safety inspection for area of work complete.
|
BLD-Final | 4/4/2019 | 4/4/2019 | 4/5/2019 | P | NR |
Dave Hannah
|
|
|
call ahead // Tom Phone #: ###-#### needs other trades to go perm occ
|
BLD-Final | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Dave Hannah
|
|
|
Temp C of O only. Plans still in review for plan review // Tom Phone #: ###-#### ok for tec
|
Temporary Occupancy | 3/7/2019 | 6/5/2019 | 3/7/2019 | | DONE |
Gemma Flores
|
|
|
|
Plan assigned to (CDM) | 2/22/2019 | 2/22/2019 | 3/7/2019 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 3/7/2019 | | DONE |
|
|
|
plan mod please do not re issue
need cert of val for plan mod
|
CHANGE STATUS TO (ISS) | | | 3/7/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/5/2019 | | 3/7/2019 | | PASS |
Carl D Madsen
|
|
|
|
FIRE-Final Inspection | 3/6/2019 | 3/7/2019 | 3/6/2019 | A | PART |
Jim Page
|
|
|
Final inspection for life fire safety inspection complete, TCO authorized for 30 days per conversation with Ron Johnson with the contingent of the fire alarm and fire sprinkler as-builts being submitted and approved. Once FIR permit as-builts are submitted, approved and the inspection status is finaled then life fire safety can be scheduled and completed.
temp Phone #: ###-####
|
Routing - MECHANICAL | 3/5/2019 | | 3/6/2019 | | PASS |
Chad Schwendiman
|
|
|
HVAC plan mod
|
BLD-Final | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | NR |
Brandon Shaw
|
|
|
See previous entry. Permit shows being under review at time of this request, no inspection was performed. Fire alarms and fire sprinkler did not pass inspection.
|
FIRE-Final Inspection | 2/28/2019 | 3/1/2019 | 3/1/2019 | A | FAIL |
Jim Page
|
|
|
Permit shows being under review at time of this request, no inspection was performed. Fire alarms and fire sprinkler did not pass inspection. Tom Phone #: ###-####
|
Plan Modification Accepted | | | 2/22/2019 | | DONE |
|
|
|
Plan mod started in e plan-changing ductwork, relocating HVAC and 2 added fire/smoke dampers to ductwork to allow for HVAC units to be placed in areas with higher clearances-Sheets M102 & M103-assigned to Carl M
|
BLD-Ceiling Grid Inspection | 1/30/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Dave Hannah
|
|
|
Grids on 2nd and 5th floors Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Ceiling Grid Inspection | 1/23/2019 | 1/24/2019 | 1/24/2019 | A | FAIL |
Jim Storey
|
|
|
Grid inspection, 5th and 2nd floors Phone #: ###-#### Inspection requested via web by Tom Hayes fire stop stair and elavator penatrations/ patch fire prooffing 5 floor// support mains with in 6 inches of ends of mains.
|
BLD-Ceiling Grid Inspection | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | PASS |
Dave Hannah
|
|
|
4th floor ceiling grid Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Ceiling Grid Inspection | 1/2/2019 | 1/3/2019 | 1/3/2019 | A | PASS |
Dave Hannah
|
|
|
3rd floor grid inspection for boarder install Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Ceiling Grid Inspection | 12/26/2018 | 12/27/2018 | 12/27/2018 | A | NR |
Dave Hannah
|
|
|
above ceiling for ceiling tile cover inspections Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Wall cover | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Dave Hannah
|
|
|
Fire caulking at elevator door fronts before cover for 2 hour wall assembly Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Wall cover | 10/9/2018 | 10/10/2018 | 10/10/2018 | A | PASS |
Dave Hannah
|
|
|
Wall cover for 2nd and 5th floors Phone #: ###-#### Inspection requested via web by Tom Hayes
|
BLD-Framing/Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Dave Hannah
|
|
|
Wall framing-- interior walls 2nd floor thru 4th floor afternoon is fine, meeting in the morning and won''t be available thanks Tom Phone #: ###-#### Inspection requested via web by Tom Hayes
|
Print Occupancy Form | | | 8/3/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2018 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2018 | | DONE |
|
|
|
called left message on phone (?) Shoemaker that the permit is ready and how much is ower
|
Permit Ready to Issue | | | 7/12/2018 | | DONE |
|
|
|
all met
Need:
ACHD-met
GC form-Met
Revised value from GC-Met
|
Plan assigned to (CDM) | 5/23/2018 | 5/23/2018 | 7/11/2018 | | PASS |
Carl D Madsen
|
|
|
Kount L-3 Due due 6/15
|
Routing - PLAN CHECK | 7/11/2018 | | 7/11/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/29/2018 | | 7/4/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 6/16/2018 | 6/19/2018 | 6/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 6/16/2018 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 5/23/2018 | | 6/16/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 5/23/2018 | | 6/16/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 5/23/2018 | 5/23/2018 | 6/11/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Environmental | 5/23/2018 | | 6/7/2018 | | PASS |
Rick Christenson
|
|
|
Per plumbing notes.
|
Routing - MECHANICAL | 5/23/2018 | | 5/29/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 5/23/2018 | | 5/24/2018 | | PASS |
Bill VanDegrift
|
|
|
SEE REDLINES
|
Routing - Addressing | 5/23/2018 | | 5/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 5/23/2018 | | 5/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 5/23/2018 | | PASS |
|
|
|
|
Intake Approval | | | 5/18/2018 | | FAIL |
Michael Hanson
|
|
|
This permit has failed prescreen due to the following:
1. Missing completed and signed 518 checklist.
|
Application received | | | 5/17/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 17 2018 2:14PM
|