Permit Information
Permit NumberBLD19-00363
StatusIssued
Name K2 CONSTRUCTION
Site Address 924 W MCGREGOR CT
Project NameAceCo Precision Manufacturing
Customer Number 
ePlanReviewYes
Description
(ACE CO PRECISION MANUFACTURING COMPANY, INC. – NEW OFFICE, MANUFACTURING, AND STORAGE BUILDING) (DRH18-00313) (7-20-20 PLAN MODIFICATION TO CHANGE THE BACK FLOW PREVENTION DEVICE FROM A DOUBLE CHECK VALVE ASSEMBLY TO A REDUCED PRESSURE ZONE ASSEMBLY AT THE WATER SERVICE TO THE BUILDING.) (7-6-20 PLAN MODIFICATION TO IDENTIFY PRODUCTION EQUIPMENT WITHIN THE MANUFACTURING AREA OF THIS BUILDING AS BEING FUTURE, ETC.) (5-5-20 PLAN MODIFICATION TO INSTALL AN ADDITIONAL 10 FEET X 10 FEET OVERHEAD DOOR IN THE WEST EXTERIOR WALL TO SERVE “HEAT TREAT 144”. WORK INCLUDES A NEW STRUCTURAL TUBE STEEL HEADER AND A NEW TYPE OF SHEAR WALL WITH FIRE-RETARDANT-TREATED STRUCTURAL PANELS AND HOLD DOWNS. ETC.) (3-4-20 PLAN MODIFICATION TO CONSTRUCT ADDITIONAL OFFICES WITHIN FORMERLY OPEN OFFICE AREAS ON THE 1ST AND 2ND STORIES AND TO CONSTRUCT A SINGLE-USER TOILET ROOM ACCESSIBLE TO THE DISABLED. THE NEW TOILET ROOM WILL BE LOCATED ON THE 1ST STORY BETWEEN THE MULTI-USER MEN’S TOILET ROOM AND THE MULTI-USER WOMEN’S TOILET ROOM WHICH HAVE DIRECT ACCESS FROM THE MANUFACTURING/WAREHOUSE AREA. ETC.) (1-9-20 PLAN MODIFICATION TO PROVIDE TWO ELECTRICAL TRANSFORMERS INSTEAD OF ONE AS ORIGINALLY PROPOSED. ONE PARKING SPACE WILL BE OMITTED TO PROVIDE A LARGER AREA TO ACCOMMODATE THE TRANSFORMERS AND THE LANDSCAPING. ETC.) The fire sprinkler system is used for fire area, building area increase, and for fire flow. To construct a new 94,031 square foot building (about 78,475 square feet lower level and about 15,556 square feet upper level) for a new office, manufacturing, and storage facility. Work is to include concrete footings, concrete stem walls, concrete pedestals, concrete slab on grade, concrete vibration isolation slabs, concrete elevator pit and masonry elevator shaft, an exterior recessed concrete loading dock, steel columns, steel beams, steel column and beam moment frames, steel roof and wall purlins, steel rod cross braces, standing seam metal roof panes, metal wall panels, steel stud exterior walls, steel stud exterior shear walls with fire-retardant-treated wood structural panels, masonry tile exterior wall finish, porcelain stone exterior wall tile, stucco, exterior windows, exterior doors, exterior overhead doors, metal awning, concrete upper level floor on steel pan deck, a gypsum board ceiling with metal studs joists not designed as a floor above toilet rooms and other rooms, interior steel stairways with concrete filled metal pan treads and landings, interior nonbearing walls, a 1-hr fire sprinkler riser room (unless the post valve indicator is installed on the exterior of the building), a 2-hr hazardous materials storage room, spill control curbs, a flammable liquids interceptor, a crane with crane beams and lateral bracing, 6 toilet rooms accessible to the disabled, one shower room accessible to the disabled with an accessible alternate roll-in shower, interior windows, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, millwork, and finishes. Concrete retaining walls will be constructed near the canal. A stand-alone 98 square foot bike rack canopy will be constructed. A masonry trash enclosure with steel gates where the masonry walls also function as retaining walls will be constructed. Special inspection is required for soils, concrete, masonry, steel (including welding and high strength bolting), and anchors post-installed in hardened concrete. A separate permit is required for storage racks that are over 8 feet tall. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection7/28/20207/31/20207/31/2020ACANC
DetailsJim Page
SCREENED // Ty Phone #: ###-#### cancel per Ty
BLD-Final7/28/20207/31/20207/30/2020PCANC
DetailsBrandon Shaw
SCREENED // Ty Phone #: ###-#### cancel per ty
BLD-Final7/27/20207/27/20207/27/2020PNR
DetailsBrandon Shaw
Pre-final walk thru...
