Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-01831
StatusIssued
Name ESI
Site Address 502 W FRONT ST
Project NameHomes 2 Suites Foundation
Customer NumberGRD18-00041
ePlanReviewYes
Description
(FRONT STREET DEVELOPMENT – CONCRETE PODIUM AND GARAGE SUPERSTRUCTURE PHASE) (DRH17-00530) The public open parking garage will have a fire sprinkler system and will be separated from the hotel by a 2-hr fire barrier wall. The 138 unit hotel will be constructed under a separate permit and will also have a fire sprinkler system. Site grading was done under permit GRD18-00041. To construct the concrete garage superstructure phase of a multi-phase project. This building will be 7 stories tall and will have 7 levels of parking. The total floor area of the garage portion of this building is about 222,217 square feet (45,151 square feet on the 1st story, 45,151 square feet for the floor between the 1st story and the 2nd story, 30,076 square feet floor of the 3rd story, 30,076 square feet floor of the 4th story, 30,076 square feet floor of the 5th story, 30,076 square feet floor of the 6th story, and 11,611 square feet floor of the 7th story/upper occupied roof). The garage will have a total of at least 541 parking spaces (includes at least 2 van accessible parking spaces and at least 9 car accessible parking spaces). Work is to include concrete footings, concrete foundations, concrete elevator pits, concrete foundation for a construction crane, under slab utilities, concrete slab on grade, 2-hr concrete columns, 2-hr concrete shear and bearing walls, 2-hr post-tensioned concrete beams, 2-hr concrete floor and vehicle ramp between the 1st and 2nd stories, 2-hr walls to create a complete separation between the 1st story and the 2nd story at the ramp, 2-hr post-tensioned concrete floors/vehicle ramps, 2-hr concrete pour strips, 2-hr stairway enclosures, 2-hr fire barrier walls, 2-hr elevator shafts, interior masonry walls, fire door frames, vehicle and occupant cable guards, and a storm water vault. The stairways, elevators, generator yard, generator, fire stopping, fire sprinkler system, fire alarm, electric lighting including emergency lighting, fire doors, etc. will be completed under the future hotel phase. Special Inspection is required for soils, concrete (including prestressing tendons), steel (including welding), masonry, and anchors post-installed in hardened concrete or masonry. This permit is not intended to establish a Certificate of Occupancy for any portion of this building. A separate permit is required for the swimming pool. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/5/20206/5/20206/5/2020APASS
DetailsDave Hannah
Conference with Forte on Elevator lobby shafts and cover first floor Linen shaft. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Wall cover5/28/20205/28/20205/28/2020PCANC
DetailsJim Storey
Pool area cover/ 5th floor Fire assembly/fire caulking Phone #: ###-#### >> Inspection requested via web by Mike Beeson Inspection cancelled from web by: Adam Johnson
BLD-Wall cover5/18/20205/19/20205/19/2020APASS
DetailsDave Hannah
Third floor Framing, Front Street. Recap and Review EJ for plumbing assemblies. Possibly review shafts at other areas if complete. Call Adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in5/15/20205/18/20205/18/2020PDEFR
DetailsJim Storey
Third floor Framing, Front Street. Recap and Review EJ for plumbing assemblies. Possibly review shafts at other areas if complete. Call Adam when heading to site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/4/20203/4/20203/4/2020PDONE
DetailsBrandon Shaw
Walk with Dave, Adam and Mike B, follow up to exit signage requirements of parking garage structure. Requesting for later in afternoon, Call adam when heading to site. AKJ ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in3/4/20203/4/20203/4/2020APART
DetailsBrandon Shaw
Conformation of roofing structural framing pre TPO installation. Want to walk L7 roof
BLD-Conference2/24/20202/25/20202/25/2020PDONE
DetailsDave Hannah
Meet to pre-walk parking garage. Discuss TCO items, overall general items as we progress to final walks. Call Adam In advance. ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Conference2/24/20202/25/20202/25/2020PDONE
DetailsJim Page
Fire conference complete.

