Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD19-00282
StatusFinaled
Name WATSON JOHN
Site Address 1618 S MICHIGAN AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
***06/20/19 PLAN MODIFICATION TO GARAGE*** Permit for the construction of a new 1155 sq. ft., two story (first story 717 sq. ft., second story 438 sq. ft.) single family dwelling with 2 bedrooms, 2 bathrooms, approximately 63 sq. ft. of covered patio/porch and a 399 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/11/201912/11/201912/11/2019PPASS
DetailsJim Storey
John Phone #: ###-####
DOC - Permit Finaled12/11/201912/11/201912/11/2019PPASS
DetailsJim Storey
BLD-Conference11/8/201911/8/201911/8/2019APASS
DetailsJim Storey
BLD-Energy code compliance11/8/201911/8/201911/8/2019APASS
DetailsJim Storey
c/n on insulation and grade protection at garage ok
BLD-Framing/Rough-in11/8/201911/8/201911/8/2019APASS
DetailsJim Storey
p/l eave at garage ok per planreview only blk at wall ine for protection new code pervision not adopted but allowed as dirceted.
BLD-Framing/Rough-in8/21/20198/22/20198/22/2019AFAIL
DetailsJim Storey
Bret Phone #: ###-#### 3ft side set back eave 1 hr not adressed by aproved plans//
BLD-Wall Bracing8/21/20198/22/20198/22/2019APASS
DetailsJim Storey
Bret Phone #: ###-####
BLD-Footing7/10/20197/11/20197/11/2019APASS
DetailsJim Storey
John Phone #: ###-#### min 24 inches frost depth// fil and grade isues.
CHANGE STATUS TO (ISS)  7/1/2019 DONE
plan mod
OVERRIDE  6/26/2019  
Plan assigned to (RDP)6/20/20196/20/20196/26/2019 DONE
DetailsRob Patrick
plan mod. two car garage to one car garage
Routing - PLAN CHECK6/26/2019 6/26/2019 PASS
DetailsRob Patrick
Permit Ready to Issue  6/26/2019 DONE
Plan Mod Approved
DO NOT RE ISSUE
Telephone call  6/26/2019 DONE
Spoke with John to inform him the plan mod is ready and what fees are due.
Routing - PLANNING6/25/2019 6/25/2019 PASS
DetailsKatelyn Menuge
Plan Modification Accepted  6/24/2019 DONE
resubmitted sheets G1, G2 and G3
Plan Reviewer's activity  6/24/2019  
DetailsRob Patrick
Took both submittal sets to Katelyn's desk.
BLD-Framing/Rough-in6/20/20196/20/20196/20/2019PPASS
DetailsTell Riley
BLD-Energy code compliance6/19/20196/20/20196/20/2019PPART
DetailsJim Storey
John Phone #: ###-#### rim joist at stair need to verify insulation.
Plan Modification Accepted  6/20/2019  
DetailsRob Patrick
two car garage to one. Pages G1, G2 and G3
Routing - PLAN CHECK6/20/2019 6/20/2019 FAIL
DetailsRob Patrick
Failed per Plannings comments.
Routing - PLANNING6/20/2019 6/20/2019 FAIL
DetailsKatelyn Menuge
Need some design changes.
BLD-Framing/Rough-in6/17/20196/17/20196/17/2019PCANC
DetailsTell Riley
John Phone #: ###-####//frame ok per plans.//call for energy inspection.//
BLD-Wall Bracing5/13/20195/14/20195/14/2019APASS
DetailsJim Storey
Brett Phone #: ###-####
Routing Walk-In (BLD)5/14/20195/14/20195/14/2019APASS
DetailsJosh Bogle
discussed Plan Modification process
BLD-Foundation3/7/20193/8/20193/8/2019PPART
DetailsMike Jordan
Eric Phone #: ###-####
BLD-Footing3/6/20193/7/20193/7/2019APASS
DetailsJim Storey
Eric Phone #: ###-####
Issue PAID IN FULL permit  2/28/2019 DONE
OVERRIDE  2/6/2019  
Plan assigned to (RDP)1/30/20191/30/20192/6/2019 DONE
DetailsRob Patrick
02/07 sfd L1 PAPER...2/4 1st Done Failed
Inspection Record Card- Bld  2/6/2019 DONE
Telephone call  2/6/2019 DONE
Spoke with John and let him know his fees are due
Plan resubmittals received  2/6/2019 DONE
Two copies each of ICC-ES Evaluation Report, G2, G3, A101, A102 1st floor plan, A201, S101, S102 ,S103, S104,S105 and ME01 stamped and taken to Rob
Routing - PLAN CHECK2/6/2019 2/6/2019 PASS
DetailsRob Patrick
Case Summary (BLD)  2/6/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  2/6/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  2/6/2019 DONE
met
Routing - PLAN CHECK2/1/2019 2/4/2019 FAIL
DetailsRob Patrick
Corrections Req'd
1st review completed  2/4/2019 FAIL
DetailsRob Patrick
Corrections Required
Routing - MECHANICAL  2/1/2019 PASS
DetailsTroy James
Plan assigned to (BJM)1/25/20191/25/20191/30/2019 DEFR
DetailsBrian McGowan
02/07 sfd L1 paper
Routing - PLANNING  1/29/2019 PASS
Only plans with two-car garage are approved per planning.
Route to Impact Fee Review1/25/20191/28/20191/28/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.

Impact fees assessed at $1,727.10 are correct for the Southeast-Barber Valley area of impact. SLC
Routing - Addressing1/25/2019 1/28/2019 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS  1/28/2019 PASS
Intake Approval  1/25/2019 PASS
Recd Pcfee & Taken To Pln CK  1/25/2019 DONE
Application received 1/25/2019