Zoning Approval7/27/20207/27/20207/27/2020 PASS
DetailsKatelyn Menuge
OVERRIDE  7/20/2020  
Plan assigned to (CJW)7/14/20207/14/20207/20/2020 PASS
DetailsCarl Westfall
plan mod - Ace Co (routed to staff)
CHANGE STATUS TO (ISS)  7/20/2020 DONE
Plan Reviewer's activity  7/20/2020 PASS
5th plan mod review approved
Permit Ready to Issue  7/20/2020 DONE
plan mod approved

DO NOT RE ISSUE
Routing - PLUMBING7/15/2020 7/16/2020 PASS
DetailsDaryl Spivey
Plan mod approved
Routing - PLAN CHECK7/15/2020 7/15/2020 PASS
DetailsCarl Westfall
5th plan mod IBC review approved
Routing - PLAN CHECK7/14/2020 7/14/2020 PASS
DetailsCarl Westfall
5th plan mod plan intake review approved
Plan Modification Accepted  7/14/2020 DONE
This modification is to identify the reduced pressure back flow preventer at the water service to the building.
CHANGE STATUS TO (ISS)  7/8/2020 DONE
OVERRIDE  7/7/2020  
Permit Ready to Issue  7/7/2020 DONE
4th plan mod approved
DO NOT RE ISSUE
Plan assigned to (CJW)7/2/20207/2/20207/6/2020 PASS
DetailsCarl Westfall
plan mod - Ace Co (plan intake approved)
Routing - PLAN CHECK7/2/2020 7/6/2020 PASS
DetailsCarl Westfall
4th plan mod plan intake review approved
Routing - PLAN CHECK7/6/2020 7/6/2020 PASS
DetailsCarl Westfall
4th plan mod review approved
Plan Reviewer's activity  7/6/2020 PASS
4th plan mod plan review approved
BLD-Conference7/2/20207/2/20207/2/2020PPART
DetailsBrandon Shaw
Ceiling grid, OK to cover perimeter, need trades approval for all ceiling grid...
BLD-Ceiling Grid Inspection7/1/20207/2/20207/2/2020PCANC
DetailsBrandon Shaw
Herb *screened* Phone #: ###-####
Plan Modification Accepted  7/2/2020 DONE
Call out production equipment in manufacturing area as not apart of the building scope of work.

A141, A604, E4.1, E6.0, E7.0, E7.1, E7.2
BLD-Ceiling Grid Inspection6/25/20206/29/20206/29/2020PCANC
DetailsBrandon Shaw
screened // Herb Phone #: ###-####
FIRE-Final Inspection6/26/20206/26/20206/26/2020PFAIL
DetailsTroy Cobbley
Inspection was actually for a conferene to go over life safety items. I agreed a fire lane sign could be mounted on the wall at the property entrance. I pointed out the requirement for panic hardware in the path of egress from the Break Room. Break Room would also need Occupant Load sign, need Fire Dept radio verified per notes, need signage on Riser Room and Electrical Rooms doors....ect.

Herb *screened* Phone #: ###-####
BLD-Conference6/25/20206/26/20206/26/2020ACANC
DetailsTony Young
screened // Herb Phone #: ###-####// wanted a fire conf.
CHANGE STATUS TO (ISS)  5/7/2020 DONE
BLD-Framing/Rough-in5/5/20205/6/20205/6/2020APASS
DetailsBrandon Shaw
Herb Phone #: ###-####
Telephone call  5/6/2020 DONE
Sent email to GC that there are still PWK fees due. Cannot issue the permit until those have been paid.
OVERRIDE  5/5/2020  
Plan assigned to (CJW)4/17/20204/17/20205/5/2020 PASS
DetailsCarl Westfall
plan mod 3 - AceCo
Plan Reviewer's activity  5/5/2020 PASS
Plan mod routing completed and review approved
Permit Ready to Issue  5/5/2020 DONE
Plan mod Approved
Routing PW Street Lights4/24/2020 5/1/2020 PASS
DetailsTom Marshall
Plan Reviewer's activity  4/29/2020 DONE
Emailed Jason Taylor inquiring about the status of the PW reviews.
