BLD-Final | 7/6/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by russell reber
|
DOC - Permit Finaled | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Mike Jordan
|
|
|
|
Letter of compliance/Occupancy | | | 7/6/2020 | | DONE |
|
|
|
|
BLD-Final | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Ed Kron. Needs to complete driveway.
|
BLD-Framing/Rough-in | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade. . All issues resolved.
|
BLD-Energy code compliance | 3/31/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Energy code compliance | 3/26/2020 | 3/30/2020 | 3/30/2020 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ed Kron Inspection cancelled from web by: Ed Kron
|
BLD-Energy code compliance | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | NR |
Mike Jordan
|
|
|
Ed Phone #: ###-####
|
BLD-Energy code compliance | 3/18/2020 | 3/18/2020 | 3/18/2020 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Framing/Rough-in | 3/18/2020 | 3/18/2020 | 3/18/2020 | A | FAIL |
Mike Jordan
|
|
|
Please call 15 minutes prior to inspection Phone #: ###-#### Inspection requested via web by Shane Shade. Fire caulk penetrations in fire wall, patch holes in draft stop in attics, contractor to address sill heights for egress windows. fireblock chase at ceiling upstairs. ok to insulate.
|
BLD-Framing/Rough-in | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | NR |
Mike Jordan
|
|
|
SHANE Phone #: ###-####. Needs to complete airseal pak.
|
Fees Due Hold | 3/13/2020 | | 3/16/2020 | | DONE |
|
|
|
|
Routing - MECHANICAL | 3/11/2020 | | 3/11/2020 | | PASS |
Troy James
|
|
|
Resubmitted ACCA reports
|
Plan Modification Accepted | | | 3/10/2020 | | DONE |
|
|
|
plan mod for manual J request per Megan Fuller
|
BLD-Wall Bracing | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD-Foundation | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 11/25/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru
|
BLD-Footing | 11/24/2019 | 11/25/2019 | 11/25/2019 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo aggregate constru. Cancelled by contractor via phone call.
|
Issue PAID IN FULL permit | | | 6/24/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/20/2019 | | |
|
|
|
|
Routing - FIRE | 6/17/2019 | 6/17/2019 | 6/20/2019 | | PASS |
Lee G Meredith
|
|
|
06/24-7200 Denton Resubmital LM
Sprinklers not required.
|
Plan assigned to (J_N) | 4/30/2019 | 4/30/2019 | 6/20/2019 | | DONE |
Jenny Nelson
|
|
|
05/17 duplex L2 ePlan. 2nd 6/4 - failed fire. 1st complete 5/15 clarify notes, update PFG detail
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
|
Routing - FIRE | 6/4/2019 | 6/4/2019 | 6/4/2019 | | FAIL |
Lee G Meredith
|
|
|
|
Routing - PLAN CHECK | 6/4/2019 | | 6/4/2019 | | PASS |
Jenny Nelson
|
|
|
|
Routing - FIRE | 5/14/2019 | 5/14/2019 | 5/15/2019 | | FAIL |
Lee G Meredith
|
|
|
Need fire flow availability report from SUEZ and documentation that the driveway meets the minimum requirements to support a fire truck.
|
1st review completed | | | 5/15/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 4/30/2019 | | 5/15/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 5/6/2019 | | 5/6/2019 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 4/30/2019 | 5/3/2019 | 5/1/2019 | | PASS |
Karina Myles
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/30/2019 | | 5/1/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - Addressing | 4/30/2019 | | 4/30/2019 | | PASS |
Doug Chausow
|
|
|
7200 and 7226 W Denton St
|
Routing - PUBLIC WORKS | 4/30/2019 | | 4/30/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - MECHANICAL | 4/30/2019 | | 4/30/2019 | | FAIL |
Troy James
|
|
|
Emailed corrections to Connor
|
Plans ACCEPTED BY PLAN TECH | | | 4/30/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/30/2019 | | DONE |
|
|
|
|
Intake Approval | | | 4/30/2019 | | PASS |
|
|
|
|
Meeting | | | 4/29/2019 | | DONE |
|
|
|
Emailed Applicant and GC to confirm the floor plans and site plans submitted for prescreen match DRH18-00214 plan modification approval.
|
Intake Approval | | | 2/28/2019 | | FAIL |
|
|
|
Drawings need to be individual files with correct file names.
DRH plan mod needs to compeleted before resubmitting.
|
Application received | | | 2/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 25 2019 10:02AM
|
Intake Approval | | | 2/25/2019 | | FAIL |
|
|
|
Manual J for both units, drawings need to be seperated. Per Andrea T, design review modification not finalized (footprint of building may change, need to finish scope of work at that point)
|