Meet to pre-walk parking garage. Discuss TCO items, overall general items as we progress to final walks. Call Adam In advance. ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference1/30/20202/3/20202/3/2020ADONE
DetailsDave Hannah
Call Adam when heading to site. Meet to review Garage TCO Plan. Need to look at NW stair tower Egress. Thanks. AKJ ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in1/18/20201/21/20201/21/2020ADONE
DetailsDave Hannah
2 hour floor to ceiling assembly mock up, for review. Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Conference1/9/20201/9/20201/9/2020PDONE
DetailsDave Hannah
adam Phone #: ###-####
BLD-Framing/Rough-in11/26/201911/26/201911/26/2019PPART
DetailsDave Hannah
mock up rm ok
BLD-Conference11/26/201911/26/201911/26/2019ADONE
DetailsDave Hannah
Want to review a few assemblies with Dave Hannah, please call Mike Beeson, ###-####. need to look at stair handrail and gap at curtianwall assembly. Call mike when on site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in11/19/201911/20/201911/20/2019ACANC
DetailsDave Hannah
Framing walk with Forte. Call adam when heading to site. ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference11/7/201911/8/201911/8/2019ADONE
DetailsDave Hannah
Meet to review UL Listing for hotel ceiling assembly as discussed on Thursday.
AKJ Call adam when heading to site. ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Wall cover11/6/201911/7/201911/7/2019APASS
DetailsDave Hannah
Unit Mock Up permission to cover mock up, Room 223. Call Adam when heading to the site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Energy code compliance11/6/201911/7/201911/7/2019APASS
DetailsDave Hannah
Unit Mock Up energy Inspection, Room 223. Call Adam when heading to the site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/29/201910/30/201910/30/2019APEND
DetailsDave Hannah
Framing on level 1 Phone #: ###-#### Inspection requested via web by Mike Beeson
BLD-Other10/8/201910/9/201910/9/2019APASS
DetailsDave Hannah
Look at firestop caulk joints, CMU to Concrete in Parking Garage, L2 Demising walls with Mike B. and Adam J.. Call Adam when heading to site. AKJ 100819 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/8/201910/9/201910/9/2019APASS
DetailsDave Hannah
Weekly inspection walk with Mike B. and Adam J.. Call Adam when heading to site. AKJ 100819 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in9/30/20199/30/201910/1/2019PPASS
DetailsDave Hannah
Level 2 framing inspection, SOMD for L 3 ready to place Wednesday. Call Adam when heading to the site. ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/26/20199/27/20199/27/2019ACANC
DetailsTony Young
Job walk on Home 2, L2 with Forte and ESI. Call Adam when heading to site. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/13/20199/16/20199/16/2019APASS
DetailsDave Hannah
Check in on status, Discuss upcoming scope of work. Call Adam when heading to the site. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/13/20199/13/20199/13/2019PCANC
DetailsDave Hannah
Call Adam when heading to site. Meet at field office to discuss upcoming inspection needs. akj ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Aging Inspection7/26/20197/26/20197/26/2019 PASS
DetailsDave Hannah
work in progress
BLD-Conference7/15/20197/16/20197/17/2019APASS
DetailsDave Hannah
Podium Deck, Level 2, area 2, pre placement walk for fire-stop assemblies. Call Adam when heading to site. ###-####.

Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/18/20196/18/20196/24/2019PDONE
DetailsDave Hannah
Walk first round of PT Deck with Adam and Mike. Call adam cell, ###-#### before heading to site.

Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/26/20193/27/20193/27/2019ADONE
DetailsDave Hannah
Meet with Adam and Mike to discuss project status, review future fire assembly design in field office. Call Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Footing3/12/20193/13/20193/14/2019PPASS
DetailsDave Hannah
Inspection Request with Dave Hannah. Meet at ESI Field Office, 610 W. Front Street. Call Adam when heading to site. ###-#### Phone #: ###-#### Inspection requested via web by Adam Johnson
Issue PAID IN FULL permit  2/5/2019 DONE
Inspection Record Card- Bld  2/5/2019 DONE
Extend Review Timeline  11/15/2018 DONE
1st Approved 180 day extension per Adele. See documents
Meeting  11/6/2018 DONE
Sent in request for extension
Expiration Notice10/23/201811/14/201810/23/2018 DONE
DetailsBrittany Hill
OVERRIDE  10/5/2018  
Plan assigned to (CJW)6/16/20186/16/201810/5/2018 PASS
DetailsCarl Westfall
(3rd done) 07/17/18 (new - 25 days) (ePlan - 106 sheets) Front Street development
PLANS/APPL TAKEN TO FRONT DESK  10/5/2018 DONE
Permit Ready to Issue  10/5/2018 DONE
KOREYHALL@ESICONSTRUCTION.COM

MET
NEED
RP
GC Form
REVISED VALUE
Routing - Design Review10/2/2018 10/3/2018 PASS
DetailsKatelyn Menuge
DRH17-00530
Routing - PLAN CHECK10/1/2018 10/2/2018 PASS
DetailsCarl Westfall
Routed drawings
Routing PW Street Lights10/2/2018 10/2/2018 PASS
DetailsTom Marshall
Plan resubmittals received  10/1/2018 DONE
Routing Off Site - STRUCTURAL9/5/2018 9/18/2018 PASS
DetailsCarl Westfall
Jared Bauider (CH2M Hill)
Plan resubmittals requested  9/18/2018 DONE
Routing - FIRE9/5/2018 9/10/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - PLUMBING9/5/2018 9/10/2018 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing PW Sewer Design9/5/2018 9/7/2018 PASS
DetailsDeAnn Brown
Routing - Design Review9/5/2018 9/7/2018 FAIL
DetailsKatelyn Menuge
See changemarks regarding pocket park. An approved lighting and photometric plan for the overall site shall be submitted prior to sign-off on any building permits.
