BLD-Aging Inspection | 5/7/2020 | 5/7/2020 | 5/14/2020 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/6/2020 | 5/6/2020 | 5/7/2020 | | PEND |
Tony Young
|
|
|
|
Routing Walk-In (BLD) | 3/13/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Josh Bogle
|
|
|
disdussed a possible plan modification
|
Meeting | | | 3/13/2020 | | DONE |
|
|
|
Permit Transfer from Levco to Keith Breon who will be the GC from now on. Parcel Owner now GC see email in docs
|
Telephone call | | | 3/10/2020 | | DONE |
|
|
|
Spoke with Parcel Owner: Keith. Will be ending working relationship with Levco Builders. Need letter, 302 form (exemption) , and to primary as RP on ESC permit. Will come in for a Plan Modification as a door was added that was not originally on the approved plans.
|
BLD-Footing | 12/20/2019 | 12/23/2019 | 12/24/2019 | A | PASS |
Dave Hannah
|
|
|
Pablo Phone #: ###-#### walls ok
|
BLD-Footing | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, north side tier footing on window well,, work in progress,, ok
|
BLD-Foundation | 12/6/2019 | 12/6/2019 | 12/6/2019 | P | PART |
Tony Young
|
|
|
rebar // Scott Phone #: ###-#### or Nick ###-#### (on site),, work in progress on 3 window well walls
|
BLD-Footing | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | PART |
Tony Young
|
|
|
rebar- Gabe Phone #: ###-####,, window well footings,, work in progress
|
BLD-Energy code compliance | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Tell Riley
|
|
|
JOSH Phone #: ###-####
|
BLD-Framing/Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####,, ok to insulate
|
BLD-Wall Bracing | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PASS |
Tony Young
|
|
|
shear // Josh Phone #: ###-####
|
BLD-Other | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | PART |
Tony Young
|
|
|
culking // Josh Phone #: ###-####,, seal package ok
|
BLD-Wall Bracing | 10/4/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 10/4/2019 | | DONE |
|
|
|
Per Brandon S, didnt mean to final permit yet.
|
BLD-Framing/Rough-in | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Brandon Shaw
|
|
|
Josh Phone #: ###-####
|
DOC - Permit Finaled | 9/4/2019 | 9/4/2019 | 9/4/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Foundation | 6/26/2019 | 6/28/2019 | 6/28/2019 | A | PART |
Tony Young
|
|
|
Jack Phone #: ###-####,, porch walls ok,, work in progress, ok
|
BLD-Footing | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Front porch...
|
BLD-Foundation | 6/21/2019 | 6/24/2019 | 6/24/2019 | A | PASS |
Tony Young
|
|
|
Chet Phone #: ###-####
|
BLD-Foundation | 6/20/2019 | 6/21/2019 | 6/21/2019 | P | PART |
Tony Young
|
|
|
Chet Phone #: ###-####,, work in progress,, monolithic basement walls,, ICF
|
OVERRIDE | | | 6/17/2019 | | |
|
|
|
|
Routing Walk-In (BLD) | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 6/17/2019 | 6/17/2019 | 6/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/17/2019 | | 6/17/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/17/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 6/17/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 6/17/2019 | | DONE |
|
|
|
Changing the floorplan/foundain
|
Routing Walk-In (BLD) | 6/14/2019 | 6/14/2019 | 6/14/2019 | P | FAIL |
Josh Bogle
|
|
|
moving to ICF foundation - lacked information
|
BLD-Aging Inspection | 4/26/2019 | 4/26/2019 | 4/30/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/25/2019 | 4/25/2019 | 4/30/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Foundation | 12/11/2018 | 12/12/2018 | 12/12/2018 | A | PASS |
Tony Young
|
|
|
Gali Phone #: ###-####,, stairwell walls
|
BLD-Footing | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PART |
Tony Young
|
|
|
Jorge Phone #: ###-####,, stairwell /retaining wall footing ok,, will pour and tent and heat,, work in progress
|
BLD-Conference | 11/13/2018 | 11/15/2018 | 11/15/2018 | P | PART |
Tony Young
|
|
|
early as poss in PM // call when on way to meet // Josh Mitchell Phone #: ###-####,, exterior stair ?s,, retaining wall ?s,, need to follow engineering
|
OVERRIDE | | | 9/18/2018 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 8/2/2018 | 8/2/2018 | 9/18/2018 | | PASS |
Josh Bogle
|
|
|
08/06 basement addition, paper- 1st done, see e-mail 8/6
|
Routing - PLAN CHECK | 9/18/2018 | | 9/18/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 9/18/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 9/18/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/18/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 9/18/2018 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/18/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/14/2018 | | 9/14/2018 | | FAIL |
Josh Bogle
|
|
|
see e-mail - 9/14/18
|
Plan resubmittals received | | | 9/11/2018 | | DONE |
|
|
|
Received one copy of retaining wall calculations, foam insulation specs, and foundation detail on 11x17; taken to Josh B.
|
Plan resubmittals received | | | 8/31/2018 | | DONE |
|
|
|
One copy of Forte Report (3 pages) and one copy of full new set of plans pages 1 to 8. Taken to Josh
|
Routing - PLAN CHECK | 8/6/2018 | | 8/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 8/6/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Josh Bogle
|
|
|
took in as level 2 (lobby busy)
|
Application received | | 7/31/2018 | | | |
|
|
|
|