Second Notice | | 4/18/2019 | 5/1/2019 | | DONE |
|
|
|
This permit finaled on the web by Tara Perry
|
First Notice | | 4/6/2019 | 4/8/2019 | | DONE |
|
|
|
mailed 4-11-19
|
Permanent Occupancy | | | 3/27/2019 | | DONE |
|
|
|
|
BLD-Final | 2/13/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
Jim Storey
|
|
|
Rob Phone #: ###-####
|
FIRE-Final Inspection | 2/13/2019 | 2/14/2019 | 2/14/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete. In duct detectors are going to be removed during next remodel.
Rob Phone #: ###-####
|
BLD-Final | 2/12/2019 | 2/13/2019 | 2/13/2019 | P | CANC |
Jim Storey
|
|
|
Call for lock box // Rob Phone #: ###-####
|
FIRE-Final Inspection | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide a fire exitinguisher as discussed with current inspection tag
Call for lock box combo // Rob Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/30/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Jim Storey
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Jim Storey
|
|
|
Rob Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/17/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/17/2018 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 8/21/2018 | 8/21/2018 | 8/23/2018 | | DONE |
Joe Bruce
|
|
|
1st rev comp 08/23 L1 US BANK ePlan
|
1st review completed | | | 8/23/2018 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/23/2018 | | DONE |
|
|
|
email permit to robertt@radixconstruction.com
Need
GC Form-met
Revised Cert of Value-met
|
Routing - PLAN CHECK | 8/21/2018 | | 8/23/2018 | | PASS |
Joe Bruce
|
|
|
|
Plan assigned to (JG) | 8/21/2018 | 8/21/2018 | 8/21/2018 | | DEFR |
Javier Guzman
|
|
|
8/23 L1 US BANK ePlan
|
Routing - MECHANICAL | 8/21/2018 | | 8/21/2018 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 8/21/2018 | | 8/21/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 8/21/2018 | | 8/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/17/2018 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/10/2018 | | FAIL |
Brian McGowan
|
|
|
Please resolve the following corrections:
1. Plans are not stamped and signed by the Architect.
2. Missing Wall Schedule and ceiling attachment detail.
|
Application received | | | 8/8/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2018 11:53AM
|