BLD-Final | 5/16/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Dave Hannah
|
|
|
Call ahead // Jon Phone #: ###-####
|
FIRE-Final Inspection | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Mark Scharfen
|
|
|
South stair exit light needs battery, extinguishers on site but not hung. Signed off-vanilla finish. Will be installed by end of day.
Call ahead // Jon Phone #: ###-####
|
Letter of compliance/Occupancy | | | 5/17/2019 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 5/17/2019 | | DONE |
|
|
|
final passed 5/17/19 permit is not for occupancy, TI only
|
BLD-Framing/Rough-in | 4/25/2019 | 4/25/2019 | 4/26/2019 | P | PASS |
Dave Hannah
|
|
|
call for access- John Phone #: ###-####
|
Place hold on job | 4/18/2019 | | 4/24/2019 | | DONE |
Brittany Hill
|
|
|
need revised value from GC sine the Architect stated value went up do to the modifications being done.
|
CHANGE STATUS TO (ISS) | | | 4/24/2019 | | DONE |
|
|
|
plan mod
|
Telephone call | | | 4/18/2019 | | DONE |
|
|
|
Sent John and Brandon(EKC) email informing we need another revised value sheet from the GC. see email in documents
|
BLD-Framing/Rough-in | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | PART |
Jim Storey
|
|
|
Jon Phone #: ###-#### struc. floor south mez ok to deck/ si reports pending.
|
Plan assigned to (JG) | 3/19/2019 | 3/19/2019 | 4/5/2019 | | PASS |
Javier Guzman
|
|
|
plan Mod (Hoff Build) Vanilla - Suite #1400
|
Routing - PLAN CHECK | 4/4/2019 | | 4/5/2019 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 4/5/2019 | | DONE |
|
|
|
met PLAN MOD
NEED REVISED VALUE FOR PLAN MOD FROM GC (Architect stated value went up due to plan mod)
PLAN MOD
|
BLD-Framing/Rough-in | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
Dave Hannah
|
|
|
Jon-box beam header Phone #: ###-####
|
Plan Modification Accepted | | | 3/19/2019 | | DONE |
|
|
|
plan mod accepted in e plan-changing the mechanical room and mechanical-submitting sheet A2-14-assigned to JG
|
CHANGE STATUS TO (ISS) | | | 3/13/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JG) | 1/29/2019 | 1/29/2019 | 3/12/2019 | | PASS |
Javier Guzman
|
|
|
Plan Mod Telic International ePlan
|
Routing - PLAN CHECK | 3/1/2019 | | 3/12/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 3/1/2019 | | 3/12/2019 | | PASS |
Javier Guzman
|
|
|
Signed off in ePlan by AHJ Engineers Chris Holladay
|
Permit Ready to Issue | | | 3/12/2019 | | DONE |
|
|
|
plan mod
MET
-please do not re issue-we need the cert if val for the plan mod
|
BLD-Other | 2/25/2019 | 3/4/2019 | 3/4/2019 | A | DONE |
Dave Hannah
|
|
|
Status? work is in progress
|
BLD-Conference | 2/21/2019 | 2/21/2019 | 2/21/2019 | P | DONE |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
Routing - PLAN CHECK | 1/29/2019 | | 2/6/2019 | | FAIL |
Javier Guzman
|
|
|
|
Plan assigned to (JG) | 1/25/2019 | 1/25/2019 | 1/25/2019 | | DONE |
Brittany Hill
|
|
|
|
Plan Modification Accepted | | | 1/25/2019 | | |
|
|
|
Eliminate stamped tin metal ceiling and replace with 2'x2' acoustical tile with metal suspension system. Install new conference room walls and door at S-E corner of space. Extend loft level flooring over top of new conference room. The new floor structural design will be a deferred submittal and will match the framing that will be used at the new floor above the existin south stairway
|
Issue PAID IN FULL permit | | | 1/14/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/14/2019 | | DONE |
|
|
|
|
Meeting | | | 1/10/2019 | | DONE |
|
|
|
John Price sent in extension request 1/10/19
|
Telephone call | | | 1/9/2019 | | DONE |
|
|
|
spoke with John informing him that this permit is going to expire in 5 days. stated he sent an email to adele, asked him to go ahead and forward to me so that I can make note
|
Expiration Notice | 12/27/2018 | 1/18/2019 | 12/27/2018 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JG) | 12/4/2018 | 12/4/2018 | 12/14/2018 | | PASS |
Javier Guzman
|
|
|
Plan Mod Telic International TI ePlan
|
Routing - PLAN CHECK | 12/8/2018 | | 12/14/2018 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 12/14/2018 | | DONE |
|
|
|
all met-Need
GC Form-met
Revised Cert of Value-met
|
Routing - MECHANICAL | 12/8/2018 | | 12/11/2018 | | PASS |
Troy James
|
|
|
field verify mechanical work
|
Plan Modification Accepted | | | 12/4/2018 | | DONE |
|
|
|
RESUBMITTALS PERMIT HAS NEVER BEEN ISSUED
Eliminate lay-in acoustical tile ceiling. Install new stamped tin ceiling and lighit-gauge framing system
|
Plan assigned to (JG) | 7/24/2018 | 7/24/2018 | 8/7/2018 | | PASS |
Javier Guzman
|
|
|
7/30 L1 Telic International ePlan** pend Arch response
|
Routing - PLAN CHECK | 8/7/2018 | | 8/7/2018 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/7/2018 | | DONE |
|
|
|
Need
GC Form
Revised Cert of Value
|
Route to Impact Fee Review | 7/26/2018 | 7/29/2018 | 7/27/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 7/24/2018 | | 7/26/2018 | | FAIL |
Javier Guzman
|
|
|
pending email from arch regarding the missing structural plan sheets and the 310 form
|
1st review completed | | | 7/26/2018 | | DONE |
Javier Guzman
|
|
|
|
Intake Approval | | | 7/24/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 7/18/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2018 4:43PM
|
BLD-Conference | 11/30/2018 | 12/4/2018 | | A | |
Dave Hannah
|
|
|
Status? work completed? Permit not issued.
|