Routing PW Drainage4/29/2020 4/29/2020 PASS
DetailsJason C. Taylor
BLD-Energy code compliance4/27/20204/28/20204/28/2020APART
DetailsBrandon Shaw
East exterior wall...
FIRE-Conference4/23/20204/23/20204/23/2020PDONE
DetailsJim Page
Fire conference is complete. Conference was able to be completed by phone. Conference was to question whether a egress double door section could have one leaf made in-active. Instructed Herb to verify occupant load exiting amount to verify if a leaf can be made in-active or if both leafs on the double door need to be operational for egress purposes.

Screened- would prefer conference in person if possible, up to inspectors discretion- Herb Phone #: ###-####
Routing - Design Review4/22/2020 4/23/2020 PASS
DetailsKatelyn Menuge
Routing - PLAN CHECK4/22/2020 4/22/2020 PASS
DetailsCarl Westfall
Back from the permits desk
Routing - PLUMBING4/22/2020 4/22/2020 PASS
DetailsDaryl Spivey
Plan mod approved
Routing - PLAN CHECK4/17/2020 4/20/2020 PASS
DetailsCarl Westfall
3rd plan mod plan intake review approved
Plan Modification Accepted  4/17/2020 DONE
3rd plan mod requested: The owner has requested an additional overhead door from room 144 - heat treat to the exterior which is reflected on sheets A101, S1.4, S2.2. The inspector has requested overflow rood drains be added and those changes are reflected on sheets A502, and P1.1. A previous plan modification required landscape changes at the east end of the site for an electrical utility screen wall,The attached civil sheets reflect needed changes to accompany that changed work.
BLD-Framing/Rough-in4/13/20204/13/20204/13/2020PPART
DetailsTony Young
Herb Phone #: ###-####,, 2nd floor interior walls ok after bracing tops better, pending trades
BLD-Framing/Rough-in3/25/20203/25/20203/25/2020PPASS
DetailsMike Jordan
Herb Phone #: ###-####. Interior steel stud framed walls only for 1st. floor office area. No grid or hardlids at this time.
BLD-Conference3/10/20203/11/20203/11/2020ADONE
DetailsBrandon Shaw
Pre-framing walk thru...
OVERRIDE  3/4/2020  
Plan assigned to (CJW)2/24/20202/24/20203/4/2020 PASS
DetailsCarl Westfall
plan mod (AceCo Precision Manufacturing) (routed to staff)
CHANGE STATUS TO (ISS)  3/4/2020 DONE
Plan Reviewer's activity  3/4/2020 PASS
2nd plan mod review approved
Permit Ready to Issue  3/4/2020 DONE
plan mod approved
Routing - MECHANICAL2/26/2020 2/27/2020 PASS
DetailsTroy James
Routing - PLUMBING2/26/2020 2/27/2020 PASS
DetailsDaryl Spivey
Per plan and ISPC.
BLD-Wall Bracing2/25/20202/26/20202/26/2020APART
DetailsBrandon Shaw
Exteroir walls, South and East sides...
Routing - PLAN CHECK2/25/2020 2/26/2020 PASS
DetailsCarl Westfall
Plan mod review approved
Routing - PUBLIC WORKS2/26/2020 2/26/2020 PASS
DetailsCandy A. Nichols
CREDIT FOR DEMO-NO FEES DUE-REFUND ISSUED
Routing PW Sewer Rating2/26/2020 2/26/2020 PASS
DetailsCandy A. Nichols
1 added sink, 1 deleted toilet-CREDIT FOR DEMO-NO FEES DUE-REFUND ISSUED
Routing - PLAN CHECK2/24/2020 2/25/2020 DONE
DetailsCarl Westfall
Plan intake review approved
Plan Modification Accepted  2/24/2020 DONE
site plan has been modified to accommodate eletrical service site infrastureure. Two transformers instead of one, will be placed in a parking island on the southern line of parking. The island has been made larger by omitting one parking space to allow both transformers and the landscaping. as identified in the partial site plan, the design for the line of parking facing the street has moved 6' to allow for sufficient space for a pad mounted IPCO meter and a box mounted switch that sites on a vault. the switch and meter are to be screened by CMU block wall that will provide adequate clearance for service and utilities: landscaping and associated site work such as drainage will be adjusted to the new design
BLD-Framing/Rough-in2/12/20202/12/20202/12/2020PPART
DetailsBrandon Shaw
OK to cover parapet walls, at roof line and up only...