Routing PW Street Lights9/5/2018 9/5/2018 FAIL
DetailsEvan Carpenter
Part numbers and drawing number need to be added to the drawing.
Routing - PLAN CHECK9/4/2018 9/5/2018 PASS
DetailsCarl Westfall
Pending approval by structural
Plan resubmittals received  9/4/2018 DONE
Routing - PLAN CHECK8/29/2018 8/31/2018 FAIL
DetailsCarl Westfall
Failed the plan intake for the 2nd review. Additional drawings need to be uploaded. Routed the workflow back to the applicant.
Plan resubmittals received  8/29/2018 DONE
Route to Impact Fee Review7/31/20188/3/20188/1/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan resubmittals requested  7/31/2018 DONE
Routing - FIRE6/18/20186/18/20187/30/2018 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
1st review completed  7/30/2018 DONE
Routing - PLAN CHECK6/18/2018 7/27/2018 FAIL
DetailsCarl Westfall
1st review completed
Routing Off Site - STRUCTURAL6/18/2018 7/10/2018 FAIL
DetailsCarl Westfall
Jared Bauider (CH2M Hill)
Routing - PLUMBING6/18/2018 6/26/2018 FAIL
DetailsBill VanDegrift
complete GRD18-00041 review prior to approval of this phase
Routing - Design Review6/18/2018 6/20/2018 FAIL
DetailsKatelyn Menuge
DRH17-00530 A copy of a signed and recorded ITD License Agreement is required for building over the property line along Front Street. The applicant shall submit a proposal for finishing of the exposed concrete to be reviewed and approved.
Routing PW Drainage6/18/2018 6/19/2018 PASS
DetailsBrian Murphy
Routing PW Street Lights6/18/2018 6/18/2018 FAIL
DetailsTom Marshall
Routing PW Sewer Design6/18/2018 6/18/2018 FAIL
DetailsDeAnn Brown
Revise utility and site plan per the changemarks in eplanreview. Changemarks are copied from GRD18-00041.
Routing PW Solid Waste6/18/2018 6/18/2018 PASS
DetailsEvan Carpenter
Routing PW Environmental6/18/2018 6/18/2018 PASS
DetailsTerry Alber
Connect ALL kitchen drains to Grease Interceptor, including dishwasher drain.
Routing - PLANNING6/18/2018 6/18/2018 PASS
DetailsBrent Moore
SUB18-00022
Routing - Addressing6/18/2018 6/18/2018 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/18/2018 6/18/2018 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment6/18/2018 6/18/2018 PASS
DetailsMichael Zawacki
Site prep inspection required, would like to do walk through with RP prior to construction activities.
Plans ACCEPTED BY PLAN TECH  6/13/2018 DONE
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/13/2018 DONE
DetailsChristina Prado
Plan Reviewer's activity  6/13/2018 DONE
Plan intake review approved per direction from Jason Blais, Building Official.
Intake Approval  6/13/2018 PASS
Intake Approval  5/31/2018 FAIL
(5-31-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
Intake Approval  5/26/2018 FAIL
(5-26-18) Please refer to the circled items in the plan intake checklist. Please resolve each item as directed. CJW
Application received  5/23/2018 DONE
Application submitted via PDS Online on May 23 2018 10:11AM