FIRE-Final Inspection | 7/28/2020 | 7/31/2020 | 7/31/2020 | A | CANC |
Jim Page
|
|
|
SCREENED // Ty Phone #: ###-#### cancel per Ty
|
BLD-Final | 7/28/2020 | 7/31/2020 | 7/30/2020 | P | CANC |
Brandon Shaw
|
|
|
SCREENED // Ty Phone #: ###-#### cancel per ty
|
BLD-Final | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | NR |
Brandon Shaw
|
|
|
Pre-final walk thru...
|
Zoning Approval | 7/27/2020 | 7/27/2020 | 7/27/2020 | | PASS |
Katelyn Menuge
|
|
|
|
OVERRIDE | | | 7/20/2020 | | |
|
|
|
|
Plan assigned to (CJW) | 7/14/2020 | 7/14/2020 | 7/20/2020 | | PASS |
Carl Westfall
|
|
|
plan mod - Ace Co (routed to staff)
|
CHANGE STATUS TO (ISS) | | | 7/20/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/20/2020 | | PASS |
|
|
|
5th plan mod review approved
|
Permit Ready to Issue | | | 7/20/2020 | | DONE |
|
|
|
plan mod approved
DO NOT RE ISSUE
|
Routing - PLUMBING | 7/15/2020 | | 7/16/2020 | | PASS |
Daryl Spivey
|
|
|
Plan mod approved
|
Routing - PLAN CHECK | 7/15/2020 | | 7/15/2020 | | PASS |
Carl Westfall
|
|
|
5th plan mod IBC review approved
|
Routing - PLAN CHECK | 7/14/2020 | | 7/14/2020 | | PASS |
Carl Westfall
|
|
|
5th plan mod plan intake review approved
|
Plan Modification Accepted | | | 7/14/2020 | | DONE |
|
|
|
This modification is to identify the reduced pressure back flow preventer at the water service to the building.
|
CHANGE STATUS TO (ISS) | | | 7/8/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 7/7/2020 | | |
|
|
|
|
Permit Ready to Issue | | | 7/7/2020 | | DONE |
|
|
|
4th plan mod approved
DO NOT RE ISSUE
|
Plan assigned to (CJW) | 7/2/2020 | 7/2/2020 | 7/6/2020 | | PASS |
Carl Westfall
|
|
|
plan mod - Ace Co (plan intake approved)
|
Routing - PLAN CHECK | 7/2/2020 | | 7/6/2020 | | PASS |
Carl Westfall
|
|
|
4th plan mod plan intake review approved
|
Routing - PLAN CHECK | 7/6/2020 | | 7/6/2020 | | PASS |
Carl Westfall
|
|
|
4th plan mod review approved
|
Plan Reviewer's activity | | | 7/6/2020 | | PASS |
|
|
|
4th plan mod plan review approved
|
BLD-Conference | 7/2/2020 | 7/2/2020 | 7/2/2020 | P | PART |
Brandon Shaw
|
|
|
Ceiling grid, OK to cover perimeter, need trades approval for all ceiling grid...
|
BLD-Ceiling Grid Inspection | 7/1/2020 | 7/2/2020 | 7/2/2020 | P | CANC |
Brandon Shaw
|
|
|
Herb *screened* Phone #: ###-####
|
Plan Modification Accepted | | | 7/2/2020 | | DONE |
|
|
|
Call out production equipment in manufacturing area as not apart of the building scope of work.
A141, A604, E4.1, E6.0, E7.0, E7.1, E7.2
|
BLD-Ceiling Grid Inspection | 6/25/2020 | 6/29/2020 | 6/29/2020 | P | CANC |
Brandon Shaw
|
|
|
screened // Herb Phone #: ###-####
|
FIRE-Final Inspection | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually for a conferene to go over life safety items. I agreed a fire lane sign could be mounted on the wall at the property entrance. I pointed out the requirement for panic hardware in the path of egress from the Break Room. Break Room would also need Occupant Load sign, need Fire Dept radio verified per notes, need signage on Riser Room and Electrical Rooms doors....ect.