OK to cover wall at grid line G, one side only...
BLD-Framing/Rough-in1/22/20201/23/20201/23/2020APART
DetailsBrandon Shaw
East entry and North walls, OK to cover exterior only...
CHANGE STATUS TO (ISS)  1/14/2020 DONE
plan mod
OVERRIDE  1/9/2020  
Plan assigned to (CJW)12/20/201912/20/20191/9/2020 PASS
DetailsCarl Westfall
plan mod - Ace Co (routed to staff)
Plan Reviewer's activity  1/9/2020 PASS
The Plan Mod was approved
Permit Ready to Issue  1/9/2020 DONE
plan mod approved (fees due)DO NOT RE ISSUE
Routing PW Street Lights  1/6/2020 PASS
Routing PW Drainage  12/24/2019 PASS
Routing - Design Review  12/24/2019 PASS
Redlined landscape plan.
Routing - PLAN CHECK12/21/2019 12/23/2019 PASS
DetailsCarl Westfall
Plan mod plan intake review approved. Plan mod review approved.
Plan Modification Accepted  12/21/2019 DONE
Workflow in ePlanReview received
Plan Modification Accepted  12/20/2019 DONE
Plan mod
BLD-Conference12/12/201912/12/201912/12/2019PDONE
DetailsBrandon Shaw
Herb Phone #: ###-####
BLD-Concrete9/24/20199/25/20199/25/2019APASS
DetailsBrandon Shaw
SOG pour 2am. Special inspection performed by Geotek for rebar and concrete strength test.
Ok after spec inspection sign offs...
BLD-Concrete9/10/20199/10/20199/10/2019PPASS
DetailsBrandon Shaw
Pour SOG 8” floor from grid lines 14-3 and H-E. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD-Footing9/10/20199/10/20199/10/2019PPASS
DetailsBrandon Shaw
Pour 1:30 pm for footings on grid line c.3. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD-Concrete8/30/20199/5/20199/5/2019PPASS
DetailsBrandon Shaw
Rebar and concrete inspection on building finish floor pending special inspection by Geotek.
Ok after spec inspection sign offs...
BLD-Concrete8/30/20199/3/20199/3/2019APASS
DetailsBrandon Shaw
Rebar and concrete inspection on com room lower slab, pending special inspection by Geotek.
Ok after spec inspection sign offs...
BLD-Concrete8/26/20198/26/20198/26/2019PPASS
DetailsBrandon Shaw
Building pad pour Tuesday 2am. Grids 17-3 and J-H. Special inspection for rebar and concrete done by Geotek.
Ok after spec inspection sign offs...
BLD-Footing8/20/20198/21/20198/21/2019APASS
DetailsBrandon Shaw
Rebar inspection on footing and stem wall along grids A and B.1 from 1-17. Special inspection performed by Geotek.
Ok after spec inspection sign offs...
BLD-Footing8/13/20198/14/20198/14/2019ACANC
DetailsBrandon Shaw
Footing pour grid A from 1-9. Walls on grid 1 from H-D. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD-Footing8/7/20198/9/20198/9/2019APASS
DetailsBrandon Shaw
Inspection of rebar In footings. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD-Footing8/7/20198/9/20198/9/2019APASS
DetailsBrandon Shaw
Inspection of rebar In footings. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD-Footing8/7/20198/8/20198/8/2019APASS
DetailsBrandon Shaw
Inspection of rebar In footings. Special inspection done by Geotek.
Ok after spec inspection sign offs...
BLD-Footing8/7/20198/7/20198/7/2019PPASS
DetailsBrandon Shaw
Inspection of rebar In footings. Special inspection done...
Ok after spec inspection sign offs...
BLD-Footing7/31/20198/1/20198/1/2019APEND
DetailsBrandon Shaw
Footing pour grid line I from 8-2 including elevator pit. Special inspection
Ok after spec inspection sign offs...
BLD-Footing7/29/20197/31/20197/31/2019APASS
DetailsBrandon Shaw
Pouring footing pads along grid line H from 13-1. Special inspection for rebar done by Geotek. Phone #: ###-#### Inspection requested via web by Jason Allen
BLD-Footing7/29/20197/30/20197/30/2019APASS
DetailsBrandon Shaw
Footing pour grid 5 to1 to H. Special inspection by Geotek in AM. Phone #: ###-#### Inspection requested via web by Jason Allen
BLD-Foundation7/24/20197/26/20197/25/2019APART
DetailsBrandon Shaw
Concrete foundation walls being poured 7am Friday July 26. Pending special inspection by Geotek. Phone #: ###-#### Inspection requested via web by Jason Allen
BLD-Footing7/16/20197/17/20197/17/2019APASS
DetailsBrandon Shaw
Work in progress...
