Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-02396
StatusFinaled
Name BEDSOLE CUSTOM HOMES INC
Site Address 381 W PASO FINO DR
Project NameGwin addition
Customer Number 
ePlanReviewNo
Description
WUI - Hillside - Permit to add 900sq' to the upper level. New space enlarges a Family Room & two Bedrooms, adds two Bedrooms, adds two Bathrooms, and converts an existing Bath to a Powder. Work involves enlarged footings in the crawl and shear work on the main level. There is a deck shown on the plans that is not a part of this project. All work per plans, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/4/20199/5/20199/5/2019APASS
DetailsTony Young
Hi Tony. Requesting a final as we discussed earlier. If you do need to come out I will need to reschedule, but just let me know. Thank you! Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
DOC - Permit Finaled9/5/20199/5/20199/5/2019PPASS
DetailsTony Young
Routing Walk-In (BLD)8/14/20198/14/20198/14/2019PPASS
DetailsJosh Bogle
BLD-Final7/14/20197/15/20197/15/2019APEND
DetailsDave Hannah
Please give me 30 minutes or so notice so I can meet you there.
Thanks.

Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole ok for final after final letter for cable gaurd rail.
BLD-Aging Inspection5/1/20195/1/20195/6/2019 PEND
DetailsTony Young
BLD-Aging Inspection4/30/20194/30/20195/6/2019 PEND
DetailsTony Young
BLD-Other4/18/20194/19/20194/19/2019APASS
DetailsBrandon Shaw
Inspection of Sheet rock in soffit prior to installing fire rated cedar. If this inspection is not needed, please just let me know. Phone #: ###-#### Inspection requested via web by Jay Bedsole
BLD-Framing/Rough-in12/17/201812/17/201812/17/2018PPASS
DetailsDave Hannah
We are working on it today, please make this last of the day if possible. Upstairs will be done by noon with garage in the afternoon. Thanks Tony. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
BLD-Wall Bracing12/13/201812/14/201812/14/2018PPASS
DetailsTony Young
Please call Steve at ###-#### with a little notice so that he can meet you on the job for the inspection. He should be there all day anyway. I''d like for you to look at the upstairs for framing rough in as well if possible. Thank you Tony. Jay Phone #: ###-#### Inspection requested via web by Jay Bedsole
BLD-Conference11/30/201812/4/201812/4/2018APART
DetailsTony Young
Jay Phone #: ###-####,, new contractor taking over job,, walk through,, I recommended having the structural engineer walk the job to verify and/or give fixes of any issues
Meeting  11/30/2018 DONE
Brown Building Co LLC no longer going to be the GC on project
(F) Reprint permit  11/30/2018 DONE
Routing - MECHANICAL8/31/2018 8/31/2018 PASS
DetailsTroy James
Manual j
BLD-Foundation7/11/20187/11/20187/11/2018PPART
DetailsTony Young
Matt Phone #: ###-####,, new added to existing point load footings on front,, 5 total
Issue PAID IN FULL permit  7/9/2018 DONE
Plan assigned to (JAB) Josh7/5/20187/5/20187/6/2018 PASS
DetailsJosh Bogle
Routing - PLAN CHECK7/6/2018 7/6/2018 PASS
DetailsJosh Bogle
1st review completed  7/6/2018 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  7/6/2018 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/6/2018 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/6/2018 DONE
DetailsJosh Bogle
Telephone call  7/6/2018 DONE
Called Matt to advise permit is ready and gave fees due
Permit Ready to Issue  7/6/2018 DONE
All requirements met
Routing Walk-In (BLD)7/5/20187/5/20187/5/2018PPASS
DetailsJosh Bogle
took in as a level two
Routing Walk-In (Zoning)7/5/20187/5/20187/5/2018PPASS
DetailsSue Cummings
Application received 7/5/2018