Herb *screened* Phone #: ###-####
|
BLD-Conference | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | CANC |
Tony Young
|
|
|
screened // Herb Phone #: ###-####// wanted a fire conf.
|
CHANGE STATUS TO (ISS) | | | 5/7/2020 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Brandon Shaw
|
|
|
Herb Phone #: ###-####
|
Telephone call | | | 5/6/2020 | | DONE |
|
|
|
Sent email to GC that there are still PWK fees due. Cannot issue the permit until those have been paid.
|
OVERRIDE | | | 5/5/2020 | | |
|
|
|
|
Plan assigned to (CJW) | 4/17/2020 | 4/17/2020 | 5/5/2020 | | PASS |
Carl Westfall
|
|
|
plan mod 3 - AceCo
|
Plan Reviewer's activity | | | 5/5/2020 | | PASS |
|
|
|
Plan mod routing completed and review approved
|
Permit Ready to Issue | | | 5/5/2020 | | DONE |
|
|
|
Plan mod Approved
|
Routing PW Street Lights | 4/24/2020 | | 5/1/2020 | | PASS |
Tom Marshall
|
|
|
|
Plan Reviewer's activity | | | 4/29/2020 | | DONE |
|
|
|
Emailed Jason Taylor inquiring about the status of the PW reviews.
|
Routing PW Drainage | 4/29/2020 | | 4/29/2020 | | PASS |
Jason C. Taylor
|
|
|
|
BLD-Energy code compliance | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PART |
Brandon Shaw
|
|
|
East exterior wall...
|
FIRE-Conference | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | DONE |
Jim Page
|
|
|
Fire conference is complete. Conference was able to be completed by phone. Conference was to question whether a egress double door section could have one leaf made in-active. Instructed Herb to verify occupant load exiting amount to verify if a leaf can be made in-active or if both leafs on the double door need to be operational for egress purposes.
Screened- would prefer conference in person if possible, up to inspectors discretion- Herb Phone #: ###-####
|
Routing - Design Review | 4/22/2020 | | 4/23/2020 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 4/22/2020 | | 4/22/2020 | | PASS |
Carl Westfall
|
|
|
Back from the permits desk
|
Routing - PLUMBING | 4/22/2020 | | 4/22/2020 | | PASS |
Daryl Spivey
|
|
|
Plan mod approved
|
Routing - PLAN CHECK | 4/17/2020 | | 4/20/2020 | | PASS |
Carl Westfall
|
|
|
3rd plan mod plan intake review approved
|
Plan Modification Accepted | | | 4/17/2020 | | DONE |
|
|
|
3rd plan mod requested: The owner has requested an additional overhead door from room 144 - heat treat to the exterior which is reflected on sheets A101, S1.4, S2.2. The inspector has requested overflow rood drains be added and those changes are reflected on sheets A502, and P1.1. A previous plan modification required landscape changes at the east end of the site for an electrical utility screen wall,The attached civil sheets reflect needed changes to accompany that changed work.
|
BLD-Framing/Rough-in | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PART |
Tony Young
|
|
|
Herb Phone #: ###-####,, 2nd floor interior walls ok after bracing tops better, pending trades
|
BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Mike Jordan
|
|
|
Herb Phone #: ###-####. Interior steel stud framed walls only for 1st. floor office area. No grid or hardlids at this time.
|
BLD-Conference | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | DONE |
Brandon Shaw
|
|
|
Pre-framing walk thru...
|
OVERRIDE | | | 3/4/2020 | | |
|
|
|
|
Plan assigned to (CJW) | 2/24/2020 | 2/24/2020 | 3/4/2020 | | PASS |
Carl Westfall
|
|
|
plan mod (AceCo Precision Manufacturing) (routed to staff)
|
CHANGE STATUS TO (ISS) | | | 3/4/2020 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/4/2020 | | PASS |
|
|
|
2nd plan mod review approved
|
Permit Ready to Issue | | | 3/4/2020 | | DONE |
|
|
|
plan mod approved
|
Routing - MECHANICAL | 2/26/2020 | | 2/27/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 2/26/2020 | | 2/27/2020 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
BLD-Wall Bracing | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PART |
Brandon Shaw
|
|
|
Exteroir walls, South and East sides...
