Third Notice | | 4/20/2019 | 5/6/2019 | | DONE |
|
|
|
mailed 5-10-19
|
Second Notice | | 3/21/2019 | 4/15/2019 | | DONE |
|
|
|
mailed 4-16-19
|
First Notice | | 2/23/2019 | 3/11/2019 | | DONE |
|
|
|
mailed 3-12
|
Permanent Occupancy | | | 2/13/2019 | | DONE |
|
|
|
|
BLD-Final | 2/11/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Dave Hannah
|
|
|
Mccrea Phone #: ###-####
|
FIRE-Final Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
|
CHANGE STATUS TO (ISS) | | | 2/11/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/11/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 2/1/2019 | 2/1/2019 | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
02/08 (Plan MOD) Tango Card, ePlan
|
Routing - PLAN CHECK | 2/6/2019 | | 2/8/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2019 | | DONE |
|
|
|
plan mod please do not re iss
|
Intake Approval | | | 2/1/2019 | | FAIL |
Joe Bruce
|
|
|
Plan Modfication prescreen: Provide room name/description on the plans for the room that remains under this plan modification.
|
Plan Modification Accepted | | | 1/31/2019 | | DONE |
|
|
|
There were two existin walls not shown on the plans. There will be no work to these walls, but they are now shown on the floor plans
|
FIRE-Final Inspection | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | FAIL |
Jim Page
|
|
|
Fire alarms did not pass inspection. Room has been added that is not on the site drawings, site drawings are not stamped, need city approved drawings for life fire safety inpspection.
Russ Phone #: ###-####
|
Telephone call | | | 1/30/2019 | | DONE |
|
|
|
left message for phillip to see was they are doing for plan mod
|
BLD-Wall Bracing | 12/26/2018 | 12/28/2018 | 12/31/2018 | A | PASS |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok to cover restrooms
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Dave Hannah
|
|
|
Russ Phone #: ###-####
|
FIRE-Conference | 12/5/2018 | 12/6/2018 | 12/6/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete.
Russ Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/28/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/28/2018 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 11/8/2018 | 11/8/2018 | 11/23/2018 | | PASS |
Joe Bruce
|
|
|
*(1st Rev Comp) - 11/13 L1 Hoff Building 8 Floor TI (Bldg)
|
Routing - PLAN CHECK | 11/23/2018 | | 11/23/2018 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/23/2018 | | DONE |
|
|
|
all met - NEED
GC
Rev cert of val
|
Plan resubmittals received | | | 11/16/2018 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 11/15/2018 | 11/18/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 11/8/2018 | | 11/15/2018 | | FAIL |
Joe Bruce
|
|
|
|
1st review completed | | | 11/15/2018 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 11/15/2018 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLUMBING | 11/8/2018 | | 11/9/2018 | | PASS |
Dan Ediger
|
|
|
Per plans and ISPC
|
Routing - Addressing | 11/8/2018 | | 11/8/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/8/2018 | | 11/8/2018 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 11/7/2018 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 11/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 2 2018 4:43PM
|