BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Jim Storey
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Jim Storey
|
|
|
c/n on insulation and grade protection at garage ok
|
BLD-Framing/Rough-in | 11/8/2019 | 11/8/2019 | 11/8/2019 | A | PASS |
Jim Storey
|
|
|
p/l eave at garage ok per planreview only blk at wall ine for protection new code pervision not adopted but allowed as dirceted.
|
BLD-Framing/Rough-in | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | FAIL |
Jim Storey
|
|
|
Bret Phone #: ###-#### 3ft side set back eave 1 hr not adressed by aproved plans//
|
BLD-Wall Bracing | 8/21/2019 | 8/22/2019 | 8/22/2019 | A | PASS |
Jim Storey
|
|
|
Bret Phone #: ###-####
|
BLD-Footing | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### min 24 inches frost depth// fil and grade isues.
|
CHANGE STATUS TO (ISS) | | | 7/1/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 6/26/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/20/2019 | 6/20/2019 | 6/26/2019 | | DONE |
Rob Patrick
|
|
|
plan mod. two car garage to one car garage
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | PASS |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
Plan Mod Approved
DO NOT RE ISSUE
|
Telephone call | | | 6/26/2019 | | DONE |
|
|
|
Spoke with John to inform him the plan mod is ready and what fees are due.
|
Routing - PLANNING | 6/25/2019 | | 6/25/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Plan Modification Accepted | | | 6/24/2019 | | DONE |
|
|
|
resubmitted sheets G1, G2 and G3
|
Plan Reviewer's activity | | | 6/24/2019 | | |
Rob Patrick
|
|
|
Took both submittal sets to Katelyn's desk.
|
BLD-Framing/Rough-in | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 6/19/2019 | 6/20/2019 | 6/20/2019 | P | PART |
Jim Storey
|
|
|
John Phone #: ###-#### rim joist at stair need to verify insulation.
|
Plan Modification Accepted | | | 6/20/2019 | | |
Rob Patrick
|
|
|
two car garage to one. Pages G1, G2 and G3
|
Routing - PLAN CHECK | 6/20/2019 | | 6/20/2019 | | FAIL |
Rob Patrick
|
|
|
Failed per Plannings comments.
|
Routing - PLANNING | 6/20/2019 | | 6/20/2019 | | FAIL |
Katelyn Menuge
|
|
|
Need some design changes.
|
BLD-Framing/Rough-in | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | CANC |
Tell Riley
|
|
|
John Phone #: ###-####//frame ok per plans.//call for energy inspection.//
|
BLD-Wall Bracing | 5/13/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Jim Storey
|
|
|
Brett Phone #: ###-####
|
Routing Walk-In (BLD) | 5/14/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Josh Bogle
|
|
|
discussed Plan Modification process
|
BLD-Foundation | 3/7/2019 | 3/8/2019 | 3/8/2019 | P | PART |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 3/6/2019 | 3/7/2019 | 3/7/2019 | A | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/28/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 2/6/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 1/30/2019 | 1/30/2019 | 2/6/2019 | | DONE |
Rob Patrick
|
|
|
02/07 sfd L1 PAPER...2/4 1st Done Failed
|
Inspection Record Card- Bld | | | 2/6/2019 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2019 | | DONE |
|
|
|
Spoke with John and let him know his fees are due
|
Plan resubmittals received | | | 2/6/2019 | | DONE |
|
|
|
Two copies each of ICC-ES Evaluation Report, G2, G3, A101, A102 1st floor plan, A201, S101, S102 ,S103, S104,S105 and ME01 stamped and taken to Rob
|
Routing - PLAN CHECK | 2/6/2019 | | 2/6/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 2/6/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/6/2019 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 2/1/2019 | | 2/4/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 2/4/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Required
|
Routing - MECHANICAL | | | 2/1/2019 | | PASS |
Troy James
|
|
|
|
Plan assigned to (BJM) | 1/25/2019 | 1/25/2019 | 1/30/2019 | | DEFR |
Brian McGowan
|
|
|
02/07 sfd L1 paper
|
Routing - PLANNING | | | 1/29/2019 | | PASS |
|
|
|
Only plans with two-car garage are approved per planning.
|
Route to Impact Fee Review | 1/25/2019 | 1/28/2019 | 1/28/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
Impact fees assessed at $1,727.10 are correct for the Southeast-Barber Valley area of impact. SLC
|
Routing - Addressing | 1/25/2019 | | 1/28/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 1/28/2019 | | PASS |
|
|
|
|
Intake Approval | | | 1/25/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/25/2019 | | DONE |
|
|
|
|
Application received | | 1/25/2019 | | | |
|
|
|
|