BLD-Aging Inspection | 1/3/2020 | 1/3/2020 | 1/6/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/2/2020 | 1/2/2020 | 1/6/2020 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/20/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Dave Hannah
|
|
|
antonio Phone #: ###-####
|
FIRE-Final Inspection | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items are completed, fire sprinkler inspection complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for scope of work complete.
antonio Phone #: ###-####
|
FIRE-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | A | FAIL |
Jim Page
|
|
|
FIR permit for fire alarms still in issued status, reference FIR19-00089 for fire alarm notes. FIR permit for fire alarm system needs to be finaled before life fire safety can be completed.
Antonio Phone #: ###-####
|
BLD-Wall cover | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | DONE |
Dave Hannah
|
|
|
Anthonio Phone #: ###-####
|
FIRE-Final Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | CANC |
Jim Page
|
|
|
Area of work not ready for life fire safety inspection, treated this as a conference, fire alarm modifications will be required.
Antonio Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/31/2018 | 1/2/2019 | 1/2/2019 | A | PASS |
Dave Hannah
|
|
|
Antonio Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/26/2018 | 12/27/2018 | 12/27/2018 | P | NR |
Dave Hannah
|
|
|
Antonio Phone #: ###-####
|
BLD-Framing/Rough-in | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Dave Hannah
|
|
|
last as possible- please call before coming Antonio Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/21/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/21/2018 | | DONE |
|
|
|
|
Plan assigned to (JAR) | 11/13/2018 | 11/13/2018 | 12/10/2018 | | DONE |
Julie Romig
|
|
|
1st Rev Comp - L2 Axiom Engineering Office
|
Routing - PLAN CHECK | 11/30/2018 | | 12/10/2018 | | PASS |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/10/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/10/2018 | | DONE |
|
|
|
ALL MET-12-19-18 TENANT CAME IN WITH A 302 FILLED OUT BY GC, DID NOT HAVE A NEW 306 FROM THE GC. INFORMED EITHER GC NEEDS TO DO BOTH OR NEED LETTER FROM PARCEL OWNER ALLOWING TENANT TO ACT AS GC AND 302 AND 306 IN DOCUMENTS NOW CAN BE USED. **TOOK OUT FEES UNTIL WE KNOW***
NEED
GC- met
Rev cert of val-met
letter from parcel owner allowing Axiom to act as their own GC
|
Telephone call | | | 12/10/2018 | | DONE |
|
|
|
Called Lee to advise permit is ready pendign GC & Cert of value form
|
Plan resubmittals received | | | 11/30/2018 | | DONE |
|
|
|
Two copies each of review comments letter and A1.01 F stamped and taken to plan reviewer.
|
Route to Impact Fee Review | 11/28/2018 | 12/1/2018 | 11/29/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | | 11/13/2018 | 11/28/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case and plans
|
1st review completed | | | 11/28/2018 | | FAIL |
Julie Romig
|
|
|
|
Routing - PLAN CHECK | 11/13/2018 | | 11/28/2018 | | FAIL |
Julie Romig
|
|
|
IBC Plan Review Report emailed to applicant.
|
Routing - PLUMBING | 11/13/2018 | | 11/15/2018 | | PASS |
Dan Ediger
|
|
|
Per ISPC
|
Routing - Addressing | 11/13/2018 | | 11/13/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/13/2018 | | 11/13/2018 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/13/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/13/2018 | | PASS |
Julie Romig
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/13/2018 | | DONE |
|
|
|
|
Application received | | 11/13/2018 | | | |
|
|
|
|