|
Routing - PLAN CHECK | 2/25/2020 | | 2/26/2020 | | PASS |
Carl Westfall
|
|
|
Plan mod review approved
|
Routing - PUBLIC WORKS | 2/26/2020 | | 2/26/2020 | | PASS |
Candy A. Nichols
|
|
|
CREDIT FOR DEMO-NO FEES DUE-REFUND ISSUED
|
Routing PW Sewer Rating | 2/26/2020 | | 2/26/2020 | | PASS |
Candy A. Nichols
|
|
|
1 added sink, 1 deleted toilet-CREDIT FOR DEMO-NO FEES DUE-REFUND ISSUED
|
Routing - PLAN CHECK | 2/24/2020 | | 2/25/2020 | | DONE |
Carl Westfall
|
|
|
Plan intake review approved
|
Plan Modification Accepted | | | 2/24/2020 | | DONE |
|
|
|
site plan has been modified to accommodate eletrical service site infrastureure. Two transformers instead of one, will be placed in a parking island on the southern line of parking. The island has been made larger by omitting one parking space to allow both transformers and the landscaping. as identified in the partial site plan, the design for the line of parking facing the street has moved 6' to allow for sufficient space for a pad mounted IPCO meter and a box mounted switch that sites on a vault. the switch and meter are to be screened by CMU block wall that will provide adequate clearance for service and utilities: landscaping and associated site work such as drainage will be adjusted to the new design
|
BLD-Framing/Rough-in | 2/12/2020 | 2/12/2020 | 2/12/2020 | P | PART |
Brandon Shaw
|
|
|
OK to cover parapet walls, at roof line and up only... OK to cover wall at grid line G, one side only...
|
BLD-Framing/Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Brandon Shaw
|
|
|
East entry and North walls, OK to cover exterior only...
|
CHANGE STATUS TO (ISS) | | | 1/14/2020 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 1/9/2020 | | |
|
|
|
|
Plan assigned to (CJW) | 12/20/2019 | 12/20/2019 | 1/9/2020 | | PASS |
Carl Westfall
|
|
|
plan mod - Ace Co (routed to staff)
|
Plan Reviewer's activity | | | 1/9/2020 | | PASS |
|
|
|
The Plan Mod was approved
|
Permit Ready to Issue | | | 1/9/2020 | | DONE |
|
|
|
plan mod approved (fees due)DO NOT RE ISSUE
|
Routing PW Street Lights | | | 1/6/2020 | | PASS |
|
|
|
|
Routing PW Drainage | | | 12/24/2019 | | PASS |
|
|
|
|
Routing - Design Review | | | 12/24/2019 | | PASS |
|
|
|
Redlined landscape plan.
|
Routing - PLAN CHECK | 12/21/2019 | | 12/23/2019 | | PASS |
Carl Westfall
|
|
|
Plan mod plan intake review approved. Plan mod review approved.
|
Plan Modification Accepted | | | 12/21/2019 | | DONE |
|
|
|
Workflow in ePlanReview received
|
Plan Modification Accepted | | | 12/20/2019 | | DONE |
|
|
|
Plan mod
|
BLD-Conference | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | DONE |
Brandon Shaw
|
|
|
Herb Phone #: ###-####
|
BLD-Concrete | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Brandon Shaw
|
|
|
SOG pour 2am. Special inspection performed by Geotek for rebar and concrete strength test. Ok after spec inspection sign offs...
|
BLD-Concrete | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Pour SOG 8” floor from grid lines 14-3 and H-E. Special inspection done by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Pour 1:30 pm for footings on grid line c.3. Special inspection done by Geotek. Ok after spec inspection sign offs...
|
BLD-Concrete | 8/30/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Brandon Shaw
|
|
|
Rebar and concrete inspection on building finish floor pending special inspection by Geotek. Ok after spec inspection sign offs...
|
BLD-Concrete | 8/30/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Rebar and concrete inspection on com room lower slab, pending special inspection by Geotek. Ok after spec inspection sign offs...
|
BLD-Concrete | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Building pad pour Tuesday 2am. Grids 17-3 and J-H. Special inspection for rebar and concrete done by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 8/20/2019 | 8/21/2019 | 8/21/2019 | A | PASS |
Brandon Shaw
|
|
|
Rebar inspection on footing and stem wall along grids A and B.1 from 1-17. Special inspection performed by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 8/13/2019 | 8/14/2019 | 8/14/2019 | A | CANC |
Brandon Shaw
|
|
|
Footing pour grid A from 1-9. Walls on grid 1 from H-D. Special inspection done by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 8/7/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Brandon Shaw
|
|
|
Inspection of rebar In footings. Special inspection done by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 8/7/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Brandon Shaw
|
|
|
Inspection of rebar In footings. Special inspection done by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Brandon Shaw
|
|
|
Inspection of rebar In footings. Special inspection done by Geotek. Ok after spec inspection sign offs...
