First Notice | | 11/10/2018 | 11/16/2018 | | DONE |
|
|
|
This permit finaled on the web by Brian McCoy
|
Permanent Occupancy | | | 10/31/2018 | | DONE |
|
|
|
|
BLD-Final | 10/29/2018 | 10/30/2018 | 10/30/2018 | A | PASS |
Jim Storey
|
|
|
Please call 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
FIRE-Final Inspection | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, smoke detector is stand-alone and not monitored, fire exitnguisher is placed with current inspection tag. Final life fire safety inspection for area of work complete.
Please call 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
FIRE-Final Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | CANC |
Jim Page
|
|
|
Please call 30 mons a head of time so I can meet you there. Phone #: ###-#### >> Inspection requested via web by Gerome Fries Inspection cancelled from web by: Gerome Fries
|
FIRE-Conference | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete, occupant load is below 49, exit signs are not required.
Walk the job to check for egress lighting needs. Please call 30 mins ahead of time so I can meet you here. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
BLD-Framing/Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Storey
|
|
|
Please call 30 mins ahead of time so I can meet you there please. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
BLD-Framing/Rough-in | 10/2/2018 | 10/2/2018 | 10/2/2018 | P | PASS |
Jim Storey
|
|
|
Please call 30 mins ahead of time so I can meet you there please. Phone #: ###-#### Inspection requested via web by Gerome Fries
|
Issue PAID IN FULL permit | | | 9/13/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/12/2018 | | DONE |
|
|
|
emailed Shy Travor the fees due after he emailed the 302 & 306 forms to us
|
Plan assigned to (JHB) | 8/23/2018 | 8/23/2018 | 9/10/2018 | | PASS |
Joe Bruce
|
|
|
09/10 (L2) - Idaho Physixal Medicine ePlan
|
Routing - PLAN CHECK | 8/23/2018 | | 9/10/2018 | | PASS |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 8/23/2018 | | 9/10/2018 | | PASS |
Joe Bruce
|
|
|
Sturcutral approval per ePlanReview.
|
1st review completed | | | 9/10/2018 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/10/2018 | | DONE |
|
|
|
all met-NEED:
GC FORM-met
REVISED CERT OF VALUE-met
|
Routing - Addressing | 8/23/2018 | | 8/23/2018 | | PASS |
Doug Chausow
|
|
|
Suite 120
|
Routing - PUBLIC WORKS | 8/23/2018 | | 8/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/22/2018 | | FAIL |
Brian McGowan
|
|
|
1. Please provide the submittal checklist as required so a prescreen review can be started.
2. Three of the four drawings are marked Preliminary and are not stamped and signed.
3. Please provide the required drawings.
|
Intake Approval | | | 8/22/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 8/20/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 20 2018 11:14AM
|