BLD-Final | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PASS |
Jim Storey
|
|
|
Paul Phone #: ###-####
|
FIRE-Final Inspection | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, final life fire safety inspection for area of work complete.
Paul Phone #: ###-####
|
Permanent Occupancy | | | 2/20/2019 | | DONE |
|
|
|
|
BLD-Final | 2/8/2019 | 2/11/2019 | 2/11/2019 | P | NR |
Jim Storey
|
|
|
Sharleen Phone #: ###-#### fire failled
|
FIRE-Final Inspection | 2/8/2019 | 2/11/2019 | 2/11/2019 | A | FAIL |
Jim Page
|
|
|
A wall has been added in area of tenant space that is not on the city approved drawings, need drawings updated with the city to show wall addition. Added wall has effected fire sprinkler coverage, fire sprinkler head is overspaced due to wall addition, any modifications to fire sprinkler system requires a permit.
Sharleen Phone #: ###-####
|
Plan assigned to (M_H) | 2/7/2019 | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
02/13 #528 L2 Paper
|
Routing - PLAN CHECK | 2/7/2019 | | 2/8/2019 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2019 | | DONE |
Michael Hanson
|
|
|
|
Print Occupancy Form | | | 2/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2019 | | DONE |
|
|
|
met
|
Telephone call | | | 2/8/2019 | | DONE |
|
|
|
Spoke front office to inform them the permit is ready.
|
Issue PAID IN FULL permit | | | 2/8/2019 | | DONE |
|
|
|
|
Intake Approval | | | 2/7/2019 | | PASS |
Michael Hanson
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/7/2019 | | DONE |
|
|
|
|
First Notice | | 3/2/2019 | | | |
|
|
|
|
Application received | | 2/7/2019 | | | |
|
|
|
|