|
BLD-Footing | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Brandon Shaw
|
|
|
Inspection of rebar In footings. Special inspection done... Ok after spec inspection sign offs...
|
BLD-Footing | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PEND |
Brandon Shaw
|
|
|
Footing pour grid line I from 8-2 including elevator pit. Special inspection Ok after spec inspection sign offs...
|
BLD-Footing | 7/29/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Brandon Shaw
|
|
|
Pouring footing pads along grid line H from 13-1. Special inspection for rebar done by Geotek. Phone #: ###-#### Inspection requested via web by Jason Allen
|
BLD-Footing | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Footing pour grid 5 to1 to H. Special inspection by Geotek in AM. Phone #: ###-#### Inspection requested via web by Jason Allen
|
BLD-Foundation | 7/24/2019 | 7/26/2019 | 7/25/2019 | A | PART |
Brandon Shaw
|
|
|
Concrete foundation walls being poured 7am Friday July 26. Pending special inspection by Geotek. Phone #: ###-#### Inspection requested via web by Jason Allen
|
BLD-Footing | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress... Pending special inspection...
|
BLD-Footing | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PART |
Brandon Shaw
|
|
|
Pending special inspection... Grid line 15- 17...
|
Print Occupancy Form | | | 6/18/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/18/2019 | | DONE |
|
|
|
|
Meeting | | | 6/14/2019 | | DONE |
|
|
|
emailed over our fees to joseph pellatt and informed him we still need ACHD. see email in documents
|
OVERRIDE | | | 6/11/2019 | | |
|
|
|
|
Routing - FIRE | 6/6/2019 | 6/6/2019 | 6/11/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (CJW) | 2/7/2019 | 2/11/2019 | 6/11/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 03/13/19 (new - 25 days) (eplan - 185 sheets) Ace Co (routed to staff)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/11/2019 | | DONE |
|
|
|
MET jpellatt@k2cm.com
NEED
ACHD
GC FORM
REVISED VALUE
|
Routing PW Street Lights | 6/6/2019 | | 6/7/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 6/6/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/6/2019 | | 6/6/2019 | | PASS |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 6/5/2019 | | DONE |
|
|
|
|
Routing - FIRE | 5/21/2019 | 5/21/2019 | 6/4/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLAN CHECK | 5/20/2019 | | 5/29/2019 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 5/21/2019 | | 5/28/2019 | | PASS |
Carl Westfall
|
|
|
Sidney Gold (KPFF)
|
Routing PW Drainage | 5/21/2019 | | 5/24/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 5/21/2019 | | 5/22/2019 | | FAIL |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 5/20/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 3/22/2019 | 3/25/2019 | 3/26/2019 | | PASS |
Karina Myles
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 3/22/2019 | | DONE |
|
|
|
|
Routing - FIRE | 2/7/2019 | 2/11/2019 | 3/21/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
1st review completed | | | 3/21/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/7/2019 | | 3/19/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing Off Site - STRUCTURAL | 2/11/2019 | | 2/27/2019 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Sidney Gold (KPFF)
|
Routing PW Drainage | 2/11/2019 | | 2/26/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 2/11/2019 | | 2/20/2019 | | PASS |
Terry Alber
|
|
|
No pretreatment issues. Flammable interceptor in place.
|
Routing - MECHANICAL | 2/11/2019 | | 2/14/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Street Lights | 2/11/2019 | | 2/13/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 2/11/2019 | | 2/11/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing PW Solid Waste | 2/11/2019 | | 2/11/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLUMBING | 2/11/2019 | | 2/11/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 2/11/2019 | | 2/11/2019 | | PASS |
David Moser
|
|
|
SEE DRH18-00313
|
Routing - Addressing | 2/11/2019 | | 2/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 2/11/2019 | | 2/11/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 2/11/2019 | | 2/11/2019 | | PASS |
Andy J. Long
|
|
|
SWPPP approved, certified stormwater team designated.
|
Routing - Design Review | 2/11/2019 | | 2/11/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH18-00313
|
Intake Approval | | | 2/7/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved M_H.
|
Intake Approval | | | 2/6/2019 | | FAIL |
Michael Hanson
|
|
|
Coversheet of #310 form must be completed in all fields and signed and dated by owner and stamped, signed and dated by engineer.
Revise an d resubmit with the exact same file name so that it versions over the original.
|
Application received | | | 2/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2019 3:58PM
|