Permit Information
Permit NumberBLD18-04240
StatusFinaled
Name ANGEL CONSTRUCTION
Site Address 812 W LEMP ST
Project NameLemp Street Addition
Customer Number 
ePlanReviewYes
Description
MODIFICATION - FLOOR PLAN CHANGE - SIZE IS NOW 955sq' 4.9.19 **jab** Permit for a 945sq' addition that includes a Master Suite and a Great room. The Kitchen in the existing home is being reconfigured as part of this project. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/30/20201/31/20201/31/2020APASS
DetailsDave Hannah
Brian Phone #: ###-####
DOC - Permit Finaled1/31/20201/31/20201/31/2020PPASS
DetailsDave Hannah
Letter of compliance/Occupancy  1/31/2020 DONE
Zoning Approval12/18/201912/18/201912/18/2019 DONE
DetailsTed Vanegas
BLD-Aging Inspection11/20/201911/20/201911/22/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/19/201911/19/201911/20/2019 PEND
DetailsTony Young
BLD-Framing/Rough-in7/5/20197/8/20197/8/2019APASS
DetailsBrandon Shaw
Insulation- OK to cover...
BLD-Framing/Rough-in7/1/20197/2/20197/2/2019APASS
DetailsBrandon Shaw
Brian Phone #: ###-####
BLD-Wall Bracing6/26/20196/27/20196/27/2019APASS
DetailsBrandon Shaw
Interior shear panels to be installed before framing rough-in...
Routing - MECHANICAL6/24/2019 6/24/2019 PASS
DetailsTroy James
Resubmitted manual j report
Inspection Record Card- Bld  5/1/2019 DONE
Inspection Record Card- Bld  5/1/2019 DONE
BLD-Foundation4/25/20194/26/20194/26/2019APART
DetailsTony Young
Dustin-stem wall Phone #: ###-####,, work in progress,, missed layout on footings in some areas,, dowelled in and re-pour with wall ok
BLD-Footing4/23/20194/24/20194/24/2019APASS
DetailsDave Hannah
Dustin Phone #: ###-####
CHANGE STATUS TO (ISS)  4/12/2019 DONE
OVERRIDE  4/10/2019  
Permit Ready to Issue  4/10/2019 DONE
plan mod approved
Plan assigned to (JAB) Josh4/5/20194/5/20194/9/2019 PASS
DetailsJosh Bogle
4/11 modification, ePlan - needs updated engineering
Routing - PLAN CHECK4/5/2019 4/9/2019 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  4/9/2019 DONE
DetailsJosh Bogle
one hour Plan Review fee
Routing - MECHANICAL4/5/2019 4/8/2019 PASS
DetailsTroy James
Plan Reviewer's activity  4/5/2019 DONE
DetailsJosh Bogle
pre-reviewed - e-mailed applicant to send me calc pages
Routing - PLANNING4/5/2019 4/5/2019 PASS
DetailsTed Vanegas
Routing Walk-In (BLD)3/29/20193/29/20193/29/2019PPASS
DetailsJosh Bogle
Brian the GC - need plan mod
Plan Modification Accepted  3/29/2019 DONE
Brian the GC came into the office. Foundation was over the setbacks. New plans must be submitted.
Issue PAID IN FULL permit  2/15/2019 DONE
(F) Reprint permit  2/15/2019 DONE
OVERRIDE  12/12/2018  
Plan assigned to (JAB) Josh11/21/201811/21/201812/12/2018 PASS
DetailsJosh Bogle
11/27 addition, ePlan - 1st done
Routing - PLAN CHECK12/12/2018 12/12/2018 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  12/12/2018 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  12/12/2018 DONE
NEED
MET GC

Met
RP (PARCEL OWNER SEE EMAIL IN ESC DOCS)
Routing - PLAN CHECK11/21/2018 11/27/2018 FAIL
DetailsJosh Bogle
1st review completed  11/27/2018 FAIL
DetailsJosh Bogle
Routing - PLANNING11/21/2018 11/26/2018 PASS
DetailsTed Vanegas
Routing - MECHANICAL11/26/2018 11/26/2018 PASS
DetailsTroy James
Plan Reviewer's activity  11/26/2018 DONE
DetailsJosh Bogle
returned to applicant for download of more information, per applicant request - no Plan Review has been done yet
Plans ACCEPTED BY PLAN TECH  11/21/2018 DONE
Intake Approval  11/21/2018 PASS
Recd Pcfee & Taken To Pln CK  11/21/2018 DONE
Application received  11/20/2018 DONE
Application submitted via PDS Online on Nov 20 2018 5:14PM
Application received 4/5/2019   
DetailsJosh Bogle
plan mod accepted in e plan by GF