Pending special inspection...
BLD-Footing7/8/20197/9/20197/9/2019PPART
DetailsBrandon Shaw
Pending special inspection...
Grid line 15- 17...
Print Occupancy Form  6/18/2019 DONE
Issue PAID IN FULL permit  6/18/2019 DONE
Meeting  6/14/2019 DONE
emailed over our fees to joseph pellatt and informed him we still need ACHD. see email in documents
OVERRIDE  6/11/2019  
Routing - FIRE6/6/20196/6/20196/11/2019 PASS
DetailsErika Akin
Attached comments to case
Plan assigned to (CJW)2/7/20192/11/20196/11/2019 PASS
DetailsCarl Westfall
(1st done) 03/13/19 (new - 25 days) (eplan - 185 sheets) Ace Co (routed to staff)
PLANS/APPL TAKEN TO FRONT DESK  6/11/2019 DONE
Permit Ready to Issue  6/11/2019 DONE
MET jpellatt@k2cm.com
NEED
ACHD
GC FORM
REVISED VALUE
Routing PW Street Lights6/6/2019 6/7/2019 PASS
DetailsTom Marshall
Plan resubmittals received  6/6/2019 DONE
Routing - PLAN CHECK6/6/2019 6/6/2019 PASS
DetailsCarl Westfall
Plan resubmittals requested  6/5/2019 DONE
Routing - FIRE5/21/20195/21/20196/4/2019 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
Routing - PLAN CHECK5/20/2019 5/29/2019 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL5/21/2019 5/28/2019 PASS
DetailsCarl Westfall
Sidney Gold (KPFF)
Routing PW Drainage5/21/2019 5/24/2019 PASS
DetailsBrian Murphy
Routing PW Street Lights5/21/2019 5/22/2019 FAIL
DetailsTom Marshall
Plan resubmittals received  5/20/2019 DONE
Route to Impact Fee Review3/22/20193/25/20193/26/2019 PASS
DetailsKarina Myles
Review requested for Commercial Permit
Plan resubmittals requested  3/22/2019 DONE
Routing - FIRE2/7/20192/11/20193/21/2019 FAIL
DetailsErika Akin
Attached comments to case and emailed architect
1st review completed  3/21/2019 DONE
Routing - PLAN CHECK2/7/2019 3/19/2019 FAIL
DetailsCarl Westfall
Revised drawings required
Routing Off Site - STRUCTURAL2/11/2019 2/27/2019 FAIL
DetailsAdele J Schaffeld-Griffin
Sidney Gold (KPFF)
Routing PW Drainage2/11/2019 2/26/2019 PASS
DetailsBrian Murphy
Routing PW Environmental2/11/2019 2/20/2019 PASS
DetailsTerry Alber
No pretreatment issues. Flammable interceptor in place.
Routing - MECHANICAL2/11/2019 2/14/2019 PASS
DetailsTroy James
Routing PW Street Lights2/11/2019 2/13/2019 FAIL
DetailsTom Marshall
Routing PW Sewer Design2/11/2019 2/11/2019 PASS
DetailsDeAnn Brown
Routing PW Solid Waste2/11/2019 2/11/2019 PASS
DetailsEvan Carpenter
Routing - PLUMBING2/11/2019 2/11/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING2/11/2019 2/11/2019 PASS
DetailsDavid Moser
SEE DRH18-00313
Routing - Addressing2/11/2019 2/11/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS2/11/2019 2/11/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment2/11/2019 2/11/2019 PASS
DetailsAndy J. Long
SWPPP approved, certified stormwater team designated.
Routing - Design Review2/11/2019 2/11/2019 PASS
DetailsKatelyn Menuge
DRH18-00313
Intake Approval  2/7/2019 PASS
DetailsMichael Hanson
Prescreen approved M_H.
Intake Approval  2/6/2019 FAIL
DetailsMichael Hanson
Coversheet of #310 form must be completed in all fields and signed and dated by owner and stamped, signed and dated by engineer.
Revise an d resubmit with the exact same file name so that it versions over the original.
Application received  2/4/2019 DONE
Application submitted via PDS Online on Feb 4 2019 3:58PM