First Notice | | 3/3/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12
|
Permanent Occupancy | | | 2/21/2019 | | DONE |
|
|
|
|
BLD-Final | 2/11/2019 | 2/13/2019 | 2/13/2019 | A | PASS |
Mike Jordan
|
|
|
Call 15 minutes ahead // Jeff Phone #: ###-####. OK for perm occ. Exterior buildings have been removed.
|
FIRE-Final Inspection | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Previous corrections made. Per notes Troy James verified dust collection. The racks have been removed and there is no paint booth within the scope of work.
Call 15 minutes ahead // Jeff Phone #: ###-####
|
Inspection Record Card- Bld | | | 2/11/2019 | | |
|
|
|
|
Routing - PLAN CHECK | 1/3/2019 | | 1/4/2019 | | PASS |
Joe Bruce
|
|
|
|
Permit Ready to Issue | | | 1/4/2019 | | DONE |
|
|
|
Plan Mod Approved (fees due)
DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 1/4/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (JHB) | 12/19/2018 | | 1/4/2019 | | PASS |
Joe Bruce
|
|
|
*(Plan Mod Comp) 12/28 - Golden Oaks Plan Modification
|
Plan resubmittals received | | | 1/2/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 12/27/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/26/2018 | | 12/27/2018 | | FAIL |
Joe Bruce
|
|
|
Emailed architect additional information required for shed on west side of building. **JHB**
|
Routing - FIRE | 12/21/2018 | 12/24/2018 | 12/24/2018 | | PASS |
Erika Akin
|
|
|
Plan mod to demo lean to's and address existing lean to that remains on west side. A fire sprinkler permit will be required for compliance.
|
Plan Modification Accepted | | | 12/19/2018 | | DONE |
|
|
|
Existing Building was updated to meet code and inspector comments.
|
BLD-Conference | 12/6/2018 | 12/7/2018 | 12/7/2018 | A | DONE |
Mike Jordan
|
|
|
Brad Phone #: ###-####.. Due to change in use the ADA restrooms are required to be upgraded. Needs to pull building permits for the shelters on the west side of the exisitng building and resolve all fire/life/safety issues and electrical issues.
|
BLD-Final | 12/4/2018 | 12/7/2018 | 12/7/2018 | A | CANC |
Mike Jordan
|
|
|
Brad Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2018 | 12/6/2018 | 12/6/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide revised floor plan showing the actual wall layout and that door 106 is not there , provide exit signs/emergency lights as per the plans and review comments or get revised plans, remove dead bolt from west side door and provide single action hardware for the restroom door, provide fire sprinkler coverage for the lean too's/sheds that are attatched to the building, provide racking permit for the storage racks that exceed 8'
Brad Phone #: ###-####
|
Routing - FIRE | 11/28/2018 | 11/28/2018 | 12/4/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (JHB) | 9/5/2018 | 9/5/2018 | 12/4/2018 | | PASS |
Joe Bruce
|
|
|
*(3rd Rev Comp) 09/27 (L3) Golden Oaks Design L-3 (Fire, Mech)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/4/2018 | | DONE |
|
|
|
MET
Need
ACHD
GC Form
Revised Cert of Value
|
Issue PAID IN FULL permit | | | 12/4/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/4/2018 | | DONE |
|
|
|
|
Routing - MECHANICAL | 11/28/2018 | | 11/28/2018 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 11/28/2018 | | DONE |
Joe Bruce
|
|
|
Troy James performed a site visit on 11/27/18 and verified dust collection system for each tool. **JHB**
|
Routing - MECHANICAL | 11/7/2018 | | 11/7/2018 | | FAIL |
Troy James
|
|
|
Onsite meeting with owner and architect on the 27th of Nov.
|
Plan resubmittals requested | | | 11/2/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - FIRE | 10/19/2018 | 10/19/2018 | 11/1/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - MECHANICAL | 10/30/2018 | | 10/31/2018 | | FAIL |
Troy James
|
|
|
Dust Collection System for cabinet/millwork shop. **JHB**
|
Routing - PLAN CHECK | 10/19/2018 | | 10/24/2018 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 10/19/2018 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 10/15/2018 | | DONE |
Joe Bruce
|
|
|
Emailed Plan Review Reports to architect. **JHB**
|
Routing - PLAN CHECK | 10/3/2018 | | 10/15/2018 | | FAIL |
Joe Bruce
|
|
|
|
Routing - FIRE | 10/3/2018 | 10/3/2018 | 10/11/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PUBLIC WORKS | 10/11/2018 | | 10/11/2018 | | PASS |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 10/3/2018 | | DONE |
Joe Bruce
|
|
|
Added required plumbing fixtures. **JHB**
|
Route to Impact Fee Review | 10/1/2018 | 10/4/2018 | 10/1/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 10/1/2018 | | FAIL |
Joe Bruce
|
|
|
Failed: Fire and Plan Check.
|
Plan resubmittals requested | | | 10/1/2018 | | DONE |
Joe Bruce
|
|
|
Plan Review Report sent to architect on 9/27. Spoke on the phone with architect about comments on 9/28.
|
Routing - FIRE | 9/5/2018 | 9/5/2018 | 9/28/2018 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLAN CHECK | 9/5/2018 | | 9/27/2018 | | FAIL |
Joe Bruce
|
|
|
Emailed architect plan review report on 9/27. **JHB**
|
Routing - PLANNING | 9/5/2018 | | 9/6/2018 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 9/5/2018 | | 9/6/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 9/5/2018 | | 9/6/2018 | | PASS |
Rachael Beierle
|
|
|
ON SPETIC. NO ROUTING TO RWC PER B_M.
|
Intake Approval | | | 8/31/2018 | | FAIL |
Joe Bruce
|
|
|
Spoke with architect on phone in regards to application. The application that was turned in noted a change to the occupancy from an S-1 to B. The tenant is listed as Golden Oaks Design, but no reference to what type of operations would take place in the building. **JHB**
1) Resubmit plans that describe the use of each space by the tenant (i.e. furniture manufacturing, storage, office, etc...)
2) Note any new work or demolition of existing walls on the plans.
3) If occupancy group is "B" - confirm that the use is allowed by Chapter 11 - Zoning Ordinance.
|
Intake Approval | | | 8/31/2018 | | PASS |
|
|
|
|
Application received | | | 8/29/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 29 2018 1:23PM
|