BLD-Blower Door Test Results | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Tony Young
|
|
|
We decided not to do the decorative awning over the front door. The rest of the corrections have been done. Thank you. Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Final | 9/10/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Tony Young
|
|
|
We decided not to do the decorative awning over the front door. The rest of the corrections have been done. Thank you. Phone #: ###-#### Inspection requested via web by Scott Asin
|
DOC - Permit Finaled | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Tony Young
|
|
|
c of o issued,, awning is removed from the plan per contractor
|
BLD-Blower Door Test Results | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | DONE |
Tell Riley
|
|
|
4.2 ACH 50 1114 cfm @ 50 pa
|
BLD-Final | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin//add pipe bollard//insulate crawl access door//seal penetrations in garage wall//awning over front door is not installed//correction issued//
|
BLD-Framing/Rough-in | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Energy code compliance | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Framing/Rough-in | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, met framer and super on site,, work in progress on wall bracing and frame fixes,, ok to insulate
|
BLD-Framing/Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin,, need wall bracing per plan,, NOTE.. CALL IN PRIOR TO HOUSE WRAP!!,, strap plates, nail king studs to headers/plates,, ok to insulate if needed
|
BLD-Foundation | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PART |
Tony Young
|
|
|
Phone #: ###-####,, work in progress
|
BLD-Footing | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Tony Young
|
|
|
Manny Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/13/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/13/2019 | | DONE |
|
|
|
|
Extend Review Timeline | | | 4/23/2019 | | DONE |
|
|
|
1st Approved 180 day Extension per Adele. See documents
|
Meeting | | | 4/19/2019 | | DONE |
|
|
|
equest for an extension has been sent in-forwarded to Adele
|
Expiration Notice | 4/15/2019 | 5/6/2019 | 4/15/2019 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
OVERRIDE | | | 1/3/2019 | | |
|
|
|
|
Plan assigned to (BJM) | 11/30/2018 | 11/30/2018 | 1/3/2019 | | DONE |
Brian McGowan
|
|
|
11/27 - Corrections Required
|
Routing - PLANNING | 1/3/2019 | | 1/3/2019 | | PASS |
Leon Letson
|
|
|
|
Override - Parcel Holds | | | 1/3/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 1/3/2019 | | DONE |
|
|
|
met
|
OVERRIDE | | | 11/21/2018 | | |
|
|
|
|
Routing - PLANNING | 11/21/2018 | | 11/21/2018 | | FAIL |
Leon Letson
|
|
|
|
CHANGE STATUS TO (REV) | | | 11/21/2018 | | DONE |
|
|
|
need to complete a staff-level modification to their PUD. The elevations are dramatically different than what we approved 11/21/18 per Leon
|
Permit Ready to Issue | | | 11/21/2018 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 11/14/2018 | 11/14/2018 | 11/20/2018 | | DONE |
Brian McGowan
|
|
|
11/27 sfd L1 ePlan
|
Routing - PLAN CHECK | 11/14/2018 | | 11/20/2018 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 11/20/2018 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 11/14/2018 | | 11/16/2018 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 11/14/2018 | 11/17/2018 | 11/15/2018 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 11/14/2018 | | 11/15/2018 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 11/14/2018 | | 11/15/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 11/14/2018 | | 11/15/2018 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 11/14/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 14 2018 3:05PM
|
Plans ACCEPTED BY PLAN TECH | | | 11/14/2018 | | DONE |
|
|
|
|
Intake Approval | | | 11/14/2018 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/14/2018 | | DONE |
|
|
|
|