BLD-Other | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | PASS |
Mike Jordan
|
|
|
please verify the tenant has moved out-this is only a temp c of o
|
DOC - Permit Finaled | 5/1/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Mike Jordan
|
|
|
Tenant has vacated and space is currently unoccupied.
|
BLD-Final | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PART |
Mike Jordan
|
|
|
Jonny Phone #: ###-####. All issues resolved. Ok for temp occ. Will occupy space for less than 180 days. ( I signed wrong side of card, sorry)
|
FIRE-Final Inspection | 11/1/2018 | 11/1/2018 | 11/1/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Smoke evac tested.
Jonny Phone #: ###-####
|
Temporary Occupancy | 11/1/2018 | 1/30/2019 | 11/1/2018 | | DONE |
Tisha Gallop
|
|
|
temp occ approved to April 30, 2019
|
BLD-Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Mike Jordan
|
|
|
Jonny-please call to meet Phone #: ###-####. Provide ADA hardware on main doors.
|
FIRE-Final Inspection | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the fire extinguisher in the stockroom, provide verification the existing racking in the stockroom does not require a racking permit as discussed, repair and provide testing for the exit lights and emergency lights, provide testing of the smoke evac system as discussed.
Jonny-please call to meet Phone #: ###-####
|
Plan assigned to (BJM) | 10/24/2018 | 10/24/2018 | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/24/2018 | | 10/30/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/30/2018 | | DONE |
|
|
|
met
|
Print Occupancy Form | | | 10/30/2018 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2018 | | DONE |
|
|
|
Spoke with Jonny to inform him the permit is ready to pick up.
|
Issue PAID IN FULL permit | | | 10/30/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/24/2018 | | PASS |
|
|
|
per BJM
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2018 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/24/2018 | | DONE |
|
|
|
|
First Notice | 5/1/2019 | 5/1/2019 | | | |
Mike Jordan
|
|
|
|
First Notice | | 11/11/2018 | | | |
|
|
|
|
Application received | | 10/24/2018 | | | |
